Hospital emergency plan for typhoon and rainstorm

Sample essay on emergency response plan for typhoon storms in hospitals (generally 5 articles)

In real life, study, work, and life, if you are not prepared, you will encounter some unexpected events or accidents. In order to minimize the harm, it is necessary to prepare a specific, detailed and targeted emergency plan in advance. So what kind of emergency plan is a good one? Below is a sample of the hospital’s emergency response plan for typhoon storm prevention (5 general articles) that I have carefully compiled. You are welcome to share it.

Hospital emergency plan to prevent typhoon and rainstorm 1

In order to effectively prevent and control geological disaster points on the unstable slopes of xx dangerous rock mass in xx town and the unstable slopes of dangerous rock mass in Banbianshan, In order to minimize accident disasters and avoid losses to people's personal safety and property, the following emergency rescue plan has been formulated based on the actual situation of our town.

1. Situation of disaster points

(1) xx dangerous rock mass unstable slope

xx dangerous rock mass unstable slope is located in the back hill of Longshan Temple, Liyang Town , there are several dangerous rocks protruding from the top of the mountain, affecting the safety of personnel and property in Longshan Temple. Landslides may occur in the event of long-term heavy rainfall. In the event of long-term heavy rainfall, people in Longshan Temple should be notified to evacuate immediately.

(2) The unstable slope of Banbianshan dangerous rock mass

The unstable slope of Banbianshan dangerous rock mass is located on the south side of Xiaolong Mountain in Liyang Town. Banbianshan is almost vertical, with surface There are many protruding rocks that are easy to fall. There are Huangshan City Special Police School and private houses near the dangerous rocks. Landslides may occur in the event of prolonged heavy rainfall. In case of prolonged heavy rainfall, promptly notify nearby people to evacuate.

2. Emergency Response Leading Group

Team Leader:

Deputy Team Leader:

Members:

3. Emergency response and actions

(1) Emergency personnel

Detector: xx

Resettlement site: xx

Contact person : xxx

Transfer personnel: Shi Chengzhong

(2) Emergency team: xxx

(3) Emergency material reserves

Town The flood prevention and disaster relief materials mainly include: 12 sets of raincoats, 12 steel helmets, 4 folding rechargeable recording microphones, 10 shovels, 100 sacks, and some sand. The above flood prevention materials are stored in the town equipment room and are uniformly deployed by Comrade Lin Tianyou.

(4) Emergency response:

1. The town flood prevention and disaster relief leading group held a meeting to urgently report the disaster situation and disaster relief work in the jurisdiction, analyze and predict possible greater disasters, and deploy the jurisdiction Disaster relief efforts. Immediately report the disaster situation and disaster relief work in the jurisdiction to the district people's government and the district flood control and drought relief headquarters, and request the district government for support.

2. Organize the town’s staff to promptly notify residents of flood information through phone calls, mobile phone text messages, shouting, etc. according to the emergency level during the flood season; in case of emergency or when power supply or communication is interrupted, separate households will be notified easily. Residents at disaster sites, especially when related disasters may occur at night, must ensure the reliability of information transmission so that no household or person is missed.

3. Emergency personnel should be on standby at any time after receiving a disaster weather forecast according to their respective work responsibilities and tasks. They are not allowed to go out. When receiving a gathering order, they should rush to the designated location within 15 minutes and organize according to the command rescue.

4. Publish the disaster situation. The town headquarters office summarizes the disaster situation and reports it to the district flood control and drought relief headquarters.

4. Post-disaster relief work

1. Timely convene a production and life self-rescue work meeting and quickly organize the restoration of production and life.

2. Carefully organize disaster investigation and verification work, focusing on verifying the losses caused by house collapse due to disasters, especially the losses of victims of extremely severe disasters such as complete house demolition.

3. Based on the disaster situation after the nuclear disaster, formulate a relief plan for the victims and implement it step by step.

5. Basic requirements and work disciplines for flood prevention and rescue work

1. The Flood Prevention and Disaster Relief Leading Group Office implements a 24-hour duty system during the flood prevention period. Strict work discipline, carefully keep duty records, and report and issue reports in a timely manner. During the flood prevention period, if members of the headquarters need to leave the local area for business, they must obtain approval from the main person in charge of the unit and arrange flood prevention work within their own scope of responsibility.

