Five Summaries on the Personal Work of the Builders
Personal work summary of the builder 1
I worked in _ _ _ _ _ _ _ _ Industrial Development Co., Ltd. for two months and worked in the site management department of the engineering department. During this period, I learned a lot of professional knowledge about construction management, met many tutors and accumulated a lot of work experience. Thank the company for giving me the space, courage and confidence to grow up. In two months, through unremitting efforts, I learned a lot about construction engineering, but I realized that in order to devote myself to my work, I should further learn relevant professional and technical knowledge and improve my construction management knowledge. Looking back, the work is summarized as follows:
I. Summary of work
During my work, I studied, supervised and managed the construction projects of single dormitory, staff canteen and Shanxi mature vinegar warehouse. Further understand and master the vinegar industry project in Fen Liang.
Second, the work progress
1, May 23, single dormitory construction, learning single dormitory foundation pit excavation and backfill related processes and standards. On May 27th, the canteen was started to learn and supervise the related construction process of the canteen. In the following more than half a month, I tracked the construction progress of the staff canteen and single dormitory, and learned the related process operations and technical standards such as foundation pit excavation, backfilling, steel bar acceptance, formwork acceptance, cushion layer and foundation engineering. Great progress has been made in engineering construction technical standards and project schedule management. On the premise of constantly improving relevant professional knowledge, the company leaders put me in charge of the construction project of Shanxi mature vinegar warehouse.
2./kloc-started to be responsible for the construction of Shanxi mature vinegar warehouse in June of 0/5. /kloc-in June of 0/5, the foundation pit of the aged vinegar warehouse was excavated, 16 pliers completed the excavation, and 17 pliers completed the excavation. At the end of June, the first gravel backfill compaction of foundation pit was completed.
3. Cooperate with purchasing and related logistics.
Three, the main problems in the work are:
Because I just started to contact the project, I am familiar with the drawings and have relatively insufficient construction experience at work. But through these two months' study, I have learned a lot about the technical standards and professional technical management in the construction process. In the future work, I will continue to study, improve my professional and technical knowledge, improve my cognitive ability to work, and better devote myself to my work in the future.
Fourth, work experience.
1. During these two months' work practice, I participated in many collective work and got along well with my colleagues. In this process, I strengthened the most precious and important team consciousness. On the basis of trusting yourself and others, the team will be invincible if they have unified thoughts and actions. In the project, everyone reminds each other and complements each other, which improves the work efficiency. Communication is the most important thing in all work, so we must deal with information timely, effectively and clearly.
2. Every step of work should be precise and meticulous, and strive for refinement. Under the guidance of this mentality, being able to act positively and confidently is the biggest progress in my mentality in the past two months.
3. In my work, I learned a lot of technical knowledge and strengthened my awareness of project quality, cost and progress. The cooperation with colleagues around me is more tacit. There must be a teacher in a threesome. I learned a lot of knowledge and skills from them and the truth of being a man. I am very happy to be here.
I can take them with me when I first hit the road. I will definitely form an excellent team with them and make better achievements.
Verb (abbreviation of verb) working face
In the second half of the year, the company will speed up the project progress, and the work pressure will be even greater. Should be able to bear hardships and stand hard work, be diligent, do every job in a down-to-earth manner, handle every detail, strive to improve their skills and execution, and grow and progress as soon as possible. Among them, the following points are the focus of my improvement next year:
1, improve the initiative of work, do things simply and decisively, and don't be slow;
2, improve the overall situation, whether can let others work more smoothly as a yardstick to measure work;
3, seize every opportunity to improve professional ability, strengthen the usual knowledge summary work;
4. Thinking and practice of fine chemical industry.
As new employees, all localities need to learn, listen more, see more, think more, do more and communicate more, learn from each employee their excellent work habits and rich professional skills, and cooperate with the continuous progress of practical work. No matter what the environment, I believe in these two points: one is that three people must have a teacher, and the other is that diligence can make up for it. Sometimes I deeply realize that your work can't be perfect if you put your energy into it. After all, the work project is so complicated that few people will understand it, but you should do more and learn more. I
I believe that as long as you do things seriously and treat people honestly, you will definitely become a qualified person in the company.
