China Naming Network - Weather knowledge - What measures are there for heatstroke prevention and cooling (6 practical articles)

What measures are there for heatstroke prevention and cooling (6 practical articles)

? Go out for sun protection in summer and take heatstroke prevention supplies with you. The hot summer is coming. When heatstroke occurs in hot weather, nausea, dizziness, headache, fever and other adverse symptoms usually appear. What kind of summer heatstroke prevention and cooling scheme is well written? The following is the "What measures are there for heatstroke prevention and cooling (6 practical articles)" that I have carefully arranged for you, and I believe it can help you.

What measures are there for heatstroke prevention and cooling (6 practical articles)? In order to timely and effectively prevent and deal with heatstroke events caused by high-temperature meteorological conditions, guide and standardize the health emergency work of high-temperature heatstroke events, ensure public health and life safety, and maintain normal social order, this plan is formulated as follows:

? 1, earnestly implement the responsibility system for heatstroke prevention and cooling. Relevant units should conscientiously implement a series of requirements for heatstroke prevention and cooling at the construction site, strengthen the organization and leadership of heatstroke prevention and cooling with a highly responsible attitude towards the life and health of frontline construction personnel, improve and implement the responsibility system, formulate emergency plans, and pay close attention to the implementation of preventive measures to prevent workers from heatstroke and various production safety accidents caused by high temperature weather.

? 2, reasonable arrangement of work and rest time. Pay close attention to the weather forecast of high temperature weather. Meteorology defines the maximum daily temperature as "high temperature day" when it is greater than or equal to 35 degrees Celsius, and the "high temperature day" that lasts for more than 5 days is called "continuous high temperature". Strictly implement the measures of "grasping at both ends and intermittently" to avoid high temperature, appropriately adjust the labor rest system for high temperature operation in summer, reduce labor intensity, strictly control outdoor operation time, avoid operation during high temperature period, and ensure the health and life safety of workers. In principle, when the temperature exceeds 37℃, outdoor operation is strictly prohibited from1:00 to 15: 00.

? 3. Ensure that there is enough drinking water supply at the site. Adequate drinking water, beverages, tea and various soups that meet the hygiene requirements should be supplied on site to effectively prevent heatstroke and avoid heatstroke.

? 4. Strengthen the rotation rest at work. In summer, according to the technological process of construction, the labor organization should be adjusted as much as possible, and frequent shifts should be adopted to shorten the continuous operation time and strengthen the rotation rest at work. Strengthen on-site inspections, increase the publicity of heatstroke prevention and cooling knowledge and heatstroke first aid knowledge, and improve the safety awareness of all staff.

? 5. Actively improve the production and living environment of construction sites. We should conscientiously implement the Regulations on the Management of Construction Sites, actively take measures to strengthen ventilation and cooling, ensure that temporary facilities such as dormitories, canteens, toilets and showers for construction workers meet the needs of heatstroke prevention and cooling, and provide cool drinks and commonly used heatstroke prevention drugs for construction workers. Electric fans must be installed in the dormitory and canteen of the construction site, and units with conditions should install air conditioners in the dormitory.

? 6. Implement heatstroke prevention and cooling items. We should pay close attention to the front-line construction workers who insist on construction in hot weather, strengthen the propaganda of heatstroke prevention and cooling knowledge, require construction workers to carry heatstroke prevention drugs with them, such as Ren Dan, cooling oil and wind oil essence, and implement heatstroke prevention and cooling items for each worker.

? 7, do a good job of fire prevention in summer. In view of the fact that summer is hot, dry and prone to fire accidents, further strengthen fire prevention measures and regularly check flammable places such as power distribution room, warehouse and paint room. When problems are found, deal with them immediately, and equip them with fire-fighting equipment as required.

? 8. Do a good job in health and epidemic prevention. It is necessary to do a good job in health and epidemic prevention in the construction site and living quarters, strengthen the sanitary management of drinking water and food, strictly implement the food hygiene system, and avoid poisoning incidents caused by food deterioration; Strengthen the monitoring of summer-prone diseases. In case of legal infectious diseases and food poisoning, the on-site staff shall report to the relevant competent departments in time.

