Construction Commitment Letter
In today’s social life, we may all use commitment letters, and the contents of different commitment letters are also different. Do you know how to write a good commitment letter? The following are 9 construction commitment letters that I carefully compiled, hoping to help everyone. Construction Commitment Part 1
Our unit has made the following engineering service commitments in the landscape improvement and greening project of Guiliu Road in Liuzhou City:
1. All the bidding information we provided is true and reliable, and we respond to the bidding The basic requirements of the documents and various offers and terms proposed, and the bids shall be kept strictly confidential, no bidding will be done in the name of others, and there will be no bid-rigging, bid leakage or fraud. If there are any of the above behaviors, our unit is willing to accept the handling by the administrative department of the Garden Bureau.
2. Commitment period: Construction will start on May 22, 2010, and will be completed on June 10, 2010. It is guaranteed to be completed within 2x calendar days, and the maintenance period is one year.
3. After our company wins the bid, it must be carefully organized and carefully arranged, and the construction must be carried out in strict accordance with the requirements of the "Code for Construction and Acceptance of Urban Greening Projects" (CJJ/T82-99) to ensure that the landscape of Guiliu Road in Liuzhou City is improved. The quality of greening projects reaches qualified standards.
4. Our unit has sufficient maintenance and management technical strength. There are currently 41 college graduates in gardening and related majors, including 15 gardening staff. It is planned to invest 2 garden engineers, 1 engineer, 4 assistant engineers, 1 assistant accountant, 2 water and electricity maintenance workers, 4 mechanics and 150 greening workers in this bidding section. Our company promises to complete the project on time, quality and quantity within the construction period to ensure the greening and landscape effect.
5. Our unit’s existing total assets are 35.07 million yuan. It has the ability and sufficient guarantee funds to ensure that the funds are in place during the construction period and submit the bidding deposit on time.
6. The landscaping construction and maintenance machinery owned by our unit is fully equipped and has good performance. It can reasonably use various types of machinery according to seasonal characteristics and the growth and development characteristics of various plants, and carry out scientific maintenance, careful modeling, and timely maintenance. Prune to create a beautiful and neat streetscape.
7. During the construction period, our unit ensures civilized operation and safe construction at the operation site. When working at heights (such as pruning large trees) or spraying pesticides, choose a reasonable time period and place eye-catching safety placards at the site. Workers must strictly implement production safety systems and operating procedures to ensure the safety of pedestrians and passing vehicles
Safety. When machinery and humans collaborate at the same time, ensure the safety of workers and pedestrians, and avoid mechanical injuries or pesticide poisoning incidents.
8. Serve as the project leader of this bidding section and perform your duties conscientiously.
9. If you are dissatisfied with our project quality, safety, contract execution and other services, you can directly complain to the gardening department or our unit by phone or fax.
Bidding unit: Liuzhou Garden Construction Engineering Office Time:
May 21, 2010
Construction plan and construction commitment letter 2
Due to the xx project, this unit needs to temporarily occupy and excavate highway sections for construction. In order to ensure civilized construction and safe and smooth traffic on the highway, this unit promises to strictly comply with the "Highway Law of the People's Republic of China", "Road Traffic Safety Law" and other laws and regulations to ensure that the road volume and road appearance are reduced during the construction period. and negative impacts brought about by smooth roads. During the construction process, it is guaranteed to comply with the following requirements:
1. Certify the construction. Hang the "Highway Construction Permit" at the construction site and publicize information such as the construction unit, project name, and warm reminders.
2. Enclosure construction. In accordance with relevant regulations on civilized construction management, standard enclosure facilities will be used for enclosure operations within the construction area, and relevant safety warnings and other signs will be set up. The equipment, items, etc. required for safe containment will enter the site at the same time as the construction team. Construction will be organized after the construction site has been enclosed and safety warnings have been provided, and the containment will be lifted only after the construction is completed.
3. Construction should be carried out strictly in accordance with the plan, and the scope of excavation and enclosure should not be expanded without authorization. Strictly implement the approved construction plan, rationally allocate manpower and machines, avoid construction during peak traffic and busy periods, and avoid construction disturbing residents.
