China Naming Network - Feng Shui knowledge< - Construction method of water mill floor

Construction method of water mill floor

Water mill floor is a popular floor decoration method in recent years, which is characterized by different patterns, wear resistance, easy cleaning, aesthetics and durability. So, how should we build a water mill floor? Next, I'll introduce you to the construction method of water mill floor:

1. Ready

First of all, we need to polish the ground to remove any dirt and defects on the surface. Then, we will mark the ground and divide the water mill floor into several parts to facilitate construction.

2. Concrete surface layer

Next, we will polish the concrete surface, and then mix cement and mortar to make the cement floor we need. During construction, attention should be paid to the construction method, time and temperature to ensure that the surface is dry and seamless (if there is a gap, it should be polished smoothly), and bubbles and holes should be eliminated.

Prepare ingredients

Then prepare water mill ingredients, which can be purchased in various decoration materials stores or online. The ingredients should be operated according to the manufacturer's instructions, mixed evenly, without any color and obvious changes.

Step 4 start construction

During construction, it is best to choose cool or cloudy weather in the morning or afternoon to avoid unnecessary losses caused by poor construction conditions in high temperature weather. First pour the basic color of the color on the floor carefully, and then draw it in the required area according to the design drawing. Be sure to keep your hands steady and at an appropriate speed, especially when you need to draw diagonal lines, circles and other geometric figures. After painting, we need to balance the ground with water washing or casters according to any relevant regulations and wait for drying. In about 1-2 days, we can use grinding and polishing again to get the best surface effect.

Use protective agent

After the construction is completed, the protective agent can be used to protect and protect the water mill floor to achieve a more lasting effect. However, before using the protective agent, we need to clean the surface to ensure that there is no dirt or attachment.

Summary:

Although the construction of water mill floor may be complicated and time-consuming, this method can create enviable surface effect and aesthetic feeling, as well as higher durability and strength, which is worth a try.