High temperature and heatstroke prevention emergency plan (6 general articles)
?Emergency plans refer to preparing response measures in advance for upcoming disasters and accidents. In order to face possible safety accidents in a timely manner, we will make plans to deal with accidents in advance. The emergency plan must be analyzed based on the actual situation. Will you learn from excellent emergency plans? Below is the "Emergency Plan for High Temperature Heatstroke Prevention (6 General Parts)" that I compiled for you. It is for reference only. I hope it can be used as a reference for you! High temperature and heatstroke prevention emergency plan (general 6 articles) Part 1
?2
?1. Purpose:
? Entering the midsummer season, the sunshine intensity is high and the temperature is high Continuing, this measure is specially formulated to effectively prevent heatstroke and cool down the construction site in summer, protect the health of construction workers, continuously improve working conditions, and prevent workers from heatstroke and other types of production safety accidents caused by hot weather.
?2. Scope of application:
?This system applies to the xx project department of xx Electric Power Construction xx Company.
?3. Specific provisions:
? (1) Conscientiously implement the responsibility system for heatstroke prevention and cooling.
?Relevant units must conscientiously implement a series of requirements on heatstroke prevention and cooling work at construction sites, and must effectively strengthen the organization and leadership of heatstroke prevention and cooling work with a high degree of responsibility for the lives and health of front-line construction workers. , improve and implement the responsibility system, formulate emergency plans, and pay close attention to the implementation of preventive measures to prevent worker heat stroke and various production safety accidents caused by high temperature weather.
? (2) Arrange work and rest time reasonably.
? Pay close attention to meteorological forecasts related to high temperature weather. Meteorology defines a daily maximum temperature greater than or equal to 35 degrees Celsius as a "high temperature day", and a "high temperature day" for more than 5 consecutive days is called a "continuous high temperature" . Strictly implement the "grasp the two ends and rest in the middle" measures to avoid high temperatures, appropriately adjust the labor and rest system for high-temperature operations in summer, reduce labor intensity, strictly control outdoor operating time, avoid operating during high-temperature periods, and ensure the health and life safety of workers. In principle, if the temperature exceeds 37°C, outdoor work is strictly prohibited from 11:00 to 15:00.
? (3) Strengthen rotation breaks at work.
?In the summer, according to the construction process, labor organization should be adjusted as much as possible, and frequent shifts should be adopted to shorten one continuous operation time and strengthen rotation and rest during work. Strengthen on-site inspections, increase the publicity of heatstroke prevention and cooling knowledge and heat stroke first aid knowledge, and improve the safety awareness of all employees.
? (4) Ensure adequate supply of drinking water on site.
? Sufficient drinking water, beverages, tea and various soups that meet hygienic requirements should be provided on site to effectively prevent and cool down the heatstroke and avoid heat stroke events.
? (5) Implement heatstroke prevention and cooling items.
? We must pay close attention to the vast number of front-line construction workers who insist on construction in hot weather, strengthen the publicity of heatstroke prevention and cooling knowledge, and require construction workers to carry heatstroke prevention medicines with them, such as: Rendan, cooling oil, Fengyoujing, etc. , Implement heatstroke prevention and cooling items for every worker.
? (6) Do a good job of fire prevention in summer.
?In view of the actual situation that fire accidents are prone to occur due to hot and dry weather in summer, further strengthen fire prevention measures, conduct regular inspections of flammable places such as power distribution rooms, warehouses, and paint rooms, and deal with problems immediately if they are found , and at the same time be equipped with fire extinguishing equipment as required. High Temperature and Heatstroke Prevention Emergency Plan (6 General Parts) Part 2
?3
?As we enter the midsummer season, the temperature rises. In order to effectively prevent heatstroke and cool down the construction site in summer and ensure the safety of employees These measures are specially formulated to ensure good health and prevent workers from heatstroke and other types of production safety accidents caused by hot weather.
