China Naming Network - Naming consultation - Construction site emergency plan

Construction site emergency plan

Model essay on construction site emergency plan (select 6 pieces)

In the study, work and life on weekdays, emergencies occur from time to time. In order to avoid causing huge losses and harm, it is inevitable to make emergency plans in advance. So what is an excellent emergency plan? The following is a sample essay (selected 6 articles) of emergency plan for construction site, which I collected for reference only. Let's have a look.

Construction site emergency plan 1 1, general rules

1, compilation purpose

Reduce the losses caused by floods, avoid and reduce casualties and material losses to the maximum extent, scientifically implement flood control dispatching and emergency rescue and disaster relief, make flood control plans and preparations, and ensure the quality and progress of the project.

2. Basic principles

Resolutely implement the leadership responsibility system of the branch; Prevention first, combined with robbery prevention; Fully deploy and highlight key points; Unified command and unified dispatch; Combining engineering measures with non-engineering measures; Mobilize all the enthusiasm of the whole site staff and unite to fight floods.

3. Compilation basis

According to the Flood Control Law of People's Republic of China (PRC), the Outline of Urban Flood Control Planning formulated by the State Flood Control Headquarters and relevant laws and regulations, and in combination with the actual situation of this project, this plan is formulated.

4. Scope of adaptation

This scheme is applicable to xxx construction site in xxx city.

Second, the organization and responsibilities

1, organization

Xxx District xxx Flood Control Headquarters (hereinafter referred to as the Headquarters) is composed of the following members:

Chief Commander: Tao Jianming (Branch Manager)

Deputy Commander: xxxxx

Member: xxx

The headquarters has an office, which is located in the 16th Project Department of Tong Jia Company in Xishili, Tianshui City. Under the unified command of the headquarters, four emergency groups, namely, communication liaison group, medical rescue group, logistics material support group and support group, were established.

2. Responsibility

(1) Main responsibilities of flood control headquarters of the project department

(1) Under the leadership of the company and the flood control headquarters of the project department, carry out the national regulations and policies on flood control, the decisions and instructions of the flood control headquarters and the instructions of the branch company on flood control and disaster relief, issue the start-up plan order, and direct the relevant departments to carry out emergency treatment.

(2) According to the disaster situation, put forward the demonstration opinions of flood control emergency plan, lead, deploy and coordinate the disaster emergency work, deploy and organize all departments to implement flood control and disaster relief work, and formulate and revise the flood control emergency plan of the project department.

(3) When a serious flood disaster occurs on the construction site, organize an emergency meeting on flood control, listen to the report on rain, water and disaster situation, and arrange the deployment of flood control and disaster relief work.

(4) To command the flood control emergency work of the Project Department in a unified way, and organize relevant personnel of the Project Department to perform their duties as stipulated in this plan.

(2) The main responsibilities of the flood control headquarters office of the project department

(1) Carry out the national laws, regulations, principles and policies related to flood control, and implement the decisions of the flood control headquarters of the project department and the dispatching instructions of the flood control headquarters at a higher level.

(2) Grasp the flood situation and disaster situation, issue flood forecast and warning when necessary, and prepare disaster situation and emergency rescue and relief report.

(3) Responsible for coordinating, inspecting and urging the flood control work of the project department.

(four) to organize the formulation of flood control plans, check and supervise the implementation of various flood control and flood fighting measures. ⑤ Assist in organizing flood control rescue teams and organizing the construction of flood control information systems. Supervision, inspection and implementation of flood control material reserves.

6. Complete other tasks assigned by the company's flood control headquarters.

(3) The responsibilities of the emergency rescue team

① Communication and liaison group: responsible for internal and external communication and keep in touch at any time. In the event of a flood accident, immediately contact the relevant departments for emergency rescue and report to the superior.

② Logistics material support group: responsible for the storage, management and supply of flood control materials according to the requirements of the company's flood control headquarters.

③ Medical rescue team: responsible for rushing to the scene as soon as possible after the disaster, making rescue plans, rescuing the wounded, and coordinating major hospitals to treat the wounded in time.