4. Set up obvious traffic guidance signs at the construction site and set up warning lights at night. For construction projects that have a greater impact on vehicles and pedestrians, in addition to taking measures to divert traffic, special personnel will be arranged to assist the public security and traffic management departments in diverting traffic. Conduct timely maintenance of roads within the construction area to ensure safe and smooth traffic within the construction area. (Pavement cleaning of the construction section, maintenance and management of related facilities)
5. The placement of construction materials and machinery shall not exceed the enclosed area, and living supporting facilities unrelated to the construction shall not be placed at the temporary road construction site. Temporary facilities such as warehouses and temporary offices must be set up at large construction sites. They should be set up in approved locations without affecting traffic and pedestrians. However, temporary facilities such as bamboo and wooden structures that affect the urban landscape must not be set up.
6. Large-scale mechanical construction operations should be completed before 10:30 pm as much as possible, and effective measures should be taken to reduce construction noise and dust generated by construction.
Construction unit (stamped):
(seal) person in charge:
Responsible person:
Year, month, day construction commitment Book 3
In order to ensure the successful completion of the **** project, our company has made the following commitments:
1. Quality Assurance
1. Construction Quality: In order to ensure the quality of construction, the relevant provisions of the construction quality specifications and standards (including mandatory standards) of construction projects are conscientiously implemented. Technical briefings are provided to construction personnel before construction until each worker is familiar with the operating technology. Construction is required to strictly follow the operating technology during construction. The construction quality is strictly inspected according to the "three inspection system" (self-inspection, handover inspection, professional inspection). If each process is not inspected or does not meet the quality requirements, the next process will never be constructed, and a comprehensive quality management system will be established. system and quality assurance system to ensure project quality.
2 Materials: Strictly control the quality of incoming materials, perform material inspection procedures, and use materials with certificates and re-inspection reports.
2. Guarantee of construction period
1. Organize reasonable measures:
① Unified scheduling and management by the project department.
② Implement the arrival, dispatch and management of materials, machinery and labor in a timely manner. Make arrangements for the process and prepare the working surface in advance.
2. Implement progress management:
① Arrange weekly plans, issue quotas and completed project quantity indicators for teams and individuals, and clarify responsibilities.
②The team conducts self-inspections on progress and quality every day, and proposes specific measures to complete the plan. Coordination meetings will be held every week to coordinate processes and construction progress, and promptly resolve factors that delay the construction schedule.
3. Time limit commitment: Ensure that the project is completed on time according to the contract time limit.
3. Safe and civilized construction
The construction team is directly responsible for safety and is assigned a full-time safety officer. In addition to complying with the requirements of safe operating procedures, you should also pay attention to the following points:
(1) Construction electricity safety
(2) Safety measures
1. Implement the policy of "safety first, prevention first". During the entire construction process, we must conscientiously abide by the construction safety work regulations and safety management systems, strive to achieve safe production and civilized construction, and prevent malignant accidents from occurring.
2. Implement safety regulations.
3. Establish a construction accident insurance system and purchase construction accident insurance for project construction personnel in accordance with the law.
Sign labor contracts with project construction personnel in accordance with the law, pay workers’ wages on time, and never default on wages to migrant workers.
4. Consciously accept the supervision and inspection of construction project quality and safety by the user unit and its management department, and promptly rectify the problems raised during the inspection.
IV. Public Security Management
1. Convene a public security education meeting every week, assign a dedicated person to be responsible for public security management, and implement various public security management measures to each team.
< p> 2. Fighting among construction team members is not allowed. Construction personnel are strictly prohibited from exceeding the prescribed scope of activities and affecting the lives of construction site management personnel.3. Anyone who fails to comply with various public security regulations on the construction site will be dismissed.
5. Environmental Sanitation
1. Domestic waste must be sorted out in a timely manner at the construction site every day, and the living quarters must be kept clean;
2. Waste at the construction site must be cleaned up every day. Prevent pollution;
3. All garbage must be disposed of in designated places and must not be left indiscriminately without authorization.
4. Resolutely implement site clean construction behaviors to ensure a clean and tidy construction environment.
Commitment unit (signature):
____________________
Commitment person (signature):
_________________________
Construction Commitment Letter 4 on **month**, 20xx
If our company is lucky enough to win the bid, our company will do its best to complete the construction tasks. Our company will bear the quality warranty responsibility for the project during the quality warranty period in accordance with laws, administrative regulations or relevant national regulations on project quality warranty.