?1. The safety department should go deep into the workshop to publicize knowledge on heatstroke prevention and cooling and heat stroke first aid, and improve the safety awareness of all employees.
? 2. Security departments and offices should pay close attention to weather forecasts related to high temperature weather.
?1. If the daily maximum temperature is greater than or equal to 33 degrees Celsius, initiate heatstroke prevention measures: sufficient drinking water supply in the workshop must be ensured. Arrange a dedicated person to be responsible for refrigeration of drinking water to ensure the supply of ice water at least three times a day (but the ice water cannot be over-frozen).
?2. When the daily maximum temperature is greater than or equal to 35 degrees Celsius, high-temperature heatstroke prevention measures should be initiated: workshop operations adopt a shift-based work mode to shorten employees’ continuous working time; in addition to ensuring an adequate supply of drinking water, the administrative department needs to make additional arrangements Cook heat-relieving drinks, such as mung bean water, sour plum soup, ginger salt tea, watermelon, etc., and add salt water drinks in a timely manner.
?3. When the daily maximum temperature is greater than or equal to 37 degrees Celsius, continuous high-temperature heatstroke prevention measures are initiated: workshop operations adopt the method of shift work and rest, employees’ continuous working time shall not exceed the time specified by the state, and outdoor open-air work shall not be arranged; administrative In addition to ensuring an adequate supply of drinking water and preparing summer-heat-relieving drinks, the department also replenishes salt water drinks in a timely manner.
? 3. The purchasing department cooperates with the office to implement heatstroke prevention and cooling items, such as: Rendan, Huoxiang Zhengqi water, Shidishui, etc. The production equipment department formulates a plan for heatstroke prevention and cooling drugs based on the actual production situation, purchases them in a timely manner and distributes them to each team in the workshop.
? 4. Check the heatstroke prevention and cooling equipment in each workshop. The production equipment department makes statistics on damaged fans, air conditioners and cooling equipment that need to be added, and reports them to the company for approval before organizing procurement or repairs. Ensure the normal operation of heatstroke prevention and cooling equipment in the workshop.
?5. Do a good job in fire prevention in summer. In view of the actual situation where fire accidents are prone to occur when burning mosquito coils and using electrical appliances due to the hot summer, fire prevention measures must be strengthened. The safety department should conduct regular inspections of flammable sites throughout the factory, deal with problems immediately if they are found, and equip fire-extinguishing equipment in accordance with regulations. High Temperature Heatstroke Prevention Emergency Plan (6 General Parts) Part 3
?High Temperature Heat Stroke Accident Emergency Plan Drill Plan High temperature heat stroke is a common accident during construction in hot weather. Judging from the final degree of injury suffered by a person suffering from heat stroke, it is very likely that the person suffering from heat stroke will be rescued if the rescue method is timely and correct. The purpose of formulating an emergency plan for high temperature and heat stroke accidents is to do our best to rescue those suffering from heat stroke from death and to minimize the casualties in the accident.
? 1. Scope of application of the plan This emergency plan applies to all employees engaged in production in this project. When someone suffers from heat stroke in the workplace, they shall bear the responsibility of providing emergency rescue to others suffering from heat stroke. When someone is found suffering from heat stroke in other places, he shall bear the obligation to provide emergency rescue to outsiders suffering from heat stroke.
? 2. Simulation drill situation When the project department was pouring concrete for columns, due to the constant high temperature, a construction worker in the concrete team suffered a heat stroke and fell to the ground.
? 3. Time for the exercise The time for the exercise is scheduled for XX, month XX, XXXX.
?4. Plan organization and responsibilities:
?1. High temperature and heatstroke accident organization (general commander)
?Chief commander: Xu Jian Main responsibility :
?a. Be fully responsible for on-site emergency first aid work;
?b. Decide to activate the emergency plan;
?c. Direct emergency first aid work.
