Site Work Plan for 2023 1500 words
In 2023, I joined the big family of xx Construction Co., Ltd. in xx. As a new employee, architecture gives me a feeling of home and a positive concept. I am glad to join this group and become a surveyor.
Just entered the company and was assigned to xx Patrol Department as a surveyor. My colleague is very enthusiastic about strange environment. I always ask leaders and seniors for any investigation questions. They all helped me enthusiastically, gave me experience and taught me skills. Soon I adapted to the new environment and actively participated in the construction of the project.
Measurement is the eye of engineering. As surveyors, we are engaged in surveying work based on the principle of seeking truth from facts, and everything is based on data. I remember Amsterdam, the first man to set foot on the moon, said that his small step on the moon was a big step for human progress.
Of course, Dai Nan's small step is also a big step in my life, yes, because I finally started the most important part of my life, and I started working. I summed up what I have learned in the past six months and got a deep exercise. The actual work plan for the second half of 20XX year is as follows:
First, rigorous, scientific and serious verification.
Before the construction survey, carefully review the drawings, and ask the leaders and predecessors for advice, consultation and study on the mistakes or doubts on the drawings in time. Before measuring and setting out, use CAD to calculate the coordinates and check them repeatedly to ensure foolproof. Pay attention to the preservation and timely sorting of all kinds of original materials, because "experience is summed up from countless materials"!
After measuring the pay-off, carefully ensure the position of the composite line and ensure that the actual error of each line does not exceed half a centimeter.
Second, keep forging ahead and strive for perfection.
The society is progressing and the times are developing. Only by continuous learning can we keep pace with the times. All kinds of new building materials and construction machinery are constantly being used in construction. In contrast, more construction techniques and methods have emerged, and various specifications have been developed. In today's high-speed development, not self-improvement means backwardness and can't meet the development requirements of current construction work.
Third, accept the strengths of a hundred schools of thought and make up for their own shortcomings.
Absorb other people's experience and contact with the professionals of Party A, supervision and other units, and go to the construction site to inspect and study at ordinary times to learn the construction methods and techniques of workers. See the problems from the success or failure of others, but also see their own shortcomings, so as to achieve the goal of "learning from the strengths of many families and making up for the shortcomings of one family."
Heaven rewards diligence, not rejoicing in any past achievements, always ready to solve various problems and actively respond to possible challenges. There is still a long way to go in Xiu Yuan. In the spirit of seeking truth from facts, the survey team respects science and facts, and under the guidance of the guiding ideology and spirit of the leaders of the project department, controls the quality of engineering survey, improves the internal and external integration system of survey work, implements various tasks and indicators, cooperates with the work of various departments, and contributes to the construction of world-class projects.
The strict implementation of the survey depends on the support and understanding of the project leader, and also depends on our surveyors being cautious at all times in their work and constantly thinking about verification to ensure foolproof. In order to serve the site construction quickly and well, provide the leaders with early decisions, and fully meet the inspection work on the railway, we have done countless times of repetitive work for a certain thing, coming from the wind and going in the rain. When we come back from the task with instruments on our backs, we still show our charm to other colleagues with smiling faces.
The strict implementation of the survey depends on the support and understanding of the project leader, and also depends on our surveyors being cautious at all times in their work and constantly thinking about verification to ensure foolproof.
Thank you for your concern, guidance and support from manager xx, project department leaders, predecessors and colleagues! I believe I can learn and grow in the melting pot of xx project, and do my part for the company and the project department.
Site Work Plan 2023 2 [Guiding Ideology]
Guided by Deng Xiaoping Theory and Theory of Three Represents, according to the spirit of the "Six Action Plans" of the provincial government and the relevant requirements of the "Opinions on Vigorously Developing Vocational Education" of the Hangzhou Municipal Government, combined with the actual needs of our school's educational development, we will adhere to the vocational education policy of "service-oriented, employment-oriented", focus on professional modernization, and continuously deepen the reform of education and teaching around key tasks such as curriculum reform, school-enterprise cooperation, teaching research, teaching staff construction, and comprehensively promoting the credit system.
