Is Wuhan Qianchuan Line 7 open to traffic this year?
The north extension line of Wuhan Metro Line 7 starts from Huangpi Square in Qianchuan City, goes west along Huangpi Avenue, turns northwest after reaching the turntable, then runs parallel along Shuangfeng Avenue and Wuma Railway, from underground to elevated, enters the planned green ecological zone to the south, bypasses the existing villages, passes through the left line of Wu He Railway, the right line of Beijing-Guangzhou Expressway and Wu He Railway once each, and then passes through the throat of Wuhan North Marshalling Station and Wuhan Ring Expressway, and enters Hengdian Town.
The first phase of Qianchuan Line is scheduled to be completed in June 2022, and stations are stepping up station decoration, wind, water and electricity and equipment installation. It is planned to start trial operation in September.
The latest news from June 5438+ 10, 2022: the main structures of 9 stations on Qianchuan Line have been completed, and the main structures of 2 stations are under construction; 7 elevated sections are under superstructure construction; *** 15 single-line shield section, which has run through 4 sections, is being excavated 1 1 section.
The main structure of CNR base station on Qianchuan line was successfully capped, and BIM modeling realized the visual construction of subway. Located on the west side of Jingjiu Street, CNR base station is an elevated three-story island platform station with reinforced concrete frame structure. The station consists of the main body, the auxiliary building area, the overpass and four entrances and exits.