2. Each person in charge is responsible for the flood prevention and disaster relief work. He must ensure that the phone is open 24 hours a day, arrange the duty duties in his jurisdiction, supervise and supervise the completion of duty records, duty handover, etc., and when any danger is discovered, he must Report within 30 minutes without delaying the rescue work.

3. Anyone who neglects his or her duties, is irresponsible, delays in reporting or does not arrive in time during the flood season duty and flood prevention and disaster relief work, the relevant personnel must be seriously held accountable; those who cause serious consequences shall be punished in accordance with the law. Hold those primarily responsible accountable.

Hospital emergency plan for preventing typhoons and rainstorms 2

1. Guiding ideology:

Preventing typhoons and heavy rains is an important task related to the life safety of teachers and students and the safety of national property. In order to effectively ensure In order to improve the safety of teachers and students and property, and to improve the kindergarten's ability to prevent floods and typhoons, this plan is specially formulated based on the principle of "prevention first, safety first".

2. Prevention steps:

1. List and contact number of the leadership team

Team leader:

Team members:

The kindergarten has launched a typhoon and flood prevention plan and implemented a 24-hour leadership and 24-hour duty system.

3. Emergency measures:

1. Strengthen information communication, so that the situation from above can be communicated to others, and the situation from below can be reported.

When a major flood occurs, all leaders are in place, and the flood prevention and typhoon prevention leading group begins to operate; leaders in charge report the flood situation to the flood prevention and typhoon prevention leading group; comprehensive deployment of anti-typhoon and flood prevention work.

2. Prevention first:

Clear the corridor. Before the typhoon makes landfall, all debris and flower pots on balconies and corridors must be cleaned up to prevent them from being blown down by the wind and injuring people when the typhoon makes landfall.

Close the doors and windows. When typhoons and heavy rains come, the wind and rainfall are heavy. Doors and windows must be closed to prevent wind and rain from damaging doors, windows, furniture, and causing casualties.

The janitor carried out a comprehensive dredging of the sewers and main water collection wells throughout the school.

Clear the gutters and downspouts on the school buildings, and prune and strengthen the large trees throughout the school.

Conduct a comprehensive safety inspection of the lightning protection facilities and outdoor wires of the entire school building.

Conduct a comprehensive safety inspection on outdoor antennas, air conditioner outdoor units, and external hanging objects.

Conduct a comprehensive inspection of indoor power supplies, sockets, doors and windows in each department.

If circuits and wires are interrupted due to typhoons, the power switch should be turned off immediately and emergency lights, flashlights or candles should be used for lighting.

4. Safeguard measures:

After the plan is launched, the kindergarten will make early warnings and record information. Convene an emergency meeting to deploy the kindergarten's flood prevention and typhoon prevention work in the shortest possible time via phone calls, etc., report flood trends, and arrange flood prevention and typhoon prevention, emergency and disaster relief requirements and tasks.

Keep in close contact with superior departments and units at all times, strengthen information communication, and ensure that the situation is communicated to superiors and reported to subordinates. Hospital emergency plan for typhoon prevention 3

In order to effectively prevent typhoons and storm surges in our town, minimize the losses caused by disasters, and ensure the safety of people's lives and property, according to the "Emergency Emergency Plan" In accordance with the spirit of the Incident Response Law and the actual situation of our town, this plan is specially formulated.

1. Guiding ideology

Based on the spirit of the instructions of the municipal and district governments and combined with the actual situation of our town, we must firmly establish the idea of ​​​​preventing floods, typhoons, and storm surges, be prepared for danger in times of peace, and be prepared for typhoons. , When a major flood comes, houses will not collapse, traffic will not be interrupted, and accumulated waterlogging will not cause disasters, ensuring the safety of people's lives and property.

2. Strengthen leadership and establish a leading group for typhoon prevention and storm surge prevention.

Establish a flood prevention, typhoon prevention, and storm prevention team with the town mayor as the team leader and the leader in charge as the deputy team leader. The leading group for tide rescue has established an emergency team. The captain is, who has an office in the Party and Government Office, and is the director of the office of the deputy secretary of the Party Committee; the flood prevention, typhoon prevention, and storm surge rescue commando team is responsible for the flood prevention, typhoon prevention, and storm prevention of our town. Arrangements for typhoon and storm surge work, inspection, supervision and reporting, promptly convey the spirit of instructions on typhoon prevention and storm surge prevention at the municipal and district levels, and summarize and report the situation of typhoon and storm surge prevention in our town.

