China Naming Network - Eight-character fortune telling - Names of all stations in Beijing Metro Line 5

Names of all stations in Beijing Metro Line 5

Beijing Metro Line 5 starts from Songjiazhuang Transportation Hub in Fengtai District in the south, passes from south to north through Shiliuzhuang Road, Puhuangyu Road, Tiantan East Road, Chongwenmenwai Street, Dongdan North Street, Dongsi Street, Yonghegong Street, Heping West Street, Huixin West Street, beiyuan road and Li Tang Road, and ends at Tiantongyuan North Station in Taipingzhuang District in the north.

From 20071October 7, 65438+ to 20165438+May 8, the passenger traffic of Beijing Metro Line 5 reached 835 million passengers, with an average daily passenger traffic of nearly 800,000 passengers. Liujiayao Station is the highest station with an average daily passenger flow of about 43,000, and the south exit of Huixin West Street is the largest station with an average daily passenger flow of 6,544.

Extended data

Bicycle parking lot

In the design of Beijing Metro Line 5, the supporting construction of motor vehicle and non-motor vehicle parking lots is considered for the first time. All stations have designed bicycle parking spots, and a considerable number of car parking lots will be built at the starting station and the terminal.

Lishuiqiao South Station, which has the least bicycle parking at each station of Beijing Metro Line 5, can park 120 vehicles, and there are 5 stations with more than 2,000 vehicles, namely, Huixin West Street South Exit Station, Yonghegong Station, Beixinqiao Station, Zhangzizhong Road Station and Liujiayao Station. .

lavatory

The bathrooms of Beijing Metro Line 5 all adopt induction flushing system. Besides toilet paper, there is also a special towel for passengers to wash their hands next to the external sink.

Passenger inquiry system

The passenger inquiry system was used for the first time in Beijing Metro Line 5. After opening, you can check the train schedules of all subway lines, watch the news and check the weather forecast on the display screen of the platform. The inquiry system is divided into two subsystems, one is the passenger inquiry system, and the big screen on the platform can display the arrival time of the next two trains in addition to the station name.