Summary of the personal work of the builder II
First, the completion progress of the project:
After entering the site in May, the project department will be established, and the basement structure construction of Building _ _ will be completed before the construction application according to the owner's requirements, and the secondary construction of the office area and the construction of workers' living quarters will be completed during the owner's pile foundation construction; On February 5, 65438, the owner began to intervene in the construction under the condition that the earthwork was not completed and the foundation pit support was not completed. Before February 27, 65438, the construction of foundation brick mold and bottom pad, and the installation and acceptance of tower crane were completed.
Second, the progress control summary of the construction process
From 65438+February 5th, _ _ Group officially issued the commencement order to this project, and the project department completed the construction according to the requirements of the owner, planned the construction personnel, construction machinery and construction materials in advance, issued the construction task list to each construction team, and quantified the workload and the feasibility of the corresponding operators in the construction task list, so as to meet the construction requirements without wasting manpower and material resources.
Third, the construction quality control summary
In order to build the office building project of Building _ _ into a project that the owner is satisfied with, all the staff of the project department earnestly implement the project quality objectives, shoulder their own management responsibilities according to the company's quality policy, and organize the construction and management scientifically and effectively.
Quality is the life of an enterprise, and it is also the guarantee for enterprises to create benefits. Creating high-quality projects is the aim of our project department and the will of all the staff of the project department. In order to achieve the predetermined quality objectives, in the process of engineering construction, our project department has formulated a set of feasible quality management schemes:
(1) The system of sample and technical disclosure shall be implemented in engineering construction, and the technical personnel of the project department shall make technical disclosure to the construction team and workers. Clear technical disclosure: from the beginning of operation, technicians should give technical and quality guidance to workers seriously, so that workers can firmly master various construction technologies and ensure that every worker can understand the operation requirements and master the requirements of specifications and standards.
For the key and difficult points in engineering construction, disclosure should be made to relevant construction teams and personnel before construction, and construction quality standards should be strictly controlled. Changed the previous practice of technical disclosure as a mere formality, and let all managers of the project department erect quality objectives and follow them in all construction processes according to the established quality objectives. Judging from the current construction situation, this management method is effective and practical.
(2) Strictly control the materials entering the construction site.
Check and inspect the quantity and quality of materials entering the site, and exit the materials that do not meet the quality requirements (for example, if the quality of the first batch of templates does not meet the requirements in the construction of additional basement, insist on returning them).
(3) Strengthen the quality control of the construction process, and require the construction personnel to make disclosure before the construction of each sub-project, and conduct inspection during the construction process. If unqualified parts are found, rework in time, control the construction quality during the construction process, strengthen the "self-inspection, mutual inspection and handover inspection" and the inspection and acceptance system of the builders of the project department, and strictly implement the reward and punishment system for unqualified samples, which improves the sense of responsibility of managers and workers and avoids the delay in construction period and the waste of materials caused by rework.
(4) Reasonable overall arrangement of construction procedures and crossover operations, saving time limit for a project, instilling the idea that saving time limit for a project is to save costs and create benefits into the whole project management team, establishing a protection system for finished construction products, and earnestly implementing it in construction.
Four. Summary of safe and civilized construction
(1) Site civilized construction management, _ _ building office building project closed management, main construction site hardening, all temporary facilities and site layout are implemented according to the current standardized construction standards in Dongguan. Make the layout reasonable, the construction site neat and orderly, the materials neatly stacked, the safety signs obvious, and the labor discipline strict. The construction work is standardized, standardized and institutionalized, and everything has rules to follow, and special personnel are responsible and supervised, which is well documented. Strictly control civilized construction, and establish the project image and corporate image.
(2) Improve the system of safe production, strengthen the management of construction safety, fire safety and property safety of the project department, give safety education to workers, resolutely implement the idea of safety first and prevention first, rectify and eliminate the safety hazards on the construction site as soon as possible, equip the construction areas of living quarters and office areas with perfect fire-fighting facilities according to the standardization requirements, strengthen the quality of on-site security personnel, clarify the responsibilities of security personnel, and resolutely dismiss irresponsible security personnel.