What measures are there for heatstroke prevention and cooling (6 practical articles)? In order to implement the spirit of the notice of the Education Bureau on heatstroke prevention and cooling, and ensure the health of teachers, students and staff in our school and the orderly progress of school teaching, based on the idea of "prevention is more important than Mount Tai" and combined with the reality of our school, the following emergency plan for heatstroke prevention and cooling is formulated.

? I. Organizational structure

? 1, the school set up a leading group for heatstroke prevention and cooling with the principal as the leader.

? 2. Seriously organize the study of heatstroke prevention and cooling related documents, report the situation in time, and ensure that ideas, organizations and measures are in place.

? Second, the responsibilities of various departments

? (1) Political and Educational Affairs Office and Academic Affairs Office

? (1) Arrange duty during high temperature.

? (2) If it is necessary to suspend classes temporarily in hot weather, the class teacher should be informed as soon as possible.

? (3) When classes are suspended due to power failure in hot weather, make arrangements for students' activities.

? (4) Do a good job in the education of heatstroke prevention and cooling, safety and other knowledge during high temperature.

? (2) General Affairs Office

? (1) Before the high temperature comes, organize personnel to inspect all cooling facilities in the school, and report for repair in time if there is any damage, so as to ensure the normal use in high temperature season, and inform all departments of the situation in time.

? (2) Do a good job in heatstroke prevention and cooling (buy necessary items for heatstroke prevention and cooling, such as mung beans).

? (3) Do a good job in ensuring electricity, water (drinking water), ice cubes and other items needed for heatstroke prevention and cooling in schools.

? (3) the class teacher

? (1) Every class teacher should manage the drinking water of the class and ensure the quality of the students' drinking water.

? (2) Sprinkle water on the floor of the class in time. Students should prepare clean towels and soak them in water on their heads or necks when necessary.

? (3) Students' physical reactions must be observed frequently in hot weather.

? Third, other work.

? Heatstroke prevention and cooling is a comprehensive work, and all departments of the school should cooperate with each other, support each other and be on call. All departments should try their best to do their own jobs, combine the heatstroke prevention and cooling work with the actual situation of this post, conduct a work scope inspection, and be at the disposal of the school heatstroke prevention and cooling leading group at any time. Qi Xin will work together to do a good job in heatstroke prevention and cooling this year.

? Fourth, specific measures.

? First, do a good job in heatstroke prevention propaganda. Use campus radio, theme class meetings and other publicity forms to publicize the common sense of heatstroke prevention and cooling, and educate students to actively cope with high temperature weather. Actively guide teachers and students to maintain a peaceful attitude, unity and harmony, and stable study and work in high temperature weather.

? The second is to strengthen food safety management. Schools should strengthen the sanitary inspection of canteens, disinfect them, open doors and windows to ensure ventilation. Ensure the hygiene of students' drinking water and prevent infection of gastrointestinal diseases.

? The third is to reduce students' outdoor sports. Cancel the strenuous activities such as recess exercises and physical education class, so as to avoid students' exposure and strenuous exercise outdoors for a long time.

? The fourth is to ensure that students have a full rest. Strengthen duty, maintain a safe and stable rest environment, and ensure students' mental state.

What measures are there for heatstroke prevention and cooling (6 practical articles)? I. Purpose:

? In midsummer, in order to avoid safety accidents caused by high temperature and summer heat, ensure the health of workers, continuously improve working conditions, and prevent production safety accidents such as heatstroke caused by high temperature weather. All workshops and departments should attach great importance to it, take measures, highlight key points, effectively strengthen the supervision and management of production safety, and prevent all kinds of accidents. Safety production measures during high temperature in summer are as follows:

? Second, the establishment of heatstroke prevention and cooling work leading group:

? Team leader: xx

? Deputy leader: xxx

? Member: xxxx

? The office of the leading group is located in the Safety and Environmental Protection Department, and the director is xxx.

? Office phone number 7346

? Third, the specific measures for heatstroke prevention and cooling:

? (a), earnestly implement the responsibility system for heatstroke prevention and cooling. All workshops and departments should conscientiously implement the specific requirements for heatstroke prevention and cooling at the production site, strengthen the organization and leadership of heatstroke prevention and cooling with a highly responsible attitude towards the life and health of front-line employees, improve and implement the responsibility system, formulate emergency plans, and pay close attention to the implementation of preventive measures to prevent workers from heatstroke and various production safety accidents caused by high temperature weather.

