Introduction of Xihe Bridge in Ganzhou?

Ganzhou Xihe Bridge was built at 1955. At present, the carrying capacity of Xihe Bridge can no longer meet the needs of increasing traffic volume, so Ganzhou Municipal Government decided to demolish and rebuild it. The estimated construction period is two years. When completed, the new bridge will be two-way and six-lane, with a total length of 267 meters.

New bridge design planning

The newly-built Xihe Bridge is built according to the standards of urban main roads and large-scale urban bridges. The vehicle load is urban -A, the crowd load is 4.0KN/ m2, and the design speed is 50km/h; The bridge is 32.5 meters wide and has six lanes in both directions. Non-motor vehicle lanes and sidewalks are set on both sides of motor vehicle lanes, and cast-in-place prestressed concrete continuous box girders are used. The bridge is 267 meters long.

Present situation of new bridge

Due to the reconstruction of the new bridge, citizens on both sides of Zhangjiang are inconvenient to pass. According to reports, if citizens want to go to Hubin Town, Shuixi Town, Tongtianyan, Baohulu Farm and other scenic spots, the most convenient way for pedestrians and non-motor vehicles to pass is to take the temporary pedestrian trestle and then transfer to other means of transportation. At present, the temporary pedestrian trestle has been put into use, with a length of 216.6m and a width of 6m. This is a steel bridge. For some motorcycles and pedestrians, you can also choose to go to your destination through Xihe footbridge and Shuixi Village.

Ganzhou Xihe bridge

For more exclusive information about the construction industry, please pay attention to the micro-signal of the construction network in real time.