④ Security team: responsible for maintaining public order in flood control and emergency rescue. In case of emergency, relevant personnel should be mobilized to organize the evacuation and transfer of workers.

3, the rainy season on duty system

The project department arranges the personnel on duty in rainy season, strictly implements the 24-hour duty system, keeps the communication open, and the personnel on duty are strictly forbidden to leave their posts.

4, the rainy season focus on inspection and monitoring content.

(1) Dig drainage ditches and canals around the foundation pit to ensure that the waterway is unblocked and does not flow into the foundation pit.

(2) The southwest corner and northwest corner of the foundation pit are low-lying, and there are two well points inside. The surrounding ditches make water flow into the well and the water is pumped away.

(3) The drainage in the site will be drained to the south, and a puddle will be dug to gather the surrounding water and be pumped away.

Step 5: Countermeasures

In the event of a flood, the headquarters should promptly organize and direct relevant units and personnel to do a good job in flood fighting and disaster relief, and all emergency rescue teams should go to the disaster site and quickly put into rescue. The communication liaison team ensures the smooth flow of information, the logistics material support team ensures the supply of materials, the medical rescue team does a good job in the treatment of the wounded and health and epidemic prevention, and the security team maintains the public order of the project department and cracks down on saboteurs and thieves.

Construction site emergency plan 2 I. Purpose of compilation

When the flood season comes, emergency rescue personnel can rush to the construction site at the first time to control and eliminate the flood disaster in the construction process in time, ensure the safety of construction personnel, and avoid or minimize the damage to construction equipment, materials and existing projects under construction.

Second, the guiding ideology

Adhere to the flood control policy of "putting prevention first and combining robbery prevention" to ensure the safety during the whole construction period. In the process of emergency rescue, unified command, unified dispatch, division of responsibilities, the overall situation, unity and cooperation are implemented to realize the situation that all engineering members jointly prevent floods.

Three. job objective

Strengthen flood control, eliminate or reduce flood disasters and accidents, and ensure construction safety in flood season.

Fourth, the emergency organization and responsibilities

1, organization

Leading Group for Flood Control and Emergency Rescue of Project Department

Team leader: Wang Yuping

Deputy Team Leaders: Liu Changqing and Li Jibing.

Team members: department heads and construction foreman.

2 responsibility:

(1) Team leader: responsible for accident decision-making and overall command, and mobilizing rescue personnel, equipment, materials and other resources in each work area.

(2) Deputy Team Leader: Assist the team leader in his work, take charge of the specific command at the scene of the accident, organize relevant personnel to arrive at the scene as soon as possible, and organize and direct the rescue work.

(3) Emergency Action Team: After receiving the on-site alarm notice, report the general situation of the accident to the leader of the emergency rescue team as soon as possible, and notify the emergency leaders of each group to prepare for emergency departure.

(4) Evacuation guidance group: responsible for on-site vigilance, maintaining order, diverting idle personnel and traffic, guiding rescuers, materials vehicles and equipment into the rescue site and protecting the site.

(5) On-site technical team: formulate and demonstrate emergency rescue plans and organize on-site rescuers to implement rescue measures.

(6) Material, equipment and vehicle support group: organize relief materials, equipment and vehicles to enter the scene for rescue, assist rescuers to maintain equipment, and organize, coordinate and guide the rescue site.

(7) Rescue team: responsible for the first-aid care of the injured at the scene, calling 120 to assist the rescue center in sending the injured to the hospital for emergency treatment in time.

(8) External coordination team: communicate with the parties involved in the accident.

(9) Logistics Support Group: responsible for the supply of food and water for rescuers and the guarantee of rescue materials.

Verb (abbreviation of verb) Preparation, maintenance and maintenance of emergency materials.

(1) Emergency materials preparation: existing construction machinery such as excavators, loaders, pumps and generators, as well as emergency materials such as wooden boards, steel pipes, channel steel, square timber, iron wires, sacks, gravel and yellow sand.

(2) All kinds of first-aid materials should be prepared, and daily management should be strengthened.