1. Quality warranty period
In accordance with the "Construction Project Quality Management Regulations" and relevant regulations, our company has agreed that the quality warranty period of this project shall be implemented in accordance with the current national warranty regulations.
The quality warranty period is two years from the date of project completion and acceptance.
2. Quality warranty responsibility
1. For items that fall within the scope and content of the warranty, our company will send personnel to perform warranty within 7 days after receiving the warranty notice.
2. In the event of an emergency repair accident, our company will immediately arrive at the accident site for repairs after receiving the accident notification.
3. After the quality warranty is completed, your organization will organize acceptance.
3. Commitment
After the project is completed and inspected, our company will establish a follow-up visit system for project quality and function usage.
Our company strictly implements the regulations of the Municipal Construction Committee on warranty and maintenance, actively signs warranty contracts with construction units, issues warranty service cards, and implements three announcements to ensure that customers can report the project status to us in a timely manner. Starting from the acceptance and delivery of the project after completion, we have established the ideology of "customer is God" and user first, and provided thoughtful services in strict accordance with the warranty period stipulated by the state.
The first return visit will be made six months after the project is handed over for inspection to understand the problems in quality and functional use of the project, and put them on record. Relevant personnel will be organized to carry out maintenance and processing as soon as possible until all renovations are completed. (Student Accommodation Commitment Letter)
Conduct a second return visit one year after the project is handed over to learn more about the customer’s opinions and suggestions on the project, and respond within a short period of time to satisfy the customer. Keep records of each return visit so that new renovation plans can be considered and existing problems can be solved in a timely manner.
After the warranty period, a user hotline will be established in the company to answer user inquiries and solve user difficulties in a timely and enthusiastic manner, and will be available on call.
Your organization can reserve 3% of the project quality warranty fee based on the project settlement amount, which will be returned after the warranty period expires. Our company hereby promises: During the warranty period, if our company cannot assume the warranty obligations in time, your company can arrange for other construction units to perform repairs. All maintenance costs incurred will be deducted from the quality guarantee deposit, and 100% of the warranty amount will be imposed on our company. Liquidated damages penalties. Construction Commitment Part 5
In order to further strengthen the management of safe production and civilized construction, construction units and engineering project departments must establish and improve management systems for safe production, civilized construction, sealed transportation of construction waste and bulk construction materials , various safety measures, civilized construction measures, and construction waste disposal measures must be complete and effective. Construction projects must ensure various measures and effective investment of capital costs. Construction and supervision should strictly supervise the construction units and do the following work conscientiously: p>
1. The construction area must be equipped with a solid, beautiful, environmentally friendly or landscape creative closed fence (wall) in accordance with the "Construction Safety Inspection Standards" (JGJ59-99), with a height of not less than 1.8 meters. , a neat and tight dense net or safety net must be set up outside the building to close the construction.
2. The gate must be equipped with a guard room, the entrance and exit must be equipped with company logos, one picture and five signs, a car washing station, flushing equipment and a garbage sedimentation tank, and ensure that there is no leakage or pollution when the clean car enters and exits.
3. Main construction roads and stockyards must use concrete hardened sites and use solid materials to harden or green them. Reserved land and construction waste must be transported in corresponding containers or pipelines, stacked in a centralized manner, and covered or timed. Sprinkle water, do a good job in dust control, and it is strictly forbidden to throw objects in the air.
4. It is strictly prohibited to burn all kinds of waste at the construction site.
5. Drainage facilities must be reasonably arranged on site, drainage must be smooth, and there must be no accumulation of water.
6. The venue and its surroundings must be kept clean and tidy, and materials must be stacked neatly and orderly.
7. There must be obvious isolation measures between the living area and the construction area. The dormitories and construction site canteens must meet the prescribed requirements and comply with safety conditions and health standards.