3. Division of responsibilities

(1) Each district

1. Responsible person: Secretary of each district

2. Tasks

p>

(1) Notify all villages quickly and keep records;

(2) Forced eviction of households in dilapidated houses;

(3) Instruct vehicles to stop driving during the typhoon , reduce the number of people going out;

(4) Organize village cadres to clear weeds in channels, quickly drain accumulated water in fields, and never allow water to accumulate in ditches and depressions;

(5) Village actions Make good preparations against moisture;

(6) Livestock farming villages should be prepared against wind and rain;

(7) After wind and rain, quickly calculate the disaster situation and do rescue and comfort work.

(2) Safety

1. Responsible person: Salt Industry Office, Fishery Office

2. Tasks

(1) Quickly notify in writing the breeding and nursing personnel within the jurisdiction to evacuate;

(2) Notify sea cucumber breeding and other enterprises in writing to stop construction and evacuate mechanical personnel;

(3) Notify all salt and salt chemical companies Be prepared to prevent wind and tide;

(4) The ship docks and all operating personnel go ashore.

(3) Enterprises within the jurisdiction

1. Responsible person:

2. Tasks

Notice to do preventive work

(4) Construction site

1. Responsible person:

2. Tasks

(1) Pay close attention to Jinghu Garden and the middle school teaching building , kindergartens, communities, market buildings, and poverty-stricken housing construction sites;

(2) Written notice, pay attention to live work, high-altitude hanging objects and personal safety.

(5) Road repair

1. Responsible person:

2. Tasks

(1) Emergency repair of seriously damaged road sections; < /p>

(2) Rapid repair after the disaster;

(3) Check billboards, poles and lines along the way.

(6) Housing and nursing homes for the elderly

1. Responsible person:

2. Tasks

(1) Check housing and nursing homes The situation of nursing homes;

(2) Disaster statistics and reporting must be communicated with the flood control headquarters.

(7) Town Flood Prevention

1. Responsible Person:

2. Tasks

(1) Drainage dredging; < /p>

(2) High-altitude hanging objects such as billboards.

(8) Flood control facilities

1. Responsible person:

2. Tasks

(1) Dredge all main drainage channels and provide Gates, dam excavation, and grass clearing;

(2) Inspection of reservoirs and dams;

(3) Responsibilities for reservoirs and main canals are divided, and a division of responsibilities table is formulated.

(9) "Three Networks"

1. Responsible person: "Three Networks" Office, Forestry Station

2. Task: mainly post-disaster recovery .

(10) Rescue team

1. Responsible person:

2. Task: organize two rescue teams, divided into several groups, each with 1 to 2 people Team members lead the team to ensure that personnel are in place.

(11) Smooth flow of information

1. Responsible person:

2. Tasks

(1) Information from the Flood Control Headquarters Communication;

(2) Disaster statistics;

(3) Personnel and vehicle dispatch;

(4) Upload and release.

(12) Supervision

Responsible person: Supervision Office, notify the armed police, police stations, and health centers to prepare for disaster prevention and relief.

4. Make comprehensive preparations and implement various measures

All village committees and units in our town must make arrangements for typhoon and storm surge prevention based on their actual conditions, especially Corresponding preventive measures should be formulated in a targeted manner based on the priorities for preventing typhoons and storm surges.

(1) Do a thorough investigation of our town’s typhoon and storm surge prevention. At present, drainage ditches and pipes in our town are often occupied, covered, and blocked, and some houses are still in danger of leaking. These are important hidden dangers in preventing typhoons and storm surges. Village committees The council and the units stationed in our town must do a good job of investigation, especially in each village, and report existing problems to the town's typhoon prevention and storm surge prevention leading group immediately.

(2) Prepare work plans to prevent typhoons and storm surges and prevent typhoons and storm surges in key areas. The town's typhoon prevention and storm surge prevention leading group, based on the implementation opinions of the city and district on typhoon prevention and storm surge prevention, and combined with the actual situation of our town's typhoon prevention and storm surge prevention, formulated the town's typhoon prevention and storm surge prevention work implementation plan and key area prevention work plans. Level 1 typhoon and storm surge preparedness plan.