Precautionary measures of intransitive verbs

1. Under the leadership of the leading group for flood control and flood fighting of the project management department, the responsible persons of each construction section prepare the emergency plan for flood control and flood fighting according to the specific conditions of the construction site, and provide all kinds of emergency materials, equipment and personnel. Immediately after the flood is discovered, take measures and organize personnel to implement it according to the plan.

2. The person in charge of the project department should always pay attention to the local weather, establish a perfect flood warning mechanism in flood season, prevent and forecast early, and urge the materials department to organize and deploy the personnel of relief materials and equipment in advance.

3. After receiving the emergency warning notice in flood season, all personnel of the leading group for flood control and flood fighting shall immediately hold a meeting, organize the personnel of the project management department and the construction team to make preparations for flood control, and urge all emergency measures for flood control and flood fighting. The work area should strengthen patrol inspection and be equipped with emergency equipment and materials.

4. Each construction team shall take emergency measures according to the flood control area, keep the drainage system on the construction site unblocked, cut off the power supply, and reinforce the temporary power lines to ensure smooth communication.

Seven. emergency response

1. Once the flood danger is found, the personnel on duty shall immediately notify the nearby construction workers and villagers, and report to the head of the flood control emergency team of the project department in the fastest way. The leader of the leading group should immediately report to the superior management department after receiving the danger, and immediately organize rescuers to carry out emergency rescue according to the plan.

2. The flood control emergency leading group of the project department immediately rushed to the rescue site according to the division of responsibilities, and organized the rescue work on the construction site in an orderly manner. Set up the on-site headquarters, and the chief emergency commander will immediately organize the construction team leaders and personnel to analyze the situation, immediately take measures to protect the smooth construction access road, dredge the roadside ditches, and make a correct decision on whether to evacuate the downstream residents and construction equipment, evacuate the construction personnel, and dredge the downstream river. When necessary, please ask the relevant departments of the local government to assist and guide, and report to the leaders of the supervision room and the headquarters in time. At the same time, according to the characteristics of disasters and accidents, all emergency personnel should be organized to implement effective emergency measures, and strive to minimize or eliminate losses and unfavorable factors in a short time.

Eight, reply to the production and emergency rescue summary

1. After the emergency rescue, the project leader shall write a disaster analysis report and organize relevant personnel to review the adaptability of the emergency rescue plan. If some clauses are not suitable, they should be amended.

2. Organize the organizing unit, the owner and other relevant units to hold a meeting to resume production, analyze the causes of flood disasters and accidents, and determine the construction measures such as quality, safety and environmental protection that should be taken to resume production.

Construction site emergency plan 3 With the arrival of the rainy season, xxxxxxx project is in the decoration stage, so it is particularly important to do a good job in flood control. According to the company's policy of "safety first, prevention first" and fully considering the present situation of this project, our project has formulated effective measures to ensure normal production and operation during the flood season, ensure the safety of collective property and employees' lives and property, and ensure the safety of the flood season.

First, the leading group for flood fighting and emergency rescue

Team leader:

Deputy team leader:

Team members:

Second, the division of labor:

leave out

Third, the emergency team:

Captain:

Captain:

Team members:

Four, management personnel on duty (24 hours)

Verb (abbreviation of verb) flood control measures

1, the cement silo is firm and rainproof, and flood prevention measures are taken to check whether there is rain and moisture at any time to avoid losses.

2. Prepare flood control materials, such as sandbags, raincoats, pumps, etc., in case of emergency.

3, do a good job of material supply in flood season, to ensure that the transportation and storage of materials are not lost, so as to ensure the normal production.

4. The six drainage pumps of the basement foundation pit sump should be connected well to ensure smooth drainage to cope with the rainstorm in flood season. The discharged rainwater is discharged into the municipal rainwater pipeline after secondary precipitation.

5. The office area and warehouse are equipped with enough pumps and ponchos to ensure the smooth passage of the flood season.

6, summer rainy days should strengthen the management of tower crane and construction elevator, check the braking performance, strengthen the maintenance, mechanical and electrical personnel and tower crane driver take turns to check the cable, motor, reinforcement points, found that the problem is solved in time.

7, mechanical and electrical personnel to strengthen the inspection of leakage protector in the distribution box, to avoid accidents due to leakage.