? (2) Comprehensively organize and carry out summer safety inspection. It is necessary to effectively strengthen production safety, take the prevention of various accidents caused by natural disasters such as high temperature and strong convective weather in summer as the primary task, comprehensively organize various professional departments and workshops to conduct seasonal investigations and do a good job in implementation.

? Formulate preventive measures to curb accidents during high temperature.

? (3) Strengthen the operation safety during maintenance. It is necessary to highlight the hidden dangers of key projects, especially the supervision of electric and gas welding operations, limited space and aerial work, and strictly implement the safety precautions before maintenance. Personnel involved in maintenance shall strictly abide by the safety measures in the maintenance safety and environmental protection scheme. Hold a pre-inspection meeting, and conduct "five handover" to the personnel participating in the inspection, that is, hand over the construction tasks, safety measures, safety inspection methods, safety precautions and abide by relevant safety regulations. The guardian must be on-site supervision from beginning to end, and must not leave his post without leave, carefully check the construction site and implement safety technical measures.

? (4) Strengthen the safety control of hazardous chemicals. In view of the volatile, leakage and deflagration of hazardous chemicals caused by temperature rise, it is necessary to strengthen the monitoring of major hazard sources of hazardous chemicals, do a good job in explosion prevention, lightning protection and leakage prevention of hazardous chemicals devices and pipelines, conscientiously implement measures such as ventilation, cooling, waterproof, moisture-proof, fire prevention, explosion prevention and lightning protection in hazardous chemicals production and storage places, and ensure that warehouses and pump rooms are ventilated at any time, and storage tanks are in good condition; The production and storage of hazardous chemicals should be "three inspections a day" and "three determinations" (that is, quantitative storage, regular temperature measurement and regular ventilation); The loading and unloading platform should be prepared for lightning protection, anti-static, emergency rescue and accident treatment, and the loading speed should be strictly controlled during loading to prevent electrostatic accumulation. In order to avoid high temperature weather, loading and unloading operations of benzene hydrogenation storage and transportation, tar storage and transportation and tar modified asphalt loading and unloading platforms are prohibited from 1 1: 00 to 15:00.

? (5) Strengthen rotation and rest at work. According to the links of operation activities, the labor organization is adjusted, and the maintenance workers adopt intermittent operation methods at the scene.

? Personnel have shortened the continuous operation time and strengthened the rotation rest during work.

? (6) Ensure an adequate supply of drinking water. The comprehensive office is fully responsible for the contact, collection and distribution of all kinds of heatstroke prevention and cooling supplies and drinking water, and supplies sufficient drinking water, beverages, heatstroke prevention tea and various soups to the workshop to effectively prevent heatstroke and avoid heatstroke.

? (seven), the implementation of heatstroke prevention and cooling items. The Safety & Environment Department is responsible for distributing heatstroke prevention and cooling drugs in the workshop and tracking and checking the drugs used by employees. Strengthen the propaganda of heatstroke prevention and cooling knowledge, and require operators to take or apply heatstroke prevention drugs, such as Ren Dan, cooling oil and essential oil. Before operation, implement the heatstroke prevention and cooling items of each worker.

? (eight), do a good job in health and epidemic prevention. It is necessary to do a good job in sanitation and epidemic prevention in the construction site and dormitory, strengthen the monitoring of drinking water and diseases prone to occur in summer, and report to the dispatching, safety and environmental protection departments in time when legal infectious diseases and food poisoning occur in the construction site. The dormitory should be clean, the room should be properly ventilated, pay attention to personal hygiene, and often wash your hands with hand sanitizer (soap) and clean water, especially after coughing or sneezing. Cover your nose and mouth with a tissue when coughing or sneezing, and then throw the tissue into the trash can. To achieve "early detection, early reporting, early isolation and early treatment", improve the epidemic prevention ability of employees and ensure personal safety.

? (9), do a good job of fire prevention in summer. In view of the hot summer, dry weather and easy fire accidents, fire prevention measures have been further strengthened. The electrical instrument workshop regularly organizes special inspections on flammable places such as power distribution room and oil pump room, and immediately corrects the problems found to avoid accidents.

? (ten), do a good job on duty and information submitted. All departments and workshops should carefully formulate emergency plans for heatstroke prevention, flood control, fire prevention and poisoning prevention, and make good preparations for emergency teams and emergency materials.