(3) Strengthen the duty and duty system. The town's typhoon and storm surge prevention personnel will be on duty 24 hours a day and night starting from October 1st to promptly and properly handle various emergencies. Establish a reporting system for flood prevention, typhoon prevention, and storm surge prevention. Each village committee will promptly report to the town on typhoon prevention and storm surge prevention; the town's typhoon prevention and storm surge prevention commando team shall make emergency rescue and disaster relief preparations and be dispatched immediately in case of danger. .

(4) Make preparations for flood prevention materials. Purchase shovels, picks, straw bags, iron wire, and sand and gravel materials as reserves for flood prevention, typhoon prevention, and storm surge prevention.

5. Work Requirements

(1) Be prepared for danger in times of peace and enhance awareness of danger. All units must not take it lightly and must resolutely nip problems in the bud. Seriously study the instructions from superiors on preventing typhoons and storm surges, raise awareness of the importance of preventing typhoons and storm surges, overcome paralysis and fluke mentality, firmly establish awareness of flood prevention, typhoon prevention, and storm surge prevention, and implement typhoon and storm surge prevention. Storm surge work is listed as one of the current important tasks.

(2) Strengthen leadership and implement the responsibility system for typhoon and storm surge prevention. In accordance with the requirements of the municipal and district typhoon prevention and storm surge prevention headquarters, the first-in-command responsibility system is implemented to implement the responsibilities for typhoon prevention and storm surge prevention. Each village committee has established a leading group for typhoon prevention and storm surge prevention, with the director of the village committee as the team leader, to make preparations for mass ideological and material preparations to ensure that our town can safely survive typhoon and storm surge prevention.

The staff maintains open communication 24 hours a day. During the approaching typhoon, on-duty personnel and vehicles are on duty 24 hours a day, while others are on standby.

6. Responsibility investigation

If losses or adverse effects are caused by ideological paralysis, ineffective work, inactive actions, vacant posts, absenteeism, drinking, etc., the relevant responsible persons will be seriously investigated. responsibility. Hospital emergency plan for typhoon and rainstorm 4

1. Purpose:

Before the natural disaster of typhoon and rainstorm, make various emergency preparations in advance, quickly and effectively control the situation and handle it properly , to minimize the losses that may be caused by typhoons and rains.

2. Start of the plan:

After receiving the typhoon and rain warning signal issued by the Zhuhai Meteorological Observatory, the plan was officially launched.

3. Organizational structure:

(1) Typhoon and rain prevention leading group:

Team leader:

Deputy team leader:

Members:

(2) Typhoon and Rain Prevention Working Group:

1. Engineering Group:

Team Leader:

Team members:

2. Equipment team:

Team leader:

Team members:

3. Security mobility Team:

Team leader:

Team members:

4. Administrative logistics team:

Team leader:

< p>Team members:

4. Responsibilities:

(1) Responsibilities of the typhoon and rain prevention leading group:

1. Responsible for typhoon and rain prevention work Organize, coordinate, supervise, inspect and other comprehensive work.

2. Commander-in-Chief Su Ying is responsible for overall work; Deputy Commander-in-Chief Li Jian is in charge of the security maneuver team and administrative logistics team; Deputy Commander-in-Chief Wu Jinhui is in charge of the engineering team and equipment team.

(2) Responsibilities of each typhoon and rain prevention working group:

1. Engineering team:

Responsible for supervision, construction and other units within the scope of work under its jurisdiction comprehensive work such as arrangement, inspection and coordination of typhoon and rain prevention work.

Responsible for the implementation of reinforcement, protection, drainage and waterlogging prevention work for buildings and equipment and facilities at the construction site.

Responsible for the organization, inspection, and implementation of personnel evacuation from the construction site.

Responsible for organizing an emergency rescue mobile team composed of construction units to be on standby at any time. As a reserve team for handling emergencies, it is directly dispatched by the leadership team.

2. Equipment Group:

Responsible for the layout, inspection and coordination of typhoon and rain prevention work for supervision and construction units within the scope of their jurisdiction.

Clarify the key work content of typhoon and rain prevention work and report it to the leading group.

