China Naming Network - Ziwei knowledge - 37 projects were launched without energy-saving review. Who gave the courage?

37 projects were launched without energy-saving review. Who gave the courage?

Recently, in the inspection of Liaoning Province, the Central Eco-environmental Protection Inspector Group found that the high-energy and high-emission projects in some areas of Liaoning Province were poorly managed, and some places even promoted the "two high" projects in violation of regulations. Construction, the province to reduce pollution, reduce carbon emissions and environmental quality of continuous improvement pressure. Liaoning Province is one of the important old industrial bases in China. Its energy structure is relatively heavy and its economic growth is highly dependent on energy consumption.

Around 2020, the comprehensive energy consumption of industrial enterprises above designated size in Liaoning Province is 65438+62 million tons of standard coal, an increase of 22.7% compared with 20 18. Among them, the comprehensive energy consumption of the six energy-consuming industries will be 654.38+47 million tons of standard coal, an increase of 27% over 20 18. As the name implies, this is

Because in the whole project management life cycle, it is usually necessary to conduct multiple project reviews. After receiving the materials submitted by the construction unit, the materials personnel of the audit center shall register according to the nature of the project and conduct a preliminary audit of the engineering materials. The director of the investment evaluation center will arrange personnel to review the project according to the specific situation, arrange the personnel of the investment evaluation center to review and entrust an intermediary agency to audit.

Investment examiners should carefully read the drawings and materials, and on the basis of full familiarity, go to the construction site to conduct on-the-spot investigation on the places that are not clearly stated in the drawings and materials, because in the audit process, we should focus on whether the changes and visas, quantities and quotas, application forms and charging standards are true, reasonable and accurate, and whether the prices of main materials can be obtained through inquiry. They must seek the opinions of both parties before issuing the audit conclusion, and then issue the audit conclusion.

The above answer is my personal opinion. If you have other ideas, you can discuss them below.