China Naming Network - Weather knowledge - Changfeng town infrastructure

Changfeng town infrastructure

The rural power grid reconstruction project in this township has been completely completed, and Luotang Electric Power Management Institute in the north has been brought into the unified management of Changfeng Electric Power Management Institute. Power resources outside the countryside 2. The incoming line of Changfeng is Shanhu Substation 18 10KV, and the incoming line of Luotang Substation is Zongyang Shilin Substation 10kv branch line with 82 * * distribution transformers, with a total capacity of 980Kva and an annual power consumption of 400Kwh. 10KV line length is 65Km, and 380KV line length is 65 km.

Water supply: There are Changfeng Waterworks and Hexing Waterworks in China, with a total daily output of 65,438+0,000 tons. The water source is Yangtze River water. The water intake of Changfeng Waterworks is located near Yaogou Station, and a water tower with storage capacity of 1.300 tons is built in the center of the market town, which flows to Changfeng, Xinjian, Qiao Yuan, Yingpan, Qianjiang, Xinyi, Zheshan and Zhelin in the area. Hexing Waterworks is located in Hexing Village in the north, and its water supply covers four villages: Jiangjun, Lianxing, Hexing and Zongnan.

Posts and Telecommunications: There are two posts and telecommunications offices in the area, located in Lianxing Village and Changfeng Village respectively. The two communication rooms are located in Changfeng Village and Lianxing Village respectively, with 4 regional fixed telephones 1 00, telephone penetration rate 1 door /5 people and mobile phone penetration rate1department /4 people.

Water conservancy facilities and dike drainage: The dike in the southeast of this area is 27 kilometers long, which directly guarantees the safety of Anqing people's lives and property. After the reinforcement project, the warning water level will be16.70m, and the water level will be19.34m. The total length of Qianjiang, Xinyi and Jiangjun dikes will be12.4km, and the flood control task will be 4.2km2.. The total length of the barrage is 4.5 kilometers, which mainly ensures the safety of Changfeng, Yingpan and Xinyi Village. The total length of Luotang William Dam 1. 152km is directly related to the safety of Jiangjun, Lianxing, Hexing and Zongnan villages. Fortification water level 12.5m, warning water level 13m. There are two drainage channels in the township, Yaergou high drainage channel and Yaogou low drainage channel. Yaergou High Drainage Station has a total installed capacity of 225 kW ×5 sets and a flow rate of 3 m3/s, and is responsible for drought resistance, drainage and sewage discharge in some areas of Changfeng, Xinjian, Qiao Yuan, Laofeng and Longshi. The total installed capacity of Low Paiyaogou Station is 1.55 kw×6 units, and the flow rate is 1.5m 3/ s, which is mainly responsible for drought resistance, drainage and sewage discharge in Zhelin, Changfeng, Yingpan, Xinyi and Zheshan villages. Four villages in Luotang (Jiangjun, Lianxing, Hexing and Zongnan) have their own drainage stations, and there are eight * * * with a total installed capacity of 490 kilowatts, which undertake the tasks of drought relief and drainage in their respective regions. It is adjacent to the Yangtze River levee in the southeast, with a total length of 27 kilometers, and the top of the levee is black oil level. Anzong East Road runs through the town for 3.7 kilometers and is connected with the levee in the east. The newly-built Central Road, Garden Road and Yue Quan Road in the area are all asphalt roads with a width of 5m and a total length of11.6km.. Chang Ying Road is a cement pavement with village road167km. Anzong East Road is connected with Zongyang via Changfeng and Guangjiwei River embankment, with a total transit length of 16.7 km.