8. Check the construction site and basement after the rain, and solve the problems in time when found.

9, template support system, scaffolding foundation, such as comprehensive inspection, deformation and reinforcement.

Sixth, the scene

1. Cooperate in strict accordance with the division of labor, be on duty on time, and no one shall leave his post without the approval of the company leader. The personnel on duty listen to the weather forecast on time every day to deal with the flood season in time.

2. The site should be equipped with sufficient flood control materials and tools to prevent the occurrence of floods.

3, electrician to do a good job of daily inspection, to prevent leakage, open circuit, should check the operation of electrical equipment, lines and equipment twice a day, to eliminate the hidden danger of electric shock.

4, should always stand on the site fence, master cheng yen. , six cards and two pictures, advertising engineering facade and other facilities for inspection, to prevent injury.

Seven, logistics life

1, prepare enough daily necessities during flood control to ensure the life of employees.

2, ensure the supply of tea, do a good job in the quality and hygiene of food, so that workers can have a rest assured meal.

3, do a good job of preventing mosquitoes and flies in flood season, regular disinfection, eliminate the source of infection, to ensure the health of workers.

Eight, material preparation plan

Brief description

4. The construction site emergency plan is formulated according to the spirit of the superior documents and unified deployment. In order to ensure the safety of construction sites in our city, prevent the occurrence of serious accidents, and ensure that in the event of floods, effective measures can be taken in a timely, orderly and scientific manner to quickly eliminate the dangers brought by floods and minimize the loss of people's lives and property.

I. Adaptation scope

This implementation plan is applicable to the flood control work of the construction site within the administrative area of our city.

Second, organization.

The establishment of hejian city construction site flood emergency leading group. Responsibilities of the leading group: obey the unified command and arrangement of hejian city Housing and Construction Bureau, and be responsible for the command, deployment, implementation and supervision of flood control and disaster relief at the construction site of the city; Timely report the situation of emergency rescue and disaster relief, and properly solve and coordinate the emergency rescue and disaster relief work and the aftermath.

There is an office under the leading group, which is located in the safety supervision station, and Comrade Xing Peng is also the director of the office. Under the unified command of the leading group, be fully responsible for flood control, emergency rescue and disaster relief work on the construction site. Responsible for the disaster report on the construction site, promptly notify the flood control emergency leading group and member units to rush to the scene of the accident, coordinate the emergency rescue work of various professional disposal groups, and timely convey the instructions of the flood control emergency leading group on flood control and emergency rescue to ensure smooth communication.

The office consists of emergency rescue group, material support group, expert technical group, medical rescue group and publicity report group.

(1) Emergency rescue team: leader Ren Xiaojun, members Zhang Jiuzhan, Han Shihua, Wang Zhenjiang, Xu Shengyuan, Wang Shimin and Xu Yongsheng.

Specifically responsible for the flood control and emergency rescue plan formulated according to the technical suggestions of the expert technical team and the situation of the accident site, and quickly organize the emergency rescue team to carry out emergency rescue according to the plan.

(2) Material Support Group: leader Li, members Li Nianru, Li,,.

Specifically responsible for the implementation of flood control materials, equipment and vehicles in place, in accordance with the requirements of the flood control emergency leading group, unified deployment of flood control forces, to ensure that flood control materials, vehicles and equipment rushed to the flood control scene in time.

(3) Expert technical group: group leader Xing Peng, members Liu Zhongjie, Zhang Qibao, Guo Jiangtao, Zhu Liang and Zhao Haitao.

Responsible for organizing relevant units and experts in time, making flood prevention and rescue plans according to the construction site conditions, making suggestions, and providing technical support for flood prevention and rescue and accident investigation.

(4) Medical rescue team: captain, member Liu.

Be responsible for organizing relevant medical units to give first aid to the injured quickly, and coordinating 120 ambulance to transfer the injured to hospital for treatment.

(5) Publicity and reporting group: group leader, member, senior.

Specifically responsible for reporting disaster information to the flood control leading group of the Municipal Housing and Construction Bureau, and publicizing and reporting advanced deeds of emergency rescue and disaster relief.