Responsible for implementing the reinforcement, protection, drainage and waterlogging prevention work of buildings and equipment facilities at the construction site under the jurisdiction of the Equipment Department.

Responsible for the organization, inspection and implementation of evacuation of personnel from the construction site under the jurisdiction of the Equipment Department.

3. Security Mobile Group:

Responsible for the security and protection work within the jurisdiction, and make emergency adjustments to fixed posts and patrol posts.

Responsible for the preparation of necessary emergency supplies.

Responsible for the acceptance and inspection of typhoon and rain prevention reinforcement and evacuation work within the jurisdiction.

Responsible for coordinating relevant working groups to deal with detected safety hazards.

Responsible for the rescue work of personnel during rescue operations.

4. Administrative logistics team:

Responsible for collecting the latest typhoon and rain warning information in a timely manner and announcing the start and end of the plan.

Summarize the key areas for typhoon and rain prevention reported by each working group and report to the work leading group.

Responsible for the organization, coordination, inspection and supervision of administration and logistics.

Responsible for arranging food and accommodation for evacuees and staff.

Responsible for the vehicle dispatch of the administrative fleet and arranging emergency vehicles for rescue.

Contact the medical rescue agency to coordinate and arrange medical personnel.

Responsible for the coordination of various working groups.

Responsible for the inventory of people, property and property after the typhoon.

Responsible for insurance claims settlement.

5. Contact list for typhoon and rain prevention work:

Security, administrative personnel, engineering, equipment, catering, general affairs, art troupes, and markets.

Date of establishment:

Typhoon and Rainstorm Prevention Working Group: All employees of Mysterious Island.

6. Evacuation location:

Job responsibilities:

1. Safety Committee Office: Responsible for organizing various prevention and rescue work.

2. Administrative and Human Resources Department: Responsible for collecting the latest typhoon and rain news in a timely manner, announcing the activation and recovery of the plan, and overall coordination of wind prevention emergencies and subsequent handling.

3. Security Brigade of the General Affairs Department: Responsible for emergency rescue, guidance, site protection, and assisting relevant departments in handling typhoon disaster accidents.

4. General Affairs and Market Service Office: Responsible for rescuing injured persons in typhoon and rain disasters and arranging vehicle use in rescue accidents.

5. Equipment Department: Responsible for the inspection and maintenance of equipment safety in the park and the elimination of equipment hazards.

6. Engineering Department: Responsible for water and electricity treatment in emergencies; protection of scenic spots and facilities and repair of damaged parts; treatment of trees, flowers and grass. 7. Finance Department: Responsible for handling insurance claims.

8. Other departments: Prepare emergency measures to prevent typhoons and rainstorms according to the scope of the department's responsibilities. In principle, the personnel will be arranged by the heads of each department to assist in handling natural disasters.

7. Work procedures

1. After receiving the typhoon and rain notice from superiors or relevant units, the Administrative and Human Resources Department and the Safety Committee Office will immediately report it to the relevant leaders and convey it to all departments.

2. The Administrative and Human Resources Department, Security Brigade, Engineering Department, General Affairs Department, Tourist Department, Operations and Catering Department, Finance Department, Equipment Department, Art Troupe and related departments have established a typhoon and rain prevention working group, and the General Manager’s Office The leader on duty serves as the commander-in-chief. Each department manager organized and established an emergency team to lead the department in implementing emergency measures against typhoons and rainstorms.

3. All employees can recognize the signals and meanings of typhoon and rainstorms. After receiving the notice, each department should immediately organize its employees to do preventive work against wind and floods.

4. All departments and offices should organize employees to inspect scenic area facilities, reinforce and tie up boats that are rushing through the rapids, and park tour buses and cruise ships in safe locations.

5. The administrative fleet of the General Affairs Department arranges ambulance or emergency vehicles, and the medical office is responsible for rescuing the injured.

6. If there is an intensification of strong wind signal, typhoon red signal or red rainstorm forecast signal in the typhoon and rain signal, the security brigade should organize a voluntary rescue team of more than 15 people to be on standby at the post and be there at any time. As a mobile force to resist typhoon and rainstorms.

7. If a typhoon or rainstorm comes during the opening of the park, the tourist department will use the radio to inform tourists to pay attention to safety after receiving the notice from the administrative and human resources department. Security guards of the security brigade and personnel in various positions in the park should pay close attention to the safety of tourists, buildings, and facilities in the scenic area, and report any situation immediately.

