How long does it usually take to decorate the villa?

Take the villa decoration company Xingjie International Design as an example. The design scheme and quotation are satisfactory. Without changing the plan, the leveling will be completed in 5-8 months, and the villa will be completed in 8- 12 months, as follows:

The 300㎡ villa will be completed in about 9.7 months;

The construction period of 300㎡-500㎡ villa is about 1 1.5 months;

The construction period of 500㎡-800㎡ villa is about 13 months;

The construction period of villas over 800㎡ is about 14.5 months.

However, we should also consider the complexity of design and construction and the influence of various aspects.

Although the construction period is different in different areas of villa decoration, the whole process of villa decoration is the same. Take 300㎡ villa as an example:

1, design and contract signing takes about 30-60 days:

This stage depends on your own needs. The higher the general design requirements, the more detailed it is, and the longer the time, which generally takes 30-60 days, including floor plans, renderings, construction drawings, quotations and so on.

2. It will take about 45 days to dismantle and rebuild the structure:

Before renovation, the structure will be demolished and rebuilt according to the design scheme. If there is no such item, you can subtract this one.

3. Preparation for commencement is about 24 days;

The preparation stage is often ignored by many people, but it is actually very important. Because the preparatory stage of construction is completed, the quality, progress and control of subsequent construction can be guaranteed. During this period, a groundbreaking ceremony will be held, equipment and materials will be determined, and accurate pay-off will be carried out, generally about 24 days.

4, hydropower project about 36 days:

Water and electricity are the most important in the decoration process, which directly affects the comfort of life in the future. 300㎡ generally takes about 36 days, sometimes even longer.

5, mud wood engineering about 90 days:

The mud tile project includes waterproofing of kitchen and bathroom, tile laying and wall plastering. , and must pass the waterproof acceptance, generally about 90 days.

6, paint project about 45 days:

Painting projects include leveling and painting construction of walls, top surfaces, suspended ceilings and other foundations. The general working procedures are antirust treatment of base metal, flat binding treatment, base grid cloth treatment, gypsum square coating, putty leveling, primer 1 and topcoat twice.

7. The installation works will take about 120 days;

The final stage of installation includes customized material installation, various sanitary ware installation, floor installation and cabinet installation. If the products enter the site in time and the installation procedures are properly coordinated, the efficiency of installation and construction can be greatly improved to achieve timely delivery.

8. Completion stage:

In the completion stage, a comprehensive acceptance is required, such as whether the line connection is correct, whether the paint on the wall and top surface is uniform, whether the finish paint of wood products is in place, and the installation of sanitary ware and hardware.

After the acceptance, the decoration company will clear out and the owner can move in.