The builder's personal work summary 3
_ _ year is about to pass, and a new year is about to begin. Unconsciously worked in a project department for four years. Looking back on the work process in the past four years, I really feel that four years have passed quietly in a blink of an eye. 20__ is a busy and fulfilling year for me. When I bid farewell to the old and welcome the new, summing up the experience and lessons from my work over the past year will help me to foster strengths and avoid weaknesses in my future work. After the project started, I was mainly responsible for the electrical engineering of the North District 1 #- 13 # building, and at the same time supervised the temporary electricity utilization on site. With the support of the leaders of the project department and the enthusiastic help of my colleagues, I am full of confidence in my work and have finished it in a pleasant and relaxed environment. During this period of work, I will summarize my work in the past year from several aspects.
A, engineering drawings review and technical disclosure
When I received the drawings of an engineering project, I immediately reviewed the drawings, and checked the design contents, power distribution system, fire protection system and weak current system one by one, so as to solve them in time when the blue prints.the design. When there is a conflict with the drawing construction, the project negotiation shall be conducted in time to lay a good foundation for the smooth progress of the project. According to the approved construction organization design and construction scheme and the current quality acceptance standard, the technical disclosure of technical quality, safety and fire protection for the construction team I manage is carried out. Due to the lack of design drawings that meet the use function, Party A often makes temporary changes during the construction process. For the changes that can be signed before construction, timely and accurately, some changes can not be signed before construction, and they should be verified immediately after construction.
Second, the site construction management and strict quality control
In order to improve the quality consciousness of the construction team, the team leader is given corresponding preventive measures for defects such as quality, reserved steel box and reserved pipeline protection in the secondary structure. At the same time, hold a special meeting on electrical engineering, analyze the causes of common faults in pipeline laying in the main body reservation and put forward corresponding preventive schemes, and consult the civil construction team in time to avoid affecting the progress of the main body project. The construction team should understand the possible problems of the secondary structure and check the concealed works at any time. Subsequently, strict requirements were put forward for the construction quality of this department, and the quality problems in each building were inspected and rectified in time. In order to better cooperate with the overall progress of the project, the working procedures that affect the overall progress of the project should be solved on the spot in time.
Third, raw material control and data archiving
With the intensification of market competition, all kinds of unqualified products can enter the site at any time. In order to ensure the quality of the project, all electrical materials entering the site are strictly inspected. I fully realized the importance and arduousness of this work, so I made up my mind to do it well and prevent unqualified materials from entering the construction site. In March, the project department launched the activity of "Three Guarantees and One Reduction". In order to avoid the waste or loss of engineering raw materials, I issued a notice to all construction teams on the cleaning and utilization of raw materials. At the same time, without changing the design intention of the construction drawing, the wiring of the electrical construction drawing has been redesigned, which has played a certain role in the management of the building number. During the construction of the main part of the project, I collected the information of the building number I managed in time and accurately, and conducted material test, concealed engineering acceptance, inspection lot quality acceptance and sub-project quality acceptance, and found the signatures and seals of the land engineer and supervision engineer of Party A in time, ensuring that the inspection lot, sub-project acceptance, and material test dates of building materials were consistent with the actual construction dates, which met the requirements of construction data compilation. And timely sort out and file the engineering data to ensure the authenticity, integrity and effectiveness of the construction data.
Fourth, safe and civilized construction
According to the spirit of the safety instruction of the project department, check the temporary electricity consumption and civilized construction on the construction site every Monday. I am mainly responsible for the temporary electricity inspection in the North District, and deal with any potential safety hazards in time. Reduce the occurrence of electrical safety accidents in the construction process and create favorable conditions for the smooth construction of the whole project.
My biggest gain in the project is:
○ 1 building quality control
2 reduce the intersection of this project and the whole project.
3 control the waste of raw materials
4. The ability to deal with practical problems on the construction site.
The biggest deficiency in my work:
○ 1 Insufficient requirements for civilized construction in security team.
2 the quality management of workers in this department is not in place.
3. Lack of strengthening management of each construction team leader.
Future work plan:
By summing up my work in the past year, I found many shortcomings in my work in order to overcome them in my future work. At the same time, we need to read more books, study norms and related documents, master professional knowledge, improve our working ability, strengthen our sense of responsibility, and do our personal work in time. Generally speaking, I am not satisfied with the work of a certain project. I will constantly sum up and reflect in my future work, constantly push myself, enrich my energy, overcome the shortcomings in my work, study hard new working methods and improve my work level. I firmly believe that I will improve myself in my future work. Adapt to the times and the development of enterprises, make progress and grow together with the company.