? Get ready, arrange the duty work in high temperature and strong convective weather, report the danger and accident immediately when found, and rush to the scene for disposal at the first time to prevent the accident from expanding.

What measures are there for heatstroke prevention and cooling (6 practical articles)? It is very hot in summer, and the temperature rises gradually. In order to further do a good job of heatstroke prevention and cooling in summer, ensure the physical and mental health of employees, improve the enthusiasm of employees, and ensure the safe, efficient and high-quality completion of various tasks in a high-temperature environment, the company decided to carry out a summer cooling activity, and the relevant activity plan is hereby notified as follows:

? I. Activity time

? 20xx August 5 ~ August 10

? Second, the activity requirements

? 1, the department heads uniformly deploy the assigned project delivery activities.

? 2. Each department will deliver heatstroke prevention and cooling articles to each project department in time within one week.

? 3. During the activity, we should pay special attention to the weather forecast, adjust the activity plan in time, and ensure the cool service on key days and time periods.

? 4. Require all departments to communicate with the employees of the project department while sending coolness, understand the needs of employees, and convey the company's concern to every employee.

What measures are there for heatstroke prevention and cooling (6 practical articles)? I. Purpose

? In order to strengthen the work of high-temperature operation and labor protection in high-temperature weather, do a good job of heatstroke prevention and cooling in summer construction site, ensure the health of workers, continuously improve working conditions, and prevent production safety accidents such as heatstroke caused by high-temperature weather. This plan is formulated in accordance with the provisions of the Occupational Disease Prevention Law of People's Republic of China (PRC), the Labor Law of People's Republic of China (PRC) and the Management Measures for Heatstroke Prevention and Cooling Measures.

? Second, the scope of use

? All employees and interns of Shuang Fu production plant.

? Three. Definition of nouns

? 1) The daily maximum temperature is above 35℃ and below 37℃, which is generally high temperature weather;

? 2) The daily maximum temperature is above 37℃, and the weather below 40℃ is moderately hot;

? 3) The maximum daily temperature above 40℃ is strong and hot weather;

? 4) Continuous high temperature refers to "high temperature days" lasting for more than 5 days.

? 5) Hot weather operation refers to the operation arranged by the employer for workers in a hot natural meteorological environment in hot weather.

? Fourth, the implementation time.

? 20xx July ~ June 20xx 10 (if the outdoor temperature continues above 36℃, the implementation date shall be postponed appropriately).

? V. Relevant requirements

? 1) Regulatory requirements: Y.F.B.F. [20xx]No. 166.

? During hot weather, the employer shall, according to the following provisions, production characteristics and specific conditions, take measures such as reasonable arrangement of working hours, rotation of work, appropriate increase of rest time for workers in high-temperature working environment, reduction of labor intensity and reduction of outdoor work during high temperature:

? The employing unit shall adjust the operation time according to the forecast temperature released by the meteorological station affiliated to the municipal competent meteorological department on the same day, except for emergency treatment due to emergency rescue and disaster relief, personal and property safety and public interests.

? (1) In general high-temperature weather, the employing unit shall rest in shifts, shorten the continuous working hours of workers, and shall not arrange outdoor exposure.

? Workers who work overtime every day; The employer shall earnestly do a good job in heatstroke prevention and cooling in high temperature weather, formulate and implement heatstroke prevention and cooling measures, and ensure the normal operation of heatstroke prevention and cooling equipment.

? (2) In medium and high temperature weather, the employing unit shall arrange all-day outdoor work time for workers according to the documentNo. [20xx]89 of the General Administration of Safety Supervision.

? Regulations, and suspend the outdoor open-air operation during the high temperature period from 12 to 16. If it is necessary to work in the open air at high temperature due to the requirements of production technology, the employer shall reasonably adjust the work and rest time and take heatstroke prevention and cooling measures.

? (three) when the high temperature weather is severe, the outdoor work on that day should be stopped. If it is really necessary to work in the open air because of the production process requirements, the employer shall make reasonable adjustments.

? The whole work and rest time, and take heatstroke prevention and cooling measures.

