China Naming Network - Eight-character fortune telling - Why is Beijing Metro Line 3 dusty?

Why is Beijing Metro Line 3 dusty?

The main reason why Line 3 can't be implemented at this stage is that the important functional areas along the line (Sanshan Wuyuan Tourist Area in the west, Zhongguancun Science City, Xiwai Street, Jiuxianqiao, Wangjing and Capital Airport in the east) were replaced by other lines in the two planning adjustments of 1999 and 2002, and the priority of Ping 'an Street was much lower than that of the surrounding functional areas.

Compared with Line 6 in the same direction, Line 3 in the west section may have a slight advantage, but Line 3 in the east section only has Dongba (Dongba was also planned for long-term implementation at that time), and Line 6 has two heavyweight influencing factors, CBD and Tongzhou New City. As a decision-maker, I will definitely choose Line 6 and give up Line 3, so Line 3 has been delayed until today.

Extended data:

There are 1 Dongba vehicle bases in the first phase of Beijing Metro Line 3, including the rolling stock depot of Beijing Metro Line 3 and 12, comprehensive maintenance center, general material warehouse and special vehicle testing base. The vehicle base is located in the north of dongfeng station and south of Dongba Road, with a total area of about 63 1 000 square meters.

The first-phase project of Line 3 is equipped with 1 10KV traction substation 1 in Chaoyang Park, and tie lines are set at Workers Stadium Station, Chaoyang Park Station and Beijing Metro 17 and 14 respectively, with a total length of about 1km.

Baidu Encyclopedia-Beijing Metro Line 3