[Main work]
The first is to grasp routines and promote quality.
Continue to implement and further deepen the routine inspection of teaching, and gradually expand the inspection object from a single teacher to both teachers and students, so that the inspection content runs through the whole process of teaching and learning, making this year's routine inspection of teaching more scientific and reasonable. Routine inspection will strengthen skills teaching, directly link skills teaching with teaching performance, and require schools and teachers to actively build platforms to effectively improve the skills operation level of teachers and students.
Carefully organize and undertake the three "autcad Professional Skills Competition for Teachers and Students" in the university, city and province, and carefully organize training to strive for excellent results in various competitions.
In accordance with the requirements of the assessment rules of the teaching and research group, do a good job in preparing lessons, attending lectures, transferring jobs, counseling, assessment and other teaching links, strictly implement teaching routines, stress practical results, and improve teaching quality. On the basis of routine examination last semester, random examination and in-class lectures were carried out, requiring each teacher to attend more than 50% of classes.
Taking the management of senior three interns as an opportunity, we should strengthen the contact between the school and the industry, go out and come in, further improve the skills training of teachers and students, and truly combine teaching with practice.
Taking the construction of demonstration majors and training bases as the starting point, we should make good use of professional training venues, tap the potential of existing majors in running schools, sum up the successful experience of specialty construction, actively carry out the construction of top-quality specialty, and lead the professional construction of schools with top-quality specialty. Encourage teachers to participate in enterprise practice management; Strengthen the contact with enterprises within the scope of professional steering committees, and set an example for school-enterprise cooperation in other professions.
Second, teaching and research activities.
Open two demonstration exchange classes, do a good job in evaluating classes, and improve the classroom teaching level of the whole group of teachers.
With the implementation of the school credit system, it is necessary to do a good job in the study of elective courses in this major and do a good job in elective courses.
Organize these teachers to seriously participate in the teaching and research activities of the architectural teaching and research group of Hangzhou Vocational Education Research Center.
Organize teachers in this group to further study the professional teaching guidance plan and study the new version of the national professional planning textbook. Prepare lessons collectively and exchange learning experiences. Further carry out the research and implementation of inquiry learning, and strive to carry out teaching reform.
Third, the research topic
The teaching reform is planned to start from two disciplines: architectural drawing and architectural measurement, and be extended to other professional disciplines after successful trial. Architectural drawing is divided into two parts: basic drawing knowledge and professional drawing skills, and the focus gradually shifts to professional drawing. The teaching emphasis of architectural surveying lies in the cultivation of practical ability. At the same time, reform the teaching evaluation system and methods. The assessment of architectural drawing plans to increase the assessment of professional drawing and drawing recognition ability, and gradually increase the computer drawing part. The assessment of Architectural Survey is mainly based on practical operation, supplemented by theoretical assessment, and the reform and maturity of the assessment method of Architectural Survey are promoted through regular measurement competitions.
Do a good job in research and summary, and strive for results.
Fourth, after-school tutoring.
Set up a special student counseling group for autocad architectural drawing with Mr. Lv Bin and Mr. Xiang as the core, carry out regular activities, do a good job in counseling, and strive to achieve excellent results in various competitions.
Set up the skill group of "building lofting and steel bar blanking", give good guidance, train carefully and strive for good results.
Five, examination, higher vocational entrance examination, intermediate certificate examination review
Seriously study the examination syllabus of higher vocational colleges, analyze the examination trend, do a good job in examination guidance, sort out the examination practice materials, do a good job in all-round training, and improve students' comprehensive analysis ability and application ability. Strive to contribute to improving the enrollment rate of students in this major.
Do a good job in reviewing, guiding and skill training for intermediate workers and building electrician certificate examinations organized by the Provincial Labor Department. This semester, it is planned to organize students from classes 06 and 07 to take the exam, and the target pass rate is above 95%.
Do a good job in the "Architectural Drawing" exam of two architecture classes in 2008, and the target pass rate is over 95%.
Sixth, data collation.