In order to make our project department better tomorrow and improve the management level, I have several suggestions in my work:
1. Control of raw materials: I suggest that the project department set up a special warehouse for electrical appliances. My reason is that the wires are easily lost once they are taken away by the construction team after entering the site. The project department manages in a unified way how many threads are worn every day, and the remaining threads and waste threads are converted into meters by catty.
Second, management: I suggest that the living area and the construction site be separated. My reason is that wires, cables and all kinds of equipment are easy to be stolen after decoration. At the same time, security guards are required to strictly check the people and vehicles entering and leaving, or use red and ultraviolet instruments to check the people and vehicles entering and leaving. Only in this way can the losses of the project department be reduced.
The above points are still expected to be considered by the leaders. At the arrival of the new year, for the sake of the bright future of our project department, let our departments overcome all kinds of difficulties under the wise leadership of Manager Li, and greet a brighter future of our project department with more advanced management mode and updated appearance.
The builder's personal work summary 4
Twenty years' work is over. When we bid farewell to the old and welcome the new, we can sum up our work in the past year. There are progress, gains and achievements, but there are also shortcomings. ...
First, the overall working state
(A) the first half of the work-intense and busy green
In the first half of the year, he was responsible for the site management and data collection of the comprehensive building project of Anhui Tuoshan Heavy Industry Machinery Co., Ltd., the workshop project of Anhui Mashi Foundry Equipment Manufacturing Co., Ltd. and the 8# workshop project of Anhui Meinuohua Pharmaceutical Chemistry Co., Ltd., because the start-up time of the three projects was relatively concentrated, the main construction was carried out at the same time, so he was busy and had to carry out site management during the day. Despite this, there have been cases where several construction sites have things to deal with at the same time, and they have been complained because they cannot be present at the same time.
(B) the second half of the work-relatively easy.
In the second half of the year, Minova, Mars Foundry, Tuoshan Heavy Industry and Sucun Kindergarten successively completed the acceptance. In addition, two interns can also help me share part of the work, so the work in the second half of the year is relatively easy.
Second, perform job responsibilities
1. Be fully responsible for the organization, coordination and command of site construction.
After the establishment of each project department, I immediately assisted the project manager to conduct on-site inspection, draw the layout of the construction site, rationally plan the location of construction roads, yards, construction machines and tools and temporary facilities, and cooperate with the company's security department to guide the setting of temporary electricity consumption at the site. Several projects basically reached the construction specifications and safety acceptance standards at one time.
In the process of project implementation, after receiving the instructions from the company and leading departments at all levels, I conveyed and implemented them in time, and gave timely feedback on the implementation. Coordinate with the construction unit, supervision unit, project department and team for many times in the work to avoid differences and contradictions.
Over the past year, the work of each project department has been carried out smoothly, and the construction and production have been carried out in a healthy and orderly manner.
2. Technical guidance work
(1) Before the project starts, carefully study the drawings, summarize the problems found by the supervisor and each team, and solve them one by one in time in the blue prints.the design.
(2) Before each working procedure starts, technical disclosure shall be made to the team leader in time, and the construction of key parts shall be kept on the sidelines, and problems shall be solved in time when found.
(3) If there are problems in drawing design or construction, actively seek solutions and communicate with site supervisors and designers to ensure smooth construction.
3. Quality management
(1) Strictly control the quality of materials entering the site, including checking the quality assurance information, checking the appearance of materials, and sending samples for testing in time to prevent unqualified materials from being used in the project.
(2) Timely disclose the construction specifications and quality requirements to the team leader, and check their implementation.
Situation, increase the frequency and intensity of inspection, to avoid rework and quality hazards.
(3) Strictly implement the "three inspections" system. If any quality hidden trouble is found in any link, the relevant personnel shall be required to rectify immediately, and the next working procedure can only be carried out after the rectification is qualified.
4. Project management
(1) Make a general schedule before construction, make a monthly schedule and a schedule of specific processes (such as concrete pouring time) during construction, check the implementation of the schedule, and make reasonable adjustments when necessary.