Third, the implementation of the emergency plan

In the event of a major danger, the person in charge of the enterprise should immediately organize the personnel of the unit to save themselves while reporting to the competent department, and quickly start the emergency plan for flood control. The leading group unified command of emergency rescue and disaster relief work. The office should quickly find out the water situation and disaster situation, report to the leading group in time according to the accident scene, and immediately start the emergency plan for flood control at the construction site and formulate emergency rescue and disaster relief measures. According to the established division of responsibilities, each emergency team issued a notice of emergency rescue and disaster relief in the shortest time, organized and mobilized emergency rescue teams and equipment and materials, and quickly rushed to the scene of the accident to carry out emergency rescue and disaster relief. According to the specific circumstances of the accident, quickly report to the flood control leading group of the Housing and Construction Bureau, contact and coordinate public security, fire protection, transportation, hospitals and other departments, and actively do a good job in emergency rescue, disaster relief and aftermath.

Fourth, safeguard measures.

(1) The office should hold special meetings regularly to analyze and study the flood control situation and existing problems, and constantly improve the emergency plan measures. Check and guide the drills of rescue teams of member units to ensure the pertinence and effectiveness of emergency plans.

(2) The rescue and relief machinery and materials of each member unit must always maintain good working performance and state.

(3) All member units should regularly conduct professional training and emergency drills for emergency rescue personnel, improve their actual combat capability, ensure that emergency rescue can be organized quickly in case of flood, ensure that rescue is efficient, orderly and timely, and minimize losses. At the same time, they should be able to come at the drop of a hat and win the battle.

(4) In order to ensure smooth communication, the members of the leading group and the heads of relevant member units must keep smooth communication 24 hours a day. If the telephone number changes, please inform the office in time.

(5) Strictly implement the 24-hour duty system to keep the communication unblocked. The duty room is located in the office.

(6) All relevant units and personnel must unconditionally obey the instructions of the emergency plan leading group and obey the unified command and dispatch. In the process of emergency rescue and disaster relief, those who leave their jobs without authorization, fail to organize emergency rescue work, delay the opportunity, cause heavy losses and casualties will be severely punished in accordance with relevant laws and regulations.

Emergency Plan for Construction Site 5 In order to do a good job in typhoon prevention at my construction site, reduce disaster losses and ensure personal and property safety, the emergency response plan of this project department is formulated in accordance with the spirit of the Law of People's Republic of China (PRC) on Safety in Production and the relevant documents of the District Construction Bureau, combined with the actual situation of our company.

First, the basic principles of emergency treatment

(1) This plan is the basic procedure and organizational principle for emergency treatment when the construction site is attacked or affected by a typhoon.

(two) the implementation of emergency treatment follows the principle of unified command, responsibility, prevention first, rescue first, rapid response and safety first.

Second, the organization and the responsibilities of the supervisor

The project department set up a leading group for typhoon prevention on the construction site.

Team leader: Zhu Jiahua, project manager.

Deputy team leader: Dai Jinquan, deputy manager of the project department, and Zhou, technical director.

Members: Zhang Hua, safety office of the project department, Cai Baobin, quality engineer, Zhang Jianhu, builder and other relevant personnel.

Main responsibilities:

(a) responsible for formulating and revising the emergency plan for typhoon prevention in construction projects;

(2) Before the typhoon comes, inform the construction site to do a good job of typhoon prevention, check the reinforcement of safety facilities on the construction site, and evacuate and transfer workers;

(three) arrange personnel on duty, check the construction site, immediately organize rescue and rehabilitation work, maintain close contact with the higher authorities, and report the emergency treatment at the scene of the accident at any time;

(four) after the typhoon, responsible for convening relevant personnel to summarize the emergency handling of the accident.

Third, the implementation of the plan

(1) received the news released by the Meteorological Observatory, which is expected to be affected by the typhoon:

1, the site project management department issued a typhoon prevention notice, and the relevant personnel of the project department paid close attention to the weather news and the typhoon trend;

2, the project intends to inform the relevant personnel and team, require all staff to cooperate closely, do a good job in the preparations for typhoon prevention.