Do a good job in sorting out all kinds of materials of the teaching and research group, provide information guarantee for the teaching work, and at the same time provide guarantee for the publicity of the teaching and research group.
On-site work plan for 2023 3 I. Overall goal of project survey work
The project of Xx Line Railway Company was formally established in xx month, 20xx, which marked that the railway company and the Second Public Bureau officially entered the stage of subway shield business, created a blank in the subway shield market of our bureau, and was also a milestone in the construction of urban rail transit. In view of an unknown industry with strong professional skills, we should learn at work and make progress in learning, and strive to understand and master the measurement technology on the subway as soon as possible. And train a group of subway construction survey technical talents for xx Public Security Bureau.
Two, actively carry out the "management benefit year" activities, do a good job in service guarantee.
In 20XX, we continue to take "punctuality, accurate data and complete information" as the starting point and criterion of the Ministry's work, closely focus on the company's policies and objectives, actively carry out the "Management Benefit Year" activities, and do a good job in service guarantee from the aspects of personnel, technical quality and equipment.
We check important measurement technical documents in strict accordance with the requirements of quality system documents. For example, the design of measurement technology, the verification report of measurement control network and the archives of project engineering should be carefully reviewed to ensure the accuracy and reliability of technical documents.
And take fewer detours in the process of learning new knowledge, organize learning and go to other construction sites to learn our shortcomings and correct them.
Third, further strengthen team building.
Continue to strengthen the training and training of young technicians and establish a reasonable echelon of technical backbones. Due to the needs of the company's production development, the demand for skilled technicians who can work independently is increasing. Most of the technicians in our department are new employees in recent years. In addition, new equipment has been introduced in recent years. How to improve their professional level and gradually grow into the backbone is an important topic in the construction of our staff. We mainly take the following measures: when setting up a survey team, we should make a reasonable combination according to the characteristics of technicians and engineering, and give full play to the role of young technicians. For new employees, the measurement team is required to do a good job of counseling and report the work and study of new employees to their superiors regularly.
Fourth, do a good job in safety production.
Safety work is a constant and unremitting work. We will continue to do a good job in safety prevention according to the company's instructions on safety work and the actual construction and production. A, often urge and remind surveyors, especially surveyors, in the case of busy construction and production, heavy work tasks and insufficient manpower, don't forget safety work and establish the idea of safety first. Second, every time a new project starts to enter the site or personnel are mobilized, relevant requirements for safety protection are put forward. Third, special seasons or weather, such as snow season and rainy season, should be reminded through monthly meetings and quarterly directors' meetings, and a special person is responsible for tracking and supervising the implementation to ensure personal and instrument safety. Ensure 20XX years of safe production without accidents.
V. Complete the handover and encryption measurement of all survey control points during the construction period of our company.
On 2/0/day of xx, 20xx, our department and the Survey and Design Institute of China Railway Second Bureau have handed over the control points in Dengzhou Station of my project construction, and began to organize the re-survey and encryption of control points on xx, 22nd.
Six, strengthen the study of the company's internal management system.
In 20XX, the company's leading group was established, and a new compilation of internal management system was issued, which allowed employees to act according to the rules and avoided unnecessary troubles. As a programmatic document for railway companies to implement standardized management, this system is the basis of company management and the driving force for strengthening project control and fully implementing standardized management. Through the full implementation of the system, we will further study the brand-new company management model, build core competitiveness, and then cast the company brand.
Seven, complete the identification of measuring instruments and assist the content design department to complete the configuration of instruments.
The construction of our department has just entered the preliminary work, and there are not many measuring instruments needed now. Recently, our GPS was transferred to the Lanzhou-Chongqing project to realize the best distribution and use of our measuring instruments. Before being transferred to Lanzhou and Chongqing, our department has been carrying out routine maintenance and appraisal of instruments, which fully embodies our fine tradition. I hope our staff will make persistent efforts to pass on the good tradition. In addition, the measuring instruments transferred from other projects should be inspected and maintained, revised regularly and recorded, so as to avoid the deviation of measuring instruments from affecting the construction quality.