?Deputy Commander-in-Chief: Ding Jinqing He Gan’s main responsibilities:
?a. Organizing emergency first aid work;
?b. Coordinating the unified dispatching of various departments;
?c. Responsible for investigation, monitoring and determination of first aid plans.
? On-site command: He Xuefeng, Song Yu, Wu Yunfeng. Main responsibilities:
?a. Communicate and contact drill personnel from various departments, responsible for the smooth flow of traffic rescue lines and on-site warning;
?b. Assist the commander-in-chief with various logistics matters and preparation of drill materials and other related matters;
?c. Coordinate communication with local hospitals and public security, and be responsible for collecting and organizing drill data, etc. Work.
?2. Responsibilities of each group:
?(1) Accident handling group: The main task is to determine the rescue plan and organize personnel and vehicles to rescue people and rescue people suffering from heat stroke;
?(2) Medical rescue team: The main task is to rush to the accident scene in time to rescue people with heatstroke, and decide to provide first aid at the scene or the nearest hospital depending on the severity of the injury to ensure the safety of the personnel.
?(3) Alert Liaison Group: The main task is to upload and issue leadership instructions and divert traffic routes, communicate with external parties to inform the accident situation of the scene, and send people to the intersection to respond and record the entire drill process.
?(4) Logistics support group: The main task is to follow the instructions of the leadership of the headquarters, arrange the dispatch of rescue drill vehicles and the timely supply of emergency funds.
?The personnel of each group are composed of accident handling team: Xu Jian, Qian Song, the rest, He Xuefeng, medical rescue team: Zhou Xiujuan, Wang Xiaoqing, Jin Lingjuan, alert liaison team: Chen Mingxing, Wu Yunfeng, Zhao Yisheng, Zhu Sujun, logistics support team: Jin Jiyong, Wang Wei 5. Drill procedures :
?Simulated accident: Zhao Shengyi simulated heatstroke among construction workers.
?1. The accident occurred at XX o'clock. The construction worker suffered from heat stroke and fell to the ground.
?3. Disposal process 1. After the concrete team leader discovered the danger at XX hour and XX minute, he immediately notified the project manager Xu Jian.
?2. After receiving the accident report at XX time, the project manager immediately started the emergency plan and reported the situation to the relevant departments. The safety manager He Gan dialed the "120" emergency number and arranged for the nearest hospital. Prepare for rescue.
?3. At XX time, on-site personnel carried the heatstroke employee to a cool and ventilated place to prevent secondary injuries, and waited for the medical rescue team to come to rescue.
?4. At XX hours and XX minutes, the on-site security team immediately isolated the accident site to protect the accident site.
?5. At XX: XX, the on-site rescue team immediately carried the first-aid kit to the scene to quickly judge the condition. Manual first aid is used at the scene, and a cold towel is used to gently wipe the forehead and sweat droplets of the person suffering from heat stroke. And unbutton the tops of people suffering from heatstroke to achieve good ventilation.
?6. At XX hours and XX minutes, use cooling and ventilating medicines to pass into the nostrils of the person suffering from heat stroke to make them ventilated and smooth. For those with mild heatstroke, give them an appropriate amount of refreshing salty drinks and take corresponding medicines. People with moderate heatstroke should be sent to the hospital immediately.
?7. The person suffering from heatstroke slowly woke up at XX hour and XX minute.
8. The drill ended at XX hour and XX minute.
No one was injured this time, the focus was on the rescue process.
?9. At XX time, XX Deputy Commander-in-Chief He Gan reported the completion of the drill to Commander-in-Chief Xu Jian, who gave a brief summary of the drill.
? 6. Rescue equipment and material items: one ambulance, one stretcher, and one medical kit 7. Notes 1. The alert liaison team must carefully record the time of the exercise, reporting time, and personnel Injuries, personnel conditions at the scene, etc.
?2. On the day of the exercise, the logistics support team must ensure that all exercise personnel and materials are transported to the exercise site before 10 o'clock, and emergency funds and logistics-related materials are arranged in place.
