What is the specific operation schedule of beijing subway line 2?
Jishuitan (2 1:55)- Gulou Street (2 1:58)- Andingmen (22:00)- Yonghegong (22:02)- Dongzhimen (22:06)- Dongsishituo (22:08)-
Subway interchange station: Jianguomen, Fuxingmen: Interchangeable subway 1 Line (m1); Xizhimen and Xuanwumen: transfer to Metro Line 4 (M4); Lama Temple and Chongwenmen: You can transfer to Metro Line 5 (M5); Xizhimen and Dongzhimen: You can transfer to the subway 13 (M 13). ? Subway transfer station: Dongzhimen: You can go to the airport express (L 1).
Beijing subway line 2 (hereinafter referred to as "Line 2") is a circular subway in Beijing and the first circular subway line in China. Built along the original inner city of Beijing, it was put into operation on September 20th. 1984.
The east, north and west sections of the whole line overlap with Beijing Second Ring Road, and the southern section of the line runs along Changchun Street-Qianmen-Jianguomen. The total length of the line is 23. 1 km, with 18 stations and 1 depot. The color of the line sign is blue. Changchun Street Station to Beijing Station is a part of the first phase of the project, which was completed in June 1 969+1October1. The remaining stations, Fuxingmen Station to Jianguomen Station, are the second phase of the project, which was opened on September 20th. 1984.