8. Ensure on-time construction, no on-site mixing of concrete, and no noise disturbing residents. Sound insulation covers should be installed in the operating areas of noisy equipment to reduce the sound volume.
9. Construction site environmental maintenance and hygiene standards must be strictly implemented (JGJ146-20xx) standards and the Ministry of Health and the Ministry of Construction's "Notice on Further Strengthening the Hygiene Management of Canteens at Construction Sites" (issued by the Health Supervision [20xx] No. 94).
10. The construction waste generated during the construction of the project should be reported to the Municipal Urban Management Bureau Residual Soil Management Center for disposal 5 days in advance, go through the disposal procedures, sign a consumption and transportation contract and the "Transportation and Cleaning Responsibility Letter", and only after approval Can be organized and implemented.
11. If you violate the above commitments, you are willing to accept administrative penalties from the competent authorities. Construction Commitment Part 6
To: (Tenderer)
We have carefully read and become familiar with all the contents of the project bidding document, and agree to comply with the contents and relevant legal forms of this bidding document. We have formed a contractual relationship with the tendering party. We are willing to accept the contents of this bidding document, agree that this document has the same effect as the contract text as an attachment to the contract, and promise that all the information provided is true, legal and valid. If there is any discrepancy, In fact, we are willing to take all responsibilities.
Once we win the bid, we will sign a contract with the project legal person in accordance with the specific provisions of the bidding documents, strictly perform the contract obligations, deliver on time, and provide high-quality materials and services for the project. In order to clarify our requirements for the bidding We make the following solemn commitments regarding the attitude, determination and confidence in the slope and ancillary greening construction projects of Guizhou Qiangui Tianneng Coking Co., Ltd.'s 1.3 million tons/year circular economy coal coking expansion project:
1. Quality Commitment
We solemnly promise that the quality of this project will meet the 100% survival rate required in the bidding documents (survival guaranteed). If quality problems arise due to our reasons during the construction process, we are willing to bear the responsibility unconditionally. All losses this brings to the owner.
2. Construction period and progress commitment
We fully obey the owner's arrangements and, on the basis of ensuring a 100% survival rate (survival guaranteed), meet the owner's progress requirements and ensure that the project is on schedule. Completed.
3. Commitment to safe and civilized construction
We will obey the management of the owner and the supervision unit, abide by the owner's safe and civilized construction management system, strengthen safe and civilized construction management, and ensure the safety of construction personnel and equipment safety, ensuring that no casualties occur, meeting the owner's requirements, and assuming all legal responsibilities arising therefrom.
4. If any problems with materials and construction quality are discovered during the execution of the contract, we will replace them as soon as possible and assume the corresponding financial responsibility.
Signature and seal of the representative of the bidder: Construction Commitment Part 7
In order to prevent noise and air pollution at the construction site, protect and improve the environment, and ensure the normal work, study and work of the people in accordance with the law We hereby sign this commitment to improve our living environment and promote the construction of harmonious communities and environmentally friendly societies.
1. In order to ensure the smooth construction of the project and that there is no environmental pollution and dust in our construction responsibility area, we make the following commitments to Party A and the competent authorities at all levels:
1. During the construction period, we will strictly abide by the laws and regulations on production safety and environmental protection, implement the rules and regulations and technical standards for production safety and environmental protection, comply with Party A’s safety and environmental protection management system, and accept Party A’s safety and environmental protection supervision, Inspection and assessment.
2. During the construction period, six 100% measures shall be strictly implemented, including fencing around the construction site, covering material stacks, sealing the muck trucks, flushing vehicles entering and exiting, hardening the ground at the construction site, and wet work at the demolition site.
3. Actively cooperate with Party A during construction operations to implement relevant measures to prevent environmental pollution such as dust, noise, solid waste and wastewater in the construction organization design of this project.
4. We will comply with relevant laws, regulations and other requirements, take effective measures to control noise, dust, and air pollution, and protect the working environment and the occupational health of workers and surrounding people.
5. In order to prevent construction dust, we will send special personnel to take charge of dust reduction measures such as cleaning and sprinkling water in the construction responsibility area of our unit according to the on-site conditions (except for rainy, snowy and freezing weather); During construction, dry weather, and weather conditions with wind force level 4 or above, the number of waterings should be increased appropriately.