?3. Rescuers must arrive at the scene as soon as possible. After arriving at the accident scene, rescuers must follow the orders of the command center and carry out first aid work. After the rescue, take all personnel out of the accident scene and evacuate to a safe area.
?4. After Commander-in-Chief Xu Jian concluded the exercise and announced the end of the exercise, all drill personnel evacuated the exercise site and restored construction order.
?Through this drill, all our construction workers will be more aware and clear about the rescue procedures of the emergency rescue plan. Ensure the orderly implementation of emergency plans when responding to emergencies, gain time for rescue, and achieve the purpose of the drill. High Temperature Heatstroke Prevention Emergency Plan (6 General Parts) Part 4
?1. Purpose
?In order to follow the principle of "protecting personnel safety first, preventing and controlling accidents" when heatstroke accidents occur during construction The principles of "spread first; unified command, hierarchical responsibility, regional focus, unit self-rescue and social rescue". In order to achieve the purpose of controlling the accident, effectively rescuing the injured, reducing accident losses, and preventing the expansion of the accident, this rescue plan is specially formulated.
?II. Project Overview
?Renhuai City Guojiu New Town Resettlement Housing Group 1# Residential Building, Section 1, 2 floors underground, 31+ lofts above ground, total height 99.75m, construction area 40012㎡, first-class building, first-class fire resistance rating. The above-ground buildings are used for residential purposes, and the relative elevation of ±0.000 is 899.700m. The structural transfer layer is on the first floor, the upper structure is a complex high-rise structure, and there is a two-story garage underground. The structural form is a frame shear wall structure. The site is basically flat, the roads are smooth, and large vehicles can pass. Water and electricity are connected to the site by the construction unit. The participating units of all parties are as follows:
?Construction unit: Renhuai Urban Development Investment and Management Co., Ltd.
?Surveying unit: Guizhou Dingsheng Geotechnical Survey Co., Ltd.
p>?Design unit: Guizhou Architectural Design and Research Institute Co., Ltd.
?Supervision unit: Guizhou Architectural Design and Research Institute Co., Ltd.
?Construction unit: Guizhou Construction Engineering Group Co., Ltd. Company
?3. Basis for preparation
?1. "Work Safety Law of the People's Republic of China".
?2. "Construction Project Safety Production Licensing Regulations".
?3. "Measures for the Supervision and Administration of Production Safety in Housing Projects".
?4. "Regulations on Reporting, Investigation and Handling of Production Safety Accidents".
?4. Emergency rescue accident scope and accident characteristics
?Accident practice scope: preventing heat stroke safety accidents.
?Accident characteristics: Heat stroke is a sudden safety incident. Generally, summer is the period of high incidence, or in high-temperature places with poor ventilation conditions. Before heat stroke, symptoms such as chest tightness, dizziness, thirst, difficulty breathing, and weakness usually appear.
?5. Emergency plan organization
?Establish a major accident emergency rescue leading group to be responsible for the implementation of the emergency plan.
?1. Emergency rescue command group:
?1) An emergency team is established by the project leader, safety officer, etc. Comrade Huang Xianchao, the project leader, serves as the leader of the emergency response team.
?Team members: Li Xiaohong, Xie Jianbo, Chen Xiang, Cao Qing, Wang Qian, Feng Yu
?The specific division of labor is as follows:
?(2) Li Xiaohong : Responsible for understanding the accident situation on site and organizing on-site rescue.
? (3) Xie Jianbo: Responsible for promptly strengthening ventilation and heat dissipation at the rescue site.
? (4) Chen Xiang: Responsible for contacting the hospital immediately, explaining the detailed accident location and accident situation, and sending someone to the intersection to respond.
? (5) Cao Qing: Responsible for the dispatch of on-site materials and vehicles.
? (6) Wang Qian, Feng Yu: Logistics services.