8. The leader of the general manager’s office will decide whether to close the park early based on the severity of the typhoon and rain. If the park closes early, the general manager on duty should notify the Tourist Department to broadcast to tourists that the park will close early due to the impact of typhoons and rains. Employees of the General Affairs Department, Tourist Department, Equipment Department, Engineering Department, Business and Catering Department, and Art Troupe should guide tourists to leave the park in the scenic area.

9. After the typhoon, the Administrative and Human Resources Department will coordinate. The General Affairs Department and the Finance Department should take photos and collect evidence, count the lost materials, and be responsible for handling insurance claims.

10. The Engineering Department and Equipment Department organized personnel to repair damaged building facilities and flowers and trees blown down by the typhoon and rain, and were responsible for cleaning up the site.

11. Departments and personnel with outstanding performance in preventing typhoon storms will be commended and rewarded in accordance with the "Employee Rewards and Punishment Regulations". Those who seriously neglect their duties and cause heavy losses and serious consequences will be held accountable in accordance with relevant regulations. Hospital emergency plan for typhoon prevention 5

In order to prevent typhoons at our construction site, reduce disaster losses, and ensure the safety of people and property, in accordance with the "Work Safety Law of the People's Republic of China" and the district In accordance with the spirit of relevant documents of the Construction Bureau and the actual situation of our company, we formulated an emergency response plan for this project department.

1. Basic principles of emergency response

(1) This plan provides the basic procedures and organizational principles for emergency response work when our construction site is attacked or affected by a typhoon.

(2) Implement the principles of unified command in the implementation of emergency response work, each person taking responsibility, prevention first, rescuing people first, rapid response, and ensuring safety.

2. Organizational Structure and Responsibilities of Supervisors

The project department has established a leading group for typhoon prevention at construction sites

Team leader:

Deputy team Chief:

Members:

Main responsibilities:

(1) Responsible for the formulation and modification of typhoon emergency response plans for construction projects;

< p> (2) Before the typhoon comes, be responsible for notifying the construction site to do a good job in preventing typhoons, checking the reinforcement of safety facilities on the construction site, evacuating and transferring workers;

(3) Arranging personnel on duty to inspect the construction site, Immediately organize rescue and aftermath work, maintain close contact with superior authorities, and report the emergency response at the accident site at any time;

(4) After the typhoon is over, be responsible for convening relevant personnel to conduct emergency response to the accident. Summarize.

3. Implementation of the plan

(1) Received news from the meteorological station that it is expected to be affected by the typhoon:

1. The construction site project manager issued a warning Typhoon notice, the relevant personnel of the project department should pay attention to the weather news and pay close attention to the typhoon trend;

2. The project management department is responsible for notifying relevant personnel and teams on site, requiring all personnel to cooperate closely and take various measures to prevent typhoons. Preparation.

(2) When a typhoon is approaching our city and will affect our area within 48 hours, and the meteorological observatory issues a typhoon warning:

1. The project department must reasonably arrange construction and stop necessary Continuous construction process operations;

2. The project department should cooperate with the branch company to conduct pre-typhoon safety inspections. The inspection content includes whether the construction lifts are firm, whether scaffolding and other facilities are stable, whether temporary work sheds are safe, etc., and measures should be taken Reinforce to eliminate safety hazards.

(3) When a typhoon may hit our area within 24 hours and the meteorological observatory issues an emergency warning:

1. The project department’s typhoon prevention leading group is in place and arranges personnel on duty. ;

2. The construction site stopped and the construction workers evacuated to a safe area;

3. The project management department organized personnel to inspect the construction site and cooperated with the company's leadership team to further inspect the implementation of various defensive measures. situation, ensure that the construction site rescue team is in place and in a state of war;

4. During the typhoon, when a safety accident involving casualties occurs at the construction site, the company's "Emergency Rescue Plan for Major Safety Accidents in Construction Projects" shall be implemented .

After the typhoon, when the meteorological observatory releases the typhoon warning, the project department should inspect the damage and report it to the branch and the head office. The safety facilities on the construction site should be reinforced in a timely manner and the typhoon prevention work should be summarized.

;