6. Domestic waste and construction waste at the construction site should be classified and stored in a centralized manner according to regulations, and should be cleared and disposed of in a timely manner.
7. The high-noise equipment we use at the construction site must take anti-noise pollution measures in accordance with relevant regulations to reduce noise pollution to the maximum extent and meet the noise emissions specified in the "Measurement Method for Noise at the Boundary of Construction Sites" standards; and equip construction machinery that easily generates dust with dust reduction and anti-dust devices.
2. Accountability
Anyone who fails to perform his duties as required by regulations and causes consequences will be severely dealt with by the relevant units, relevant responsible persons and other directly responsible persons; this constitutes a crime If found, it will be transferred directly to the relevant law enforcement agencies.
This letter of commitment will take effect from the date of signature by both parties, and will be automatically terminated when the cooperative relationship between the two parties ends; this letter of commitment is made in duplicate, with Party A holding one copy and Party B holding one copy
Construction unit: Baiyun Primary School, Yongchang Town, Liangzhou District
Signature of the person in charge:
Commitment unit: Jinchang Founder Construction and Installation Engineering Co., Ltd.
The company is responsible Signature:
Construction Commitment Letter 8 on Month and Day 20xx
To Bengbu China Railway Investment Development Co., Ltd.:
Our company is honored to undertake the construction of Bengbu City Dragon Building The construction of the cooperative development project of Binhu New District on the west bank of Zihu. In order to ensure the safe and civilized construction requirements of the project, promote safe and civilized construction at the construction site, and improve the construction environment at the construction site, in order to ensure that Bengbu City’s safe and civilized production standardization demonstration site is obtained, our company is now We solemnly commit to the safe and civilized construction of this project as follows:
1. Carry out temporary construction layout in accordance with the temporary construction plan and standards approved by the contractor, control the entire construction process in accordance with the requirements of safe and civilized construction, and ensure that the project From the start of construction to the completion of construction, the annual minor injury accident rate will not exceed 5‰, to eliminate major and above production safety accidents, curb general production safety accidents, and ensure that Bengbu City's safe and civilized production standardization demonstration site is obtained.
2. If any production safety accident occurs due to our fault, the responsibility will be borne by our company and has nothing to do with the contractor, who will not bear any responsibility.
3. Strictly abide by national laws and regulations, adhere to the safety production policy of "safety first, prevention first, comprehensive management", effectively implement the safety production responsibility system of personnel at all levels, and strive to achieve safe production Controlling, being in control and being able to control.
4. Establish and improve the production safety assurance system and supervision system, improve the production safety command system, improve the safety management and assessment system, formulate key work requirements and measures to achieve annual safety production goals and track and inspect the implementation .
5. Carefully carry out risk point analysis and pre-control, vigorously carry out standardized operations, scientifically analyze the safety conditions of the project site, identify weak links and accident risks,
Timely Take effective preventive measures.
6. Ensure the full investment of funds required for safe production, focus on ensuring the extraction and use of funds required for anti-accident measures and safety technical labor protection measures plans, establish a safety production reward fund, and ensure that safety rewards are Fees apply for withdrawal and use.
7. In accordance with the "Construction Project Safety Production Management Regulations" and other regulations and the requirements of relevant industry safety standards and specifications, formulate construction plans and preventive measures, implement effective protection of dangerous parts of the construction site, and prevent illegal command and To prevent illegal operations, ensure that all parts and links of the construction site meet safety requirements.
8. Regularly organize and convene regular safety work meetings to analyze the shortcomings and problems existing in safety work, and formulate corresponding rectification measures and management plans; regularly organize internal safety inspections, and conduct inspections on superior units, owners, and Problems discovered during supervision units and internal inspections shall be organized and rectified in a timely manner.
9. Regularly organize employees to participate in safety production education and training, improve the safety awareness of employees, ensure that employees are familiar with the rules and regulations on production safety and safe operating procedures, and master the safe operation skills of their positions.
