What are the requirements for Feng Shui decoration during New Year’s Eve?

There is nothing particular about Feng Shui during New Year's Eve decoration. A person in charge of a home decoration company told reporters that before work is suspended, it is best for the owner to inspect the construction site together with the construction party, register the quantity of items and materials on site, and record the indoor items. Water, electricity, gas and other data must be signed and kept. When construction restarts after the Spring Festival, construction workers should enter the site together with the owner to conduct an inventory. Only after confirmation is correct can construction be officially started. This can avoid some disputes.

Protect the construction site well

Before work is stopped and workers leave the construction site, completed finished products and semi-finished products should be protected. The owner should confirm with the home decoration company the storage method and storage temperature of various materials, such as how to store various boards, stone mats and other auxiliary materials, whether wood products require special protection, etc. If conditions permit, during the shutdown period, it is best for the owner to go to the construction site several times to ventilate the site, which will be beneficial to the indoor air quality after completion.

Owners should find problems on their own

During the shutdown period, it is best for owners not to be idle. They can use this time to carefully check whether there are any problems in the completed construction links. If the wall painting process has been completed before the work is stopped, the owner can first observe whether there are cracks in the wall paint, obvious brush lines and other problems. If the wall tiles have been laid, the owner can use a small hammer to tap each part of the wall tiles one by one to see if there is any hollowing. After discovering a problem, you can mark it first and ask workers to solve it first after work resumes.

Do a good job of safety

During the renovation period, there will be a large amount of combustible materials in the room, such as wood, packaging boxes, etc., so fire prevention work must always be paid close attention to, especially in the past month. There is no construction period.

On the day when the project is suspended, the owner must ensure that all power supplies are cut off and clean up and transport unused packaging boxes, wood chips, etc. out of the room. At the same time, keep combustible materials such as wood as far away from power sources as possible, and maintain a certain indoor humidity. Even so, every time you open a window for ventilation, you should still take the trouble to check every corner to eliminate any unsafe factors.