How many meters does the rural residential foundation pile?
According to the specification requirements of building foundation, combined with geological conditions, as long as it is not a rock foundation, a pile must be driven every 0.3 meters to build a house, which means that its diameter range needs to reach 0.3 meters. According to requirements, the piling depth shall not be less than 0.5m. On the premise of satisfying the stability of the foundation, the foundation should be buried shallowly, and its buried depth and depth are determined by the nature of the foundation.
In addition, if the ground is broken, the maximum depth should be within 0.5 meters. If the local maximum frozen soil depth exceeds 0.5m, it must be buried below the frozen soil depth.
Matters needing attention in foundation construction of rural self-built houses
1, the foundation must be explored before nailing, but this needs professionals to see if the foundation can be used for construction. Because if there is a problem with the foundation, it will cause uneven nails, affect the stability of the house and bring great living risks to the occupants.
2. If the foundation is located in an area prone to floods or mudslides, it is not suitable for construction. If it must be built, it is necessary to add a spillway at its lower part and build a refuge platform at its upper part, otherwise it will be unsafe to live in.
3. For the ground piles of houses, the seismic performance should be considered when piling, and materials that meet the requirements must be used, and materials with quality problems cannot be used. Because it is related to the stability and safety of the house.