What steps should you pay attention to when decorating a villa?
After the new house is completed, most owners will choose to decorate their new house. When it comes to new house decoration, many owners who are decorating for the first time will be confused and feel unable to start. So how to decorate a new house? The following is Everyone brings you the process of decorating a new house:
The first step, preliminary design
First of all, you should carefully understand the structure of your house, measure the actual area and understand the specific layout. I have a general idea of how to decorate the house. After the decoration company receives the user's floor plan, the designer will go to the site in person to measure and design. Finally, the decoration company will provide drawings and quotations.
The second step, main body demolition and renovation
Entering the construction stage, the main body demolition and renovation is the first project to be carried out. The main body demolition and renovation mainly includes wall demolition, wall building and shoveling. Wall covering, heating removal, plastic steel window replacement, etc. To put it bluntly, the main body disassembly is to put up the framework of the construction site first.
The third step, water and electricity transformation
Before the water and electricity transformation, the main structure disassembly and modification should be basically completed. When you start grooving water pipes, you need to have a construction plan, and proceed according to the construction plan. You must first stretch the wire according to the size, and then you can grooving. Avoid bends in the grooved wire. When grooving, you must go in two directions, one is parallel to the wall, and the other is perpendicular to the ground.
The fourth step, carpentry
Carpenters, bricklayers, and oilmen are the "three brothers" in the construction process. The basic order of appearance is: shingle oil. Carpentry decoration is different for every family. Let’s first take a look at the general carpentry decoration process: Carpenters enter the site - review the drawings, decide on the wood and quantity - materials and tools enter the site - the construction personnel should plan the construction sequence. It is best to be specific about what construction should be carried out every working day - the construction of the woodwork construction platform - the first carpentry construction: the erection of the ceiling keel - the production of doors and windows - the furniture frame - the woodwork surface encapsulation - details Repair - paint - carpentry acceptance - carpentry exit.
The fifth step, mud tiles
The mud tile project is an important part in the decoration construction stage. They need to clean the base layer, find the slope layer, make the waterproof layer, and make the insulation board. , hanging tiles, detailed processing. The construction steps of home decoration mud and tile projects are: waterproof layer - insulation layer - tile surface - laying of floor tiles - laying of wall tiles. Installation of door stones and marble window sills. The installation of the door stone can be completed together with the floor tiles, or after the floor tiles are laid. The marble window sill is usually installed after the window casing is completed. The marble installation worker will prepare glass glue and seal the marble and window casing with glass glue. . Floor drain installation. The floor drain is the first to appear among home decoration hardware, because it must be installed in conjunction with the floor tiles.
The sixth step, painting
Painting mainly completes the base treatment of the wall, painting the surface, and painting the woodworking furniture. Pay attention when purchasing primer: It is best to use the same brand or matching paint for primer and topcoat to prevent chemical reactions between the primer and topcoat. When purchasing, carefully read the matching primer (or topcoat) type or model indicated in the outer packaging instructions. If it is not a matching paint, you need to do a compatibility test on the two.
Step 7, kitchen and bathroom ceilings
As the first step in the installation process, the kitchen and bathroom ceilings continue to "package" the home. While installing the ceiling in the kitchen and bathroom, the moisture-proof ceiling lamp and exhaust fan (bath heater) for the kitchen and bathroom should have been purchased. It is best to install the kitchen and bathroom ceiling lights and exhaust fans (bath heaters) at the same time, or leave threads and openings. At the same time, the equipment at home also needs to be installed.
Step 8, cabinets
After the ceiling is installed, you can make an appointment to install the cabinets. Also installed at the same time are the sink (which does not need to include water supply and drainage parts) and the gas stove. Before installing the cabinets, it is best to coordinate with the property management to vent the gas, because the gas stove needs to be tested after it is installed.
Step 9, wooden door installation
When installing the door, you need to install the hinges, door locks, and floor absorbers. Relevant hardware should be prepared in advance. If you want the wooden door manufacturer to install window casings and openings, you should also measure them when the wooden door manufacturer measures them, and add them to the wooden door.
Install at the same time on the day of installation. At the same time, you should consider moving the installation time of the marble window sill backwards, after the installation of the window casing.
Step 10, floor installation
You need to pay attention to the following issues when installing the floor;
1) Before installing the floor, it is best to have the manufacturer come to survey the ground. Whether leveling or partial leveling is required;
2) Before installing the floor, the flooring at home must be cleaned to ensure that the ground is dry, so do not use water during the cleaning process;
3) When installing the floor, if possible, the floor must be cut in the corridor. Cutting the floor indoors will seriously pollute the wall, and cutting the artificial stone countertops of cabinets is similar.
Step 11, radiator installation
Wooden door - floor - wall - radiator, this is a generally recognized correct installation sequence. Install the wooden door first. In order to ensure that the skirting line of the floor can be closely connected with the door cover of the wooden door; the main reason for decorating the wall later is because the installation of the floor is dirty and dusty, which seriously pollutes the wall.
Step 12. Installation of switches and sockets
The owner should have a detailed understanding or record of the number and location of switches and sockets in various rooms in the home.
Step 13, Lighting Installation
There is not much to say about installing lights. After installing the lights, the home is bright, and we say goodbye to the dazzling glare of the 100-watt incandescent bulbs during the renovation.
Step 14: Installation of hardware and sanitary ware
Install all the water pipes, bathroom accessories, toilets, clothes drying racks, etc. that you bought before.
Step 15, curtain rod installation
The installation of curtain rods marks the basic end of home decoration.
Step 16: Cleaning the land
Do not install curtains before cleaning the land; when cleaning the land, do not have furniture or unnecessary appliances at home, and try to keep as many " "Flat surface" so that pioneer cleaning can clean it thoroughly.
Step 17, Furniture Arrival
The time to purchase furniture should be after the renovation of the water circuit is completed at the earliest. We only have a rough idea of the basic size range of the furniture to choose.
Step 18, home appliances come in
At this time, the home appliances come in, they are installed, and they are ready to move in.
Step 19, Home Accessories
Home accessories are the last step of home decoration, and it has changed from decoration to decoration, including the installation of curtains, which all belong to the home accessories link. As for buying curtains, it’s best to buy them after ordering furniture to avoid style conflicts. Home accessories also include buying some green plants, hanging wall paintings, displaying crafts, etc.