?Our company reserves sufficient quantities of various emergency equipment and medicines in all projects and locations.
?If a heat stroke accident occurs in your own unit or a nearby unit, you must unconditionally obey the arrangements of the emergency rescue command group and immediately join the emergency rescue team after the leader of the emergency rescue command group announces the start.
?2. Responsibilities of the emergency rescue command group
?The project department of our company in Guojiu New City is responsible for the command, arrangement, implementation and emergency rescue of heat stroke accidents within the construction scope of the project. supervision.
Implement the spirit of instructions from the state, industry and superiors, report accidents to superiors in a timely manner, direct and coordinate emergency rescue work and aftermath. Participate in the investigation and handling of accidents in accordance with relevant national, industry and superior regulations.
?3. Departments under the emergency rescue command group
?Emergency rescue office, safety and security team, accident rescue team, medical rescue team, logistics support team, aftermath treatment team, accident Eight professional handling groups including the investigation and handling group.
?6. Responsibilities of each professional group
?1. Emergency Rescue Office (person in charge: Li Xiaohong)
?Contact number: XXXXXXXXXX
< p> ?Main Responsibilities: Responsible for the daily management of the "contingency plan" and collective responsibility for major accidents. Report and notify all members of the command team to rush to the accident scene immediately. When implementing emergency rescue tasks, coordinate work with other disposal teams, mobilize rescue teams according to the team leader's orders, and have mechanical supplies in place in a timely manner to implement emergency rescue work. High Temperature and Heatstroke Prevention Emergency Plan (6 General Parts) Chapter 5?9
?District Construction Management Committee (Construction and Transportation Committee), Housing Security and Housing Administration Bureau, and all relevant units:
p>
?In order to effectively do a good job in heatstroke prevention and cooling in the housing and urban-rural construction management industry of this city, and to ensure the health of the workers, the normal life of citizens and the safe operation of the city, according to the "General Office of the Shanghai Municipal People's Government" on doing a good job in heatstroke prevention and cooling "Emergency Notice" (Shanghai Fuban Mingdian [20xx] No. 2, hereinafter referred to as the "Emergency Notice"), the relevant matters are hereby notified as follows:
?1. Strengthen leadership and carefully arrange deployment
?Leading cadres at all levels should attach great importance to it, strengthen organizational leadership, and take the lead in caring for the production and life of employees who stick to their posts. They should especially strengthen their care for law enforcement officers and operators working on the grassroots front lines and outdoors. All units must adhere to the people-oriented approach and take into account actual conditions to formulate various measures to effectively prevent and control high-temperature heatstroke, and effectively protect the health rights and interests of workers: strengthen publicity and education on safe production during high temperatures, enhance employees' awareness of safety precautions when working in hot weather, and abide by operating procedures. , use high-temperature protective equipment and personal protective equipment correctly, and strive to ensure production safety during high temperatures in the city's housing and construction industry.
?2. Clarify responsibilities and implement protective measures
?Each construction enterprise should make reasonable arrangements and adjust work and rest times for high temperature weather. Except for emergency rescue and repair construction operations, they must strictly abide by the national The relevant provisions of the "Notice on Effective Summer Heatstroke Prevention and Cooling Work" (General Office of Work Safety [20xx] No. 117) of the General Office of the State Administration of Work Safety: It is necessary to strictly control and try to avoid arranging night construction. If it is really necessary to carry out night construction, relevant regulations should be implemented. It is stipulated that construction is strictly prohibited from disturbing the residents: food hygiene and epidemic prevention work at the construction site must be done effectively, the food hygiene system must be strictly implemented, the hygiene management of food and drinking water should be strengthened, and poisoning incidents caused by food deterioration should be avoided: necessary salty cooling should be provided during high temperature seasons Beverages and heatstroke prevention and cooling drugs: When on-site workers suffer from notifiable infectious diseases or food poisoning, they should promptly report to the relevant competent authorities and take measures: Summer is a period of high incidence of electric shock accidents and fire accidents, and it is necessary to strengthen fire prevention and electrical safety protection facilities at the construction site Conduct inspections to promptly discover and rectify protection deficiencies.