(two) the typhoon approaching our city will affect our region within 48 hours, and the Meteorological Observatory will issue a typhoon warning:

1, the project department arranges the construction reasonably and stops the process that must be continuously constructed;

2, the project department should cooperate with the branch to do a good job of safety inspection before the typhoon, including whether the construction elevator is firm, scaffolding and other facilities are firm, whether the temporary work shed is safe, etc. And take measures to strengthen and eliminate potential safety hazards.

(three) there may be a typhoon in our area within 24 hours, and when the Meteorological Observatory issues an emergency warning:

1, the typhoon prevention leading group of the project department is in place, and personnel are arranged to be on duty;

2. The construction site stops and the construction personnel are evacuated to safety;

3, the project intends to organize personnel to patrol the scene, cooperate with the company's leading group to further check the implementation of various defensive measures, and ensure that the on-site rescue team is in place and in a state of war;

4. During the typhoon, the safety accidents with casualties on the construction site shall be implemented in accordance with the Company's Emergency Rescue Plan for Major Safety Accidents in Construction Projects.

After the typhoon, when the meteorological station issues a typhoon warning, the project department should check the disaster situation and report it to the branch and the head office. Strengthen the site safety facilities in time and summarize the typhoon prevention work.

Construction site emergency plan. The construction site is a construction site with multiple types of work and interchange operations, and there are fire safety hazards in the construction process. Especially in the peak period of engineering decoration construction, there are many open flame operations and flammable materials, which can easily cause fire safety hazards in the construction site. In order to improve the fire safety emergency response capability, comprehensively, timely, quickly and efficiently control fire safety accidents, minimize the loss of fire safety accidents and the negative impact caused by accidents, and ensure the safety of enterprise property and personnel, according to the actual situation of the construction site, the project department formulates the emergency plan for fire safety accidents on the construction site:

I. Introduction to the Project:

Building 1#2# of Huai 'an E-commerce Innovation Service Center is invested and constructed by Huai 'an Hengxing Comprehensive Market Development Co., Ltd., designed by Huai 'an Oriental Architectural Design Co., Ltd., supervised by Jiangsu Agricultural Reclamation Construction Supervision Co., Ltd. and undertaken by Jiangsu Yancheng Erjian Group Co., Ltd. This project consists of building 1#2# and a garage, with a single project underground 1 floor and 65438+ on the ground. The total construction area is about 65438+200,000 square meters.

Second, the guiding ideology and legal basis:

Guiding ideology: Emergency prevention of fire safety during construction is an important part of building safety management. Once a fire safety accident occurs in the construction site, it will not only bring economic losses to enterprises, but also easily cause casualties. In order to prevent fire safety accidents in construction sites, it is necessary to strengthen the management of fire safety emergency rescue. Carry out the spirit of "hidden danger is more dangerous than open fire, prevention is more effective than disaster relief, and responsibility is more important than Mount Tai", adhere to the fire safety policy of "prevention first, combining prevention with elimination", and organize all employees to seriously study laws and regulations, learn fire safety principles, basic knowledge of fire fighting and rescue, and enhance fire safety awareness.

Legal basis: Article 17 of the Law on Safety in Production stipulates: "The main person in charge of the production and business operation entity is responsible for organizing the formulation and implementation of the emergency rescue plan for production accidents of the entity." Article 33 stipulates: "Production and business operation entities shall formulate emergency rescue plans for major hazard sources and inform employees and relevant personnel of the emergency measures to be taken in case of emergency."

Article 48 of the Regulations on the Administration of Work Safety in Construction Projects stipulates that the construction unit shall formulate an emergency rescue plan for production safety accidents of the unit, establish an emergency rescue organization or equip emergency rescue personnel, equip necessary emergency equipment and equipment, and organize drills regularly. Article 49 stipulates that the construction unit shall, according to the characteristics and scope of the construction project, monitor the parts and links prone to major accidents on the construction site and formulate emergency rescue plans for production safety accidents on the construction site. Where general contracting of construction is implemented, the general contractor shall uniformly organize the preparation of emergency rescue plans for production safety accidents of construction projects, and the general contractor and subcontractors shall establish their own emergency rescue organizations or equip them with emergency rescue personnel, rescue equipment and equipment according to the emergency rescue plans, and organize regular drills.

