China Naming Network - Ziwei knowledge - When decorating the solar calendar in May

When decorating the solar calendar in May

2065438+May 2003 is an auspicious day for the renovation of Xinhai Golden Pig House;

2065438+On Saturday, March 25th, May 4th, 2003, the rat (Jiazi) ran north.

2065438+May 07, 2003 Tuesday, March 28th, Lunar New Year, Chongtu (Dingmao) Dongsha.

20 13 May 1 1 Lunar April 02 Saturday Chongyang (Xinwei) Dongsha

20 13 May 13 Lunar April (big) 04 Monday Chongji (Gui You) Shaxi

20 13 May 16 Lunar April (Thursday, 2007), the mouse (Bingzi) runs due north.

20 13 may 19 lunar April (big) Sunday 10 Chongtu (bazaar) Dongsha.

On May 23rd, 2065, the fourth lunar month (Thursday) was 438+03 14, and it was in Dongsha, Chongyang (Guiwei).

May 25th, 2065 438+03 Lunar April Saturday 16 Chongji (Yiyou) Shaxi

20 13 Chinese lunar calendar, April 30th (big), Thursday, 2 1, Chonghu (Gengyin) Anshan.

2013 May 3 1 Friday, April 22nd, Lunar New Year, Chongtu (Xinmao) Dongsha.

Matters needing attention in decoration

1 pre-design

Mainly according to their own living habits, a detailed measurement of their own rooms, we should not be lazy, it is best to personally measure it again, the measurement content mainly includes: clear the area involved in the decoration process. Especially tile area, wall paint area, wallpaper area and floor area; Determine the main wall size. Especially it is necessary to design the wall size of furniture in the future.

2. Demolition and transformation of the main body

When entering the construction stage, the main body removal is the first project, which mainly includes wall removal, wall building, wall skin removal, heating removal, plastic steel window replacement and so on. To put it bluntly, the main body demolition is to put up the framework of the construction site first.

3 hydropower transformation

Before the water circuit reform, the main structure should be basically completed. Some students may know that it is the first time to measure the cabinet between hydropower transformation and main body demolition. The so-called initial measurement of cabinets has no actual content, because the walls and floors have not been treated, and it is impossible for cabinet designers to give specific design dimensions, but only put forward some relevant suggestions on the positions of water inlets and lampblack machine sockets reserved by developers. It mainly includes: whether the position of the lampblack machine socket affects the installation of the lampblack machine in the future. See if the water meter is in the right position. See if the location of the water inlet is convenient for installing the sink in the future. For the first measurement of cabinets, students with a little experience can do it by themselves. After the waterway reconstruction is completed, it is best to waterproof the bathroom immediately. The kitchen generally doesn't need to be waterproof.

4 carpentry

Woodworking, bricklayer and oiler are the "three brothers" in the construction process, and the basic order of appearance is: wood-tile-oil. The basic entry principle is-whoever is dirty goes first. "Who gets dirty first" is also one of the basic principles to determine the order of home improvement, which I will mention later. In fact, carpentry, such as vertical pipe, decorative ceiling and plaster line, can also be considered as the fine link of main demolition and reconstruction in a sense, which does not conflict with the water circuit reconstruction itself, and sometimes needs some cooperation.

5 tiling

In the process of "bricklayer's second child" operation, it also involves the installation of the following three links: the installation of threshold stone and the installation of marble windowsill. The installation of the threshold can be completed together with the floor tile laying, or after the floor tile laying. Generally, after the window cover is completed, the marble installation union prepares glass glue and seals the marble and window cover with glass glue. Install the floor drain. Floor drain is the first hardware in home decoration, because it should be installed with floor tiles. Therefore, students should buy a floor drain as soon as possible when they start shopping for building materials. Installation of range hood. The range hood is the first appearance of household appliances. After the kitchen walls and tiles are paved, you can consider installing a range hood.

Step 6 paint the walls

Mainly complete the basic treatment of the wall, brush the top coat and brush the furniture played by the "carpenter boss". Students who are ready to paste wallpaper only need to let the "third oil worker" do basic treatment on the wall surface where wallpaper is planned. As for whether I left my coat for the last time, I personally don't think it is necessary to take this question too seriously. From my experience in decoration, it is of little significance to leave the top coat, because the operation behind is not dirtier than painting.

7 kitchen & bathroom hung ceiling

As an installation link, the cabinet ceiling is still continuing the "packaging" of the home. At the same time as the ceiling of the kitchen and bathroom, the moisture-proof ceiling lamp and exhaust fan (Yuba) of the kitchen and bathroom should have been bought. It is best for students to install ceiling lamps and exhaust fans (Yuba) in the kitchen and bathroom at the same time, otherwise thread ends and holes will be left.

8 cupboard installation

After the ceiling is completed, you can make an appointment to install the cabinet at home. If it goes well, it can be finished in one day. At the same time, there are sinks (excluding water fittings) and gas stoves. It is best to coordinate the property to turn on the gas before the cabinet is installed, because the gas stove needs to be tested after installation.

9 wood door installation

The second day after the cabinet was installed, as early as more than a month ago, after the wooden door was measured, it can be installed now. If it goes well, it will be a day. At the same time, hinges, door locks and floor drains should be installed. Students should prepare related hardware in advance. Remarks: The production cycle of wooden doors is generally one month. Therefore, in order to make the construction period closely connected, wooden door manufacturers should go to the door to measure the size of the door opening as soon as possible after the main body is demolished and rebuilt.

10 Floor installation

The floor can be installed the day after the wooden door is installed. If all goes well, it will take a day. Pay attention to the following problems when installing the floor: 1. Before installing the floor, it is best to let the manufacturer visit the site to investigate whether the floor needs leveling or partial leveling. Some decoration companies or teams will advise students to level the ground or partially level it, subject to the actual investigation of the floor manufacturer; 2. Before the floor is installed, the floor paved at home should be cleaned to ensure the floor is dry, so do not use water during the cleaning process. 3. When installing the floor, if possible, the floor must be cut in the corridor. This issue has been discussed before in the forum. Some students think it is immoral to cut the floor in the corridor to pollute public areas. My idea is to clean up after completion, which doesn't matter. Cutting the floor indoors has serious pollution to the wall surface, and there is also the cutting of artificial stone countertops in cabinets. I believe all the students who have been decorated have some experience.

1 1 Paving wallpaper

The next day after the floor is installed, the home is ready, and you can make an appointment to paste wallpaper. If it goes well, the same day will do. If possible, the floor should be protected on the day of wallpaper pasting; It doesn't matter if there are no conditions, and it's no problem to leave the wallpaper glue left on the floor to Pioneer for cleaning. Before pasting the wallpaper, try to make the wall "nothing".

12 switch socket installation

Students should have a detailed understanding or record of the number and location of switches and sockets in various natural rooms at home, especially those who paste wallpaper. Sometimes the wallpaper worker is irresponsible, and the wallpaper is laid at once, and there is no need for wallpaper knife to mark the position of your switch socket. So students still need to know for themselves.

13 lamp installation

14 hardware and sanitary ware installation

15 Installation of curtain rod

16 pioneer cleaning

17 furniture comes into play

18 installation of household appliances

19 home accessories

Congratulations on the successful renovation!