? All property service companies should strengthen inspections of public areas in the property service area, pay attention to electricity safety, and try their best to eliminate fire safety hazards: implement heatstroke prevention and cooling measures at the property’s outdoor work sites, and reasonably arrange outdoor During the working hours of workers, rotation work should be implemented to appropriately reduce labor intensity: owners and property users should be reminded to pay attention to electricity safety, prevent heatstroke and cool down, and avoid accidents.
?3. Strengthen supervision and provide emergency support
?Management departments at all levels should regard heatstroke prevention and cooling as an important part of summer supervision work, and strengthen supervision of construction sites, gas facilities and equipment Inspection of the implementation of heatstroke prevention and cooling measures in , property and residential areas. District construction management, housing management and other departments and units must strengthen their on-duty capabilities, implement on-duty and information reporting systems, make emergency rescue preparations, and ensure that personnel, measures, and responsibilities are in place. When encountering abnormal or unexpected situations, we must promptly organize forces to handle them properly and report them promptly in accordance with regulations. High Temperature Heatstroke Prevention Emergency Plan (6 General Parts) Part 6
?3
?In order to further strengthen the implementation of the emergency plan safeguard measures and improve the project department's response to production safety accidents and emergencies Ability to educate employees on how to handle emergencies correctly, accurately and quickly, we have specially organized various departments to carry out continuous beam hanging basket emergency drills. The drill plan is as follows:
? 1. Drill time:
?At x o’clock in the afternoon on xx, xx, 20xx.
? 2. Purpose of the drill:
? 1. To prevent personnel from suffering from heatstroke during high-temperature construction operations in the field.
?2. Be able to respond quickly after a heat stroke accident, activate emergency plan procedures, and minimize the worsening of heat stroke and casualties.
?3. Drill plan:
?(1) Emergency plan drill background
?During the construction of the side ditch of No. 8 roadbed, a worker was working on the ditch Heat stroke symptoms occurred when cleaning garbage in the cable trough.
?(2) Exercise leadership group:
?Emergency rescue team leader: xxx.
?Team members: emergency team members, xx team leader and team leader
?(3) Drill rescue division of labor:
?1 Emergency rescue team: The team leader xx is responsible, xx assists, and consists of members of relevant departments and collaborative teams. Organize emergency first aid.
?2 Logistics Support Group: Office Director Sun Dongxiao is responsible for basic first aid work for personnel involved in emergency rescue.
?3 External Liaison Group: Secretaries xx and xx are responsible for external liaison, contact the green channel of xx People's Hospital, and provide timely rescue for heat stroke personnel.
? (4) Drill procedures and personnel responsibilities:
?1. Drill procedures: The emergency team is notified and rushes to the scene - primary rescue at the scene, and carries the injured to a flat and cool place , carry out preliminary cooling treatment; at the same time, xx dials the green channel ambulance number and opens the green rescue channel - xx immediately organizes a team of personnel to maintain the order of the scene - after the ambulance personnel arrive, xx is responsible for cooperating with the ambulance personnel to rescue the heatstroke victims and assisting in lifting them The rescue vehicle accompanied the team and rushed to the hospital - Finally, the manager xx made a summary, and the safety director xx explained the prevention of high temperature heatstroke, common sense of self-rescue and mutual rescue, and precautions - the drill ended.
?2. Peng Pengguang, leader of the emergency leadership team, is the top person in charge of emergency rescue work. During the rescue process, he urges the office, finance department, and physical and mechanical department to equip the corresponding emergency supplies and equipment. In case of heatstroke, When an incident occurs, the emergency plan will be activated quickly and the rescue will be fully commanded.