10. Formulate emergency response plans for safety accidents such as major casualties and equipment damage, establish a systematic, hierarchical, consistent, clear division of labor, and mutually coordinated safety accident emergency response system, and organize its implementation.
11. In the investigation and handling of serious accidents, the principle of "four no-misses" should be strictly implemented. For serious or typical accidents, we should promptly understand the accident situation, hold a special accident analysis meeting, propose measures to prevent recurrence of accidents, and implement them conscientiously.
12. Strengthen the construction of corporate safety culture, closely focus on the company's safe production situation, carry out ideological and political work, and use various vivid and effective forms to educate employees on safety thinking, professionalism, and compliance with regulations and disciplines. , so that employees can establish a strong "safety first" mentality.
China Railway Tianfeng Construction Engineering Co., Ltd.
Construction Commitment Letter 9, 2010
1. Quality
The quality target of this project is: qualified.
We guarantee that the products we provide are all products produced by the enterprises specified in the winning bid. If it is found that the production unit of the products we provide deviates from the manufacturer specified in the winning notice, our company will Will take full responsibility.
2. Construction period:
The bidding period for this project is 38 calendar days.
3. Project warranty:
Strictly implement the relevant national standards.
4. Safety
Organize construction in strict accordance with the current national safety inspection standards (JGJ59-99) and the "Hubei Province Safety Production Management Measures" to prevent the occurrence of major safety accidents and ensure There are zero work-related injuries, ensuring safe production.
Organize and implement according to the "Safety Guarantee Measures" in the construction organization design.
V. Acceptance Method
After the project is completed, Party B shall submit the completion acceptance report and the following information to Party A five days before the project is completed and accepted.
set.
1. Documents for adding or subtracting design changes and project negotiation records;
2. Certificates of conformity for purchased materials and supporting supplies;
3. Concealment Project and individual project acceptance records and other relevant information;
4. Party A and Party B’s self-inspection project quality table.
Within two days of receiving Party B’s completion acceptance report and related information, Party A shall jointly invite the quality supervision department with Party B to conduct acceptance inspection. If Party A fails to organize the acceptance inspection without justifiable reasons, and cannot provide any suggestions for modification, Party B may regard the completion acceptance report as having been approved by Party A, and may request the quality supervision department for acceptance as scheduled.
If the project has not been inspected and accepted by the quality supervision department and Party A has used it in advance or without permission, Party A will be responsible for any quality or other problems that may arise.
The quality of the completed project should meet the national quality inspection and assessment standards and the qualification conditions prescribed by fire protection regulations.
If the quality and fire protection of the completed project fail to pass the inspection, Party B shall rework and modify according to the requirements of the indoor quality supervision department and fire management department until it reaches the national interior decoration quality standards and fire protection standards. And bear the costs of rework and modification.
6. Cooperation with owners and other departments
During the construction period, in order to be responsible to the owners, the company will strive to coordinate the relationship with the owners, supervision and other departments, obey management, and coordinate , cooperate with integrity and strictly abide by the contract. We will resolutely not subcontract or subcontract engineering projects. If relevant professional construction projects are involved and meet the conditions for subcontracting, our company will actively cooperate with your organization with your consent.
VII. Preferential conditions
In order to show the company's overall strength, give full play to the company's construction technology level, and make our company's due contribution to the development of the construction unit, the company specially offers the following discounts Conditional commitment:
1. The project payment method fully respects the owner's opinions on the premise of ensuring the smooth progress of the project.
2. The warranty period of all warranty items can be extended based on the implementation of national regulations and the requirements of the construction unit.
8. Respond to other relevant terms proposed in the bidding documents.
Once our company wins the bid, it will strictly abide by the main terms of the contract listed in the bidding documents, conscientiously implement the "Contract Law" and the "Engineering Construction Contract", and abide by the contract. In accordance with the current national construction specifications and acceptance standards, the construction will be carefully organized to complete the construction tasks within the construction period promised by the bid, ensure that the quality of the project reaches the quality level promised by the bid, and prevent the occurrence of safety accidents. Quality warranty is carried out strictly in accordance with national regulations. Otherwise, we are willing to bear the liability for breach of contract.
Commitment unit: Limited liability company