? 2) Site status:

? (1) Because the assembly workshop is hot; During working hours, it is always sunny and not ventilated. The ceiling is a board house that absorbs heat, and the temperature can reach 50 degrees in summer. (2) The actual temperature at the assembly plant site is more than 2 degrees higher than that reported in Chongqing weather forecast. On July 9, four employees of the assembly plant suffered from heatstroke;

? Cost budget of intransitive verbs:

? 5898 1 yuan

? (1) budget for heatstroke prevention products: ¥ 1.54 million yuan.

? (2) Cold drink budget: 65,438 yuan +0. 83 million yuan.

? (3) Budget of cooling equipment: ¥2528 1 yuan.

? 1) Adjustment of high temperature operation time in summer

? Remarks:

? From mid-July to June at 5438+ 10, the temperature is expected to reach 35+for 65 days, and the following cooling foods are prepared for Workshop 4:

? 1, mung bean soup: mung bean 30 kg/day.

? 2, sugar 10 kg/day

? 3. Summer tea: 1 kg/day

What measures are there for heatstroke prevention and cooling (6 practical articles)? In order to do a good job of personal safety in summer and ensure the safety and health of employees in hot, humid and hot weather in summer, Handan Works Section has formulated a 20xx summer heatstroke prevention and cooling labor protection implementation plan according to the relevant documents of higher authorities.

? Specific measures for heatstroke prevention and cooling. In summer, there are many high temperature, humidity and thunderstorms, which have a great impact on workers' work safety and are the focus of labor safety risk control. All departments and workshops should raise awareness, implement responsibilities, implement personal safety control measures in summer, and regularly carry out safety early warning tips, safety inspections and heatstroke prevention knowledge education in accordance with the principles of "taking responsibility step by step, strengthening leadership, giving priority to education, ensuring system" and "early planning, early preparation and early management".

? Strengthen the publicity, education and training of workers' safety knowledge about heatstroke prevention and cooling. Led by the vocational education department, with the propaganda and cooperation of the safety supervision department, the labor department and the Party committee, and in combination with the safety production month activities, before June 15, a systematic special publicity, education and training examination on heatstroke prevention knowledge, safety measures such as collision prevention and electric shock prevention, on-site emergency plan and self-help knowledge will be organized for workers.

? Do a good job in the investigation and rectification of hidden dangers of power lines and electrical equipment. Led by the security department, organize full-time (part-time) electricians in Handan comprehensive mechanical repair workshop and other workshops to conduct a comprehensive registration inspection of various electrical circuits, electric tools, power switch boxes, household appliances, leakage protectors and other facilities, register hidden problems found in the inspection in time, formulate rectification measures, implement the responsible person and time requirements, and immediately rectify the cancellation number.

? Strengthen the organization of high temperature labor production in summer. The labor department (labor department) is responsible and other departments cooperate. During the extremely hot, humid and hot weather in summer, the labor department (Ministry of Labor) will issue a notice. According to the characteristics and specific conditions of production operations, while ensuring the quality of work, timely adjust the labor and rest system for high-temperature operations in summer, reduce the operation time in high-temperature period, shorten the continuous operation time, increase the rest, reduce the labor intensity, strictly control and avoid overtime, ensure full rest and ensure the energy of employees.

? The key to personal safety in the electrochemical section of card control. Each workshop should strictly implement the requirements of online operation in summer and operate according to the regulations. First, it is forbidden to walk in the heart and sleepers in rainy days, and it is strictly forbidden to shelter from the rain under the pillars and trees of catenary; Second, when rainy weather approaches the line, it is forbidden to use metal umbrella; 3. In thunderstorm weather, it is forbidden for operators to stay near the pillars, stay wires and grounding wires of catenary, and stay under trees and metal components near catenary (within 5 meters); Fourth, pay attention to the trees on both sides of the line when patrolling the equipment in rainy days. When it is found that trees are tilted or dumped on the line, it is forbidden to get close to dangerous trees to prevent personal injury accidents such as electric shock and smashing, and immediately report to the station and depot safety production dispatching command center to take corresponding safety measures; Five, the rail car is used for loading and unloading road materials, and the tools used shall not exceed the top of the head, and keep a safe distance of more than 2 meters from the live part of the catenary.

? At the same time, the monthly safety analysis meeting in summer (end-of-season safety committee) is required to analyze the implementation of personal safety measures in summer and solve existing problems in time, and the monthly safety analysis meeting of each workshop and team should analyze the personal safety situation.