Eight, overall arrangement of variant observation and indoor data.
The xx Traffic Line 2 undertaken by the company has entered the construction preparation work, and has started the temporary wall protection work of cement mixing piles. Subsequent excavation will have an impact on the surrounding structures, especially the subway construction in the city, where there are many houses around and the economy is relatively developed. Therefore, our department will put the variant observation of structures on the agenda, make a feasible observation plan, do a good job of data statistics according to the requirements of the owner, and report the measured results on time.
Nine, strengthen personnel training, to meet new projects
Subway construction is a new industry for us, and the unknown construction technology will be the biggest test for our department. Therefore, our department will organize training and study to make the work go smoothly without affecting the construction progress. Let everyone be familiar with their posts and become the mainstay of the new construction site. Do your job well and meet higher challenges.
On-site work plan for 2023 4 I. Guiding ideology
Thoroughly implement Scientific Outlook on Development, adhere to the "people-oriented" management concept, conscientiously implement the policy of "safety first, prevention first, combination of prevention and control, and comprehensive management", fully implement the safety responsibilities of project departments at all levels, put an end to collapse and falling accidents, establish a long-term mechanism for safety production, and ensure the safety of the South-to-North Water Transfer Project according to the national safety production laws and regulations and the rules and standards of the South-to-North Water Transfer Office and the Construction Management Office of the State Council.
Second, strengthen leadership and make plans.
(1) In order to conscientiously implement the spirit of the superior documents, our bid section has set up a special leading body, held regular safety meetings to convey the spirit of activities, defined work objectives, carefully organized and set up corresponding leading groups, formulated special rectification work plans, and implemented the responsible departments and persons, so that the "special rectification work for preventing collapse and falling from high places" can be implemented within the scope of this bid section.
(2) The goal of "special rectification work to prevent falling from high places" was defined, the management and prevention of safety production were strengthened, potential safety hazards and illegal behaviors were eliminated, and various accidents such as falling from high places were effectively curbed. In order to further promote the implementation of safety production guidelines, safety production rules and regulations, safety operation procedures and safety scheme measures, promote the in-depth investigation and management of hidden dangers and the special rectification work for preventing falling from high places, establish and improve the monitoring system for hidden dangers and dangerous sources, strengthen accident prediction and early warning, prevention and emergency rescue, and strive to build a long-term mechanism for preventing falling from high places to ensure safe production in urban areas.
(3) Establish and improve the responsibility and management system of "special rectification work for preventing falling from high places" from top to bottom. In order to better implement the special rectification work for preventing falling and collapse from high places, the project department set up a special rectification leading group for preventing falling and collapse from high places, with project manager Chen Yongqiang as the team leader, deputy project manager as the deputy team leader and heads of various departments of the project department as the team members. Leaders personally pay attention to safety in production, and the project department further clarifies responsibilities, creating conditions for creating a safe and stable working and living environment.
Third, widely publicize and fully mobilize.
The project department actively carried out the propaganda work of "preventing collapse and falling from a height" in combination with the "Year of Safe Production", so that all contractors can fully understand the contents and requirements of the special rectification work; Persist in organizing new employees, project department personnel and all contractors to conduct safety education and learning every month, vigorously publicize the purpose and significance of safety education and learning to all contractors, mobilize the enthusiasm of all contractors, and improve the safety awareness and knowledge of all contractors, as well as the consciousness of obeying rules and disciplines; Continue to carry out in-depth special rectification work to prevent collapse and fall accidents, improve the safety management level of the project department, enhance personal safety awareness, and establish advanced safety culture concepts.
Four, highlight the key points, serious rectification, focusing on the root cause.
(a) to deepen the prevention of collapse and falling from a height of special rectification work.
Take the special rectification work for preventing falling from heights as an important task in the current work safety, carefully organize and arrange, do solid work, strictly standardize standards, adhere to the principle of treating both the symptoms and root causes and comprehensive management in view of the problems existing in some fields in the past, and pay close attention to the implementation of the work. Find out the problems and deep-seated reasons in the special rectification work to prevent falling from high places, take comprehensive measures, suit the remedy to the case and really solve the problems.
