China Naming Network - Naming consultation - Are there any classic examples of good project management?

Are there any classic examples of good project management?

Shanghai Metro Shield Equipment Engineering Co., Ltd. is mainly engaged in shield tunnel construction management and technical development, installation, commissioning, maintenance, technical consultation, training and shield construction-related foundations of shield machine-related equipment. Professional company for reinforcement, waterproofing of underground structures, anti-corrosion and engineering surveying.

The company has four functional departments including office, equipment engineering department, planning and operation department and finance department, and three on-site project management departments. It has a group of middle and high-level professional and technical personnel engaged in various majors in shield construction. Engineering and technical personnel account for 88% of the total number of employees, reflecting the characteristics of a technology- and management-intensive company.

The company has participated in the construction of section tunnels for Shanghai Metro Line 1 and Metro Line 2 projects, and is the responsible unit for this project. At present, the company has 19 shield machines, all of which are internationally advanced earth pressure balance shield machines introduced through international bidding, making the company the professional company with the largest number of shield machines in China, helping the company to participate in market competition and welcome Market challenges have laid a solid material foundation. We have also made material preparations to participate in the *** Hexin Road Elevated Project, the Pearl Line Phase II Project and even the new round of rail transit construction.

The company takes "people-oriented, management as the soul, perseverance, pragmatism and forge ahead" as its enterprise spirit, and science and technology as the primary productive force. It has won the Science and Technology Progress Award from the Ministry of Construction and the municipal and bureaus many times. And has been rated as "Shanghai Excellent Company" for four consecutive years.

The company has also passed the ISO9001 quality system certification, which enables the company to have a sound quality management system to ensure project quality. The company's equipment engineering department won the honorary titles of "Shanghai Civilized Team", "Learning Team" and "Shanghai Red Flag Team" of the Municipal Construction Union in 2000 and 2001.

Case Introduction

1. Project Achievements Display

1. Enter the "Collaborative Guarantee System" through the Shanghai Metro Shield Company website

2. After entering your account and password, enter the "System"

3. Through the "Central Console", you can have a panoramic view of the entire shield construction in Shanghai!

4. Monitor the "progress" of the city's daily excavation, and the real-time excavation data is accurate to "every day"

5. Click to view the detailed "progress" status

6. View the real-time progress of each line!

7. Check the real-time status of each shield machine!

8. Check the implementation progress of each construction unit!

9. Monitor the real-time operation data of each shield machine, and the system scans it every 5 minutes!

10. Construction process project management, the progress status of each construction interval is clear at a glance!

11. Management is accurate to "per person/day", and the "daily report", "construction diary" and "fault information" at the construction site are known every day!

12. A "daily report", the construction information of the day is dynamically presented in front of your eyes!

13. A "Navigation Map", "Construction Unit Progress", "Line Progress", "Progress Ranking List", "Progress Trend", "Shutdown Trend", all kinds of management methods are available!

14. What does the ups and downs of the “advancement curve” reflect? Is it management level or technical quality? Intriguing?

15. “When everyone adds firewood, the flames rise”! The assistance of many supporting units ensured the smooth progress of the construction!

16. Don’t forget “safety” when pursuing progress! Security checks on key nodes are another focus!

17. "The train runs fast, not all because of the locomotive." Inventory management of shield accessories is also very important!

18. This is the "ID card" of a shield machine. The detailed "account card" of the shield machine makes the "life experience" of the shield machine clear!

This is part of it. If you need a complete industry solution, please see

/project/17278.html