(2) Coordinate each team to cooperate with each other, reasonably arrange cross construction, and speed up the construction progress to the maximum extent on the premise of ensuring quality and safety.
(3) Pay attention to the weather at any time, so as to adjust the operation plan and reduce the influence of the weather.
5. Cost control
(1) When calculating the required material quantity, we should try our best to be correct, communicate with experienced construction personnel more, reasonably determine the material loss quantity, and try our best to avoid increasing the procurement cost and storage cost due to inaccurate calculation.
(2) Rational use of reusable materials to avoid unnecessary waste.
(3) Strengthen guidance and management to reduce rework losses.
(4) Accelerate the construction progress reasonably and reduce the cost effectively.
6. Safety management
(1) Conduct regular safety education for team leaders and workers to improve workers' safety awareness.
(2) Hang safety signs and warning signs on the construction site to create a good safety production atmosphere.
(3) Strengthen the frequency and intensity of safety inspection to eliminate potential safety hazards in time.
(4) Punish those who fail to rectify potential safety hazards and obey safety production management, and clear the construction site when necessary.
7. Data collection and collation
(1) Collect all kinds of technical data and safety data in time to ensure that the data is synchronized with the progress.
(2) After the acceptance of each sub-division and sub-division project, the signature and seal formalities shall be handled in time to avoid the backlog of data.
(3) Data collection and arrangement should be properly kept to avoid loss.
(4) After the completion acceptance, timely handle the completion filing and data transfer.
8. Learning and training
In the past year, I have been constantly improving myself through study and training. In March of 20__, he passed the training and passed the examination, and obtained the B certificate of full-time safety production assessment. On September 20th, I took the national first-class construction engineer examination and passed three subjects.
Third, the shortcomings in the work and the direction of efforts
(A) not familiar with the implementation of the new specification
On May 20th, 2000, new codes were implemented, such as the retention scheme of mortar test blocks, the promotion of the use of high-strength steel bars, and the strengthening of seismic design. The company has purchased a complete set of specifications, and needs to strengthen study in the future work to avoid work mistakes caused by not understanding the new specifications.
(B) the feedback of the problem is relatively lagging behind
On the whole, the work in 20__ years has been carried out smoothly, but there are still some problems. For example, Tuoshan Heavy Industry had a dispute caused by workers asking for wages. Because it failed to gain insight in advance and give feedback to the company leaders, the dispute could not be avoided. Besides. In the comprehensive building project of Soter Auto Parts Co., Ltd., due to listening to Mr. Wang's one-sided words (Mr. Wang insisted that the company's leaders agreed not to make five certificates and one map on the site), the production time of five certificates and one map was delayed because of the delay in communication with the leaders.
(3) Strive to develop in the local direction in 20 years.
1. Strengthen learning, improve and accumulate experience and methods, carry out whole-process and all-round project management, and strive to become high-level and compound middle and senior management talents.
2. Strengthen the study of office software and improve work efficiency.
3. Strengthen theoretical study and combine it with practice, and strive to achieve good results in the 20__ year second-level constructor's additional test items and the first-level constructor's physical examination.
4. Strengthen communication with colleagues and leaders to carry out the work better.
Fourth, summary.
Looking back on the old year, it is both a tense year and a full year. Looking forward to the new year, in the new year, I will sum up experience, learn lessons, work harder, put myself into my work with a fuller and more down-to-earth work style, and make greater contributions to the company.
The builder's personal work summary 5
I. Work details
Structural part:
1. Before the commencement of construction, the construction unit shall prepare the professional construction plan in strict accordance with the requirements of design drawings, and prepare the operation instructions for key points, which shall be implemented after being confirmed by the supervision unit. At the same time, in the process of construction preparation, technical disclosure should be made to the team, and the team should be clear about the construction content and strictly abide by the construction specifications. In the process of construction, do a good job in the "three inspections" of team self-inspection, re-inspection and full-time inspection, and at the same time do a good job in quality inspection and evaluation records, hidden records and related quality assurance materials.
2. We strictly control the finished products, semi-finished products and raw materials in the construction process, and must have the factory certificate and product specifications. If the certificate is a copy, it is valid only if the person in charge of the original storage unit seals the copy. If there is a second interview requirement, witness sampling must be carried out according to the specification requirements, and a second interview report must be made, and it can only be used after it is qualified.