(two) to carry out special inspections to prevent collapse and falling from a height.
Combined with the actual situation of our bid section, we will carry out special inspections to prevent collapse and fall from high places, strengthen organizational leadership, highlight the work focus of "digging deep into hidden dangers and grasping rectification", and achieve layer-by-layer launch, layer-by-layer arrangement and layer-by-layer implementation; Comprehensive and thorough, leaving no dead ends, and striving for practical results.
Five, comprehensively carry out self-examination, mutual inspection, supervision, investigation of hidden dangers, the implementation of rectification.
This bid section focuses on the special inspection with the main content of "checking hidden dangers, finding dead corners, breaking rules and ensuring safety". Attention should be paid to "four combinations" in inspection, that is, one is to combine inspection with rectification, and rectify while inspecting; The second is to combine inspection with the implementation of responsibility and accountability; The third is to combine inspection with strengthening the basic work of safety production; The fourth is the combination of inspection and special rectification.
Six, some experience
(a) we must adhere to the principle of "safety first, prevention first, comprehensive management", and earnestly do a good job in the special rectification work to prevent falling accidents from heights, so as to be prepared for danger in times of peace and sound the alarm bell.
(2) Safety management should focus on education, establish and improve a long-term management mechanism and a perfect planning system to standardize safety production behavior, guide all contractors with publicity, enhance everyone's safety awareness with safety knowledge, and restrain personnel's behavior habits with management system.
(3) Grasp the main body to prevent collapse and fall accidents, carry out basic work, and move safety management forward and focus down. The focus of safety production work is on the team. At the scene, the key lies in leaders and safety management personnel. They should be strict in management, dare to manage, be good at management, and often go deep into the scene to find and solve problems.
(four) give full play to the enthusiasm of all parties to form a strong joint force to grasp the management of * * *. Safety in production is a systematic project, involving all aspects. It is necessary to establish a management system that pays attention to the whole vertically and horizontally, and implement comprehensive management, management and overall promotion.
In a word, with the joint efforts of * * * in this bid section, the special rectification work to prevent collapse and fall accidents will be carried out in strict accordance with the original plan. However, in the special rectification work to prevent collapse and fall accidents, there are still some people who have weak safety awareness, go their own way, are careless, and operate illegally during operation. We will persist in the idea of persistent efforts and ever-ringing alarm bells, establish the concept of safe development and "people-oriented", adhere to the policy of "safety first, prevention first and comprehensive treatment", further strengthen our responsibilities, change our style of work, pay close attention to the implementation of various safety measures, and ensure the successful completion of all objectives and tasks of our bid section in 20__.
In 2023, 20XX years have passed, and the work on the construction site will usher in a new year. Focus on the next February of 20xx, and make a good work plan for this month.
First, according to the "Regulations on Safety Management of Construction Projects" and the "Construction Law", carry out on-site construction safety management.
Second, accept the work arrangement of the engineering department and the project leader for site safety.
Three, the construction safety problems to the project manager to reflect the illegal behavior in the construction, to supervise the safety of the builder.
Fourth, remind and urge the construction unit to pay attention to the protection of underground facilities and cultural relics during earthwork excavation.
Five, coordinate the safety officer of the supervision unit to supervise the construction unit to take necessary maintenance measures for the excavation project.
Six, involving the construction safety of each major, in conjunction with the professional builder for special inspection of the corresponding project.
Seven, according to the deployment of engineering site joint safety inspection, organize the corresponding coordination work.
Eight, for the ancillary facilities of the construction site, focus on inspection of road traffic, wood, mixing, processing and other processing places, such as fire prevention, electric leakage, personnel protection, and so on and so forth.
Nine, in an emergency, you can take the current way of dealing with sudden safety accidents at the scene and report to the project manager at the same time.
The construction industry has been developing continuously, so the work on our site should also follow suit. We can't retreat, we can only move forward. Only by putting all our energy into tomorrow's construction can we have good development.