The Fire Safety Law of People's Republic of China (PRC) stipulates: "Key units of fire safety shall formulate fire fighting and emergency evacuation plans and organize fire safety drills regularly."

Three, the basic task of fire safety accident emergency rescue:

The overall goal of emergency rescue of fire safety accidents is to reduce the consequences of accidents as much as possible through effective emergency rescue actions, including casualties, property losses and environmental damage. The basic tasks of emergency rescue for fire safety accidents are as follows:

1, immediately organize the rescue of victims, organize evacuation or take other measures to protect other personnel in the dangerous area. Rescuing the victims is the primary task of emergency rescue. In the emergency rescue operation, the key to reduce the casualty rate and accident loss is to quickly, orderly and effectively implement on-site first aid and safely transfer the wounded. Due to the sudden occurrence, rapid spread, wide range and great harm of major accidents, employees should be educated and organized in time to take various measures for their own protection, and if necessary, they should be evacuated from dangerous areas or areas that may be harmed quickly. In the process of evacuation, employees should be actively organized to carry out self-help and mutual rescue work.

2. Quickly control the situation, detect, monitor and determine the hazard area, nature and degree of the accident caused by the fire safety accident. It is an important task of emergency rescue to control the dangerous sources that cause fire safety accidents in time. Only by controlling the hazard source in time and preventing the accident from expanding can the rescue be carried out in time and effectively. Once a fire safety accident occurs, a voluntary fire safety team should be organized as soon as possible to control the accident in time together with rescuers.

3, eliminate the harmful consequences, to do a good job of site recovery. In view of the actual harm and possible harm caused by accidents and human body, soil and air, measures such as sealing, isolation, decontamination and detection should be taken quickly to prevent further harm to people and pollution to the environment. Clean up the ruins in time and restore the infrastructure. Restore the accident site to a relatively stable basic state.

4. Find out the cause of the accident and evaluate the degree of harm. After the accident, we should investigate the cause and nature of the accident in time, evaluate the scope and danger of the accident, find out the casualties and do a good job in accident investigation.

Four, the establishment of emergency teams, the implementation of functional responsibilities.

Huai 'an E-commerce Innovation Service Center 1#2# Building Project Department set up a fire safety leading group and a voluntary fire brigade.

(a), team leader and team members, functional groups:

leave out

(II) Duties of the leading group: When a fire safety accident occurs on the construction site, it is responsible for directing the rescue work on the construction site, issuing rescue instructions to various functional groups, coordinating the rescue work among groups, keeping abreast of the latest trends of each group, making the latest decisions, and reporting to the company immediately. Telephone number:111. Usually, the team members take turns to be on duty, the person on duty must be at the construction site, and the mobile phone must be turned on 24 hours. In case of fire safety emergency, the duty officer is the temporary acting team leader before the emergency team leader arrives at the construction site, and is fully responsible for the implementation of emergency rescue.

Responsibilities of functional departments:

1. Liaison Group: Its task is to know about the accident and be responsible for notifying the company and the relatives of the parties as soon as the accident happens.

2. Emergency rescue team: its task is to be responsible for emergency rescue and rescue in time according to the instructions of the command group, and arrange on-site personnel to accompany the hospital. When the situation is out of control, immediately notify the liaison group to seek help from the competent government department.

3. Evacuation group: Its task is to be responsible for the evacuation and escape of personnel in case of accident.

4. Rescue team: Its task is to treat the injured and send them to the hospital for emergency treatment.

5. Security team: responsible for controlling losses, rescuing materials, setting a warning zone on the scene of the accident, preventing people irrelevant to the project from entering the scene, and protecting the scene of the accident from being damaged.

6. Investigation team: analyze the cause, process, result and economic loss of the accident, and report the investigation to the company in time.

7. Logistics team: responsible for the supply and logistics support of emergency materials, equipment and appliances.

8. Voluntary fire safety team: In the case of fire safety, the list of people who actively participate in fighting and rescue and their division of labor will be hung on the office wall of the project department according to the method of pre-plan drill.

(3), the location of the emergency team and the contact telephone number of relevant units and departments:

;