Guide for Winter Maintenance of Concrete Pavement
Temperature control
After the concrete pavement is poured, we suggest covering it with straw curtain and plastic film to ensure that the temperature is kept above 5 degrees Celsius during maintenance. Avoid using sprinklers for maintenance, so as not to cause unnecessary trouble.
Curing agent spraying
For cement pavement with high requirements, we suggest that you spray curing agent immediately after concrete pouring to keep the surface moist and enhance the strength of concrete.
Moving canopy
If you need to further improve the maintenance effect, you can consider building a mobile shed or a stove to raise the temperature, but please note that these measures may increase the cost.
Sprinkler curing
When choosing the maintenance method, please ensure that the concrete surface is not damaged, and after the initial setting of the pavement, sprinkle water for maintenance according to the weather conditions.
Building manual
To ensure the construction quality, please refer to the winter construction measures guide in the construction manual.