The development and social contribution of Huaneng Xindian Power Plant
On October 30, 2007, Unit 4 of the second phase desulfurization technical transformation project of Huaneng Xindian Power Plant successfully passed the 168-hour full flue gas trial operation. So far, all four operating units of the plant have achieved flue gas desulfurization standards.
Huaneng Xindian Power Plant began to supply heat to urban areas in 2009, and the heating area will be expanded from 900,000 square meters to 3 million square meters. Faced with the increasing water injection volume due to the increase in heating area, the power plant carefully took inventory of related problems in the heating system and formulated solutions to ensure heating demand. In order to ensure safe and stable heating this winter, the power plant took precautions and began to conduct "physical examinations" on heating equipment in September. They invested more than 600,000 yuan to conduct a comprehensive overhaul and maintenance of all equipment in the pipeline network, focusing on oiling, rust-proofing, and tightening the valves and bolts in the pipelines. They also conducted minor repairs on Unit 5, eliminating equipment defects and improving heat supply. reliability. Li Zhisen, deputy chief engineer of the power plant, said: "We implement dual machine backup. Once the operating unit fails, it can be switched to another unit within 10 minutes to ensure foolproof heating." In view of the difficulty in unloading trucks due to frozen coal caused by severe cold weather in winter, For problems such as coal bunker blockage, the power plant has formulated detailed emergency plans in advance, inspected and implemented the fuel equipment systems one by one, and promptly dealt with and rectified potential safety hazards. After the heating started, the power plant personnel strictly implemented the requirements of the operating procedures, stayed at their posts 24 hours a day, strengthened equipment inspections, solved problems in a timely manner, and made every effort to ensure the safe and stable operation of the heating equipment.
As of July 2010, Xindian Power Plant has generated more than 108 billion kilowatt-hours of electricity, making great contributions to economic development and the comprehensive construction of a moderately prosperous society.