3. In the process of steel processing, if it is found that the welding performance or processing performance of steel bar is obviously poor, it is also necessary to carry out chemical composition inspection, and handle it in time if there is any problem. All welded joints and mechanical joints of steel bars shall be inspected in strict accordance with the corresponding specifications.
4. The construction period of the reinforced concrete structure of this project is from August, 20__ 19 to June, 20__1day. Concrete is commercial concrete, provided by _ _ Sheng Yuan and Shenghua Concrete Co., Ltd.
5. In the process of construction, I strictly follow the requirements of drawings and design changes, and the processes of steel binding, welding, molding, shuttering and concrete pouring all meet the requirements of Code for Construction and Quality Acceptance of Reinforced Concrete Structures and the requirements of the Engineering Supervision Department.
7. Foundations, columns and cast-in-place surfaces shall be covered with films and straw bags and stored in water for maintenance.
The construction quality of the main reinforced concrete structure is good, and it was rated as excellent in Jinan by _ _ Quality Supervision Station.
Building part:
1. Before commencement, the construction unit shall prepare the professional construction plan in strict accordance with the requirements of design drawings, prepare the operation instructions for key points, submit them to the construction unit for examination and approval, and implement them after being confirmed by the supervision unit. At the same time, in the process of construction preparation, technical disclosure should be made to the team, and the team should be clear about the construction content and strictly abide by the construction specifications. In the process of construction, do a good job in the "three inspections" of team self-inspection, re-inspection and full-time inspection, and at the same time do a good job in quality inspection and evaluation records, hidden records and related quality assurance materials.
2.。 During the construction process, finished products, semi-finished products and raw materials must be strictly controlled, and there must be factory certificates and product specifications. If the certificate is a copy, it is valid only if the person in charge of the original storage unit seals the copy. If there is a requirement for a second interview, a second interview report must be made according to the requirements of the specification, and it can only be used if it is qualified. After the main equipment, materials, finished products and semi-finished products in the project enter the site, we immediately notify the construction unit and supervision unit for acceptance, fill in the material inspection form in time, and provide relevant quality certificates of materials according to the requirements of design drawings and construction acceptance specifications.
3. Strictly control the inspection items of materials. The volume stability of cement must be tested before use. In the process of using cement, if it is found that it is caked by moisture or has been more than three months, it is strictly forbidden to use or lower the label after laboratory appraisal. In addition, the three tests of glass curtain wall, stone curtain wall and plastic steel doors and windows all meet the requirements.
4. Rachel reinforcement of brick masonry shall be constructed in strict accordance with design drawings and construction acceptance specifications, and hidden records shall be made at the same time.
5. The construction period of this project is from June 1 1 day to July 20th. In the construction process, we strictly follow the requirements of drawings, design changes and corresponding construction quality acceptance specifications, including building masonry, external wall plastering, ground plastering, door and window installation, architectural decoration, roof and bathroom waterproofing, etc. , the whole project in accordance with the design drawings and the corresponding construction quality acceptance specification for construction.
Second, work attitude and hard work.
Love your job, be able to treat every job correctly and seriously, and seriously abide by the company's rules and regulations. Make effective use of working hours, stick to your post, and need to work overtime to finish the work on time, so as to ensure that the work can be completed on time.
Three. Work quality, achievements, benefits and contributions
Make a personal work plan before the start of the work, give priority to all the work in time, achieve the expected effect, complete the work with good quality and quantity, and have high work efficiency. At the same time, I also learned a lot at work and exercised myself. Through unremitting efforts, I have made great progress in my work, created a new situation in my work, and made due contributions to the work of the company and departments.
Summarize five articles about the personal work of the builder:
★ 5 The builder's personal annual work summary.
Taken the builder's annual work summary 5.
★ Summarize 5 articles about the work of civil builders.
★ Year-end summary of five selected builders in 2020.
★ Five selected model essays for the year-end summary of the builder's personal work
★ The builder's annual work summary (7 general remarks)
★ Five articles about the builder's job self-evaluation.
★ Model essay on personal work summary of the builder
★ Five essays on the summary of builder's work in 2020.
★ Five Selected Summaries of Individual Annual Work of Construction Workers in 2020