Can it be decorated in March of the 2022 lunar calendar? When is the auspicious day for decoration?
March in the lunar calendar is the third month of the year.
Traditionally, the third month of the lunar calendar is called the full moon, which is also called the time of cherry bud and the time of warbler.
March of the lunar calendar is called Peach Month, Spring Festival Evening, Late Spring, Spring Silkworm Month, beginning of spring, beginning of spring Day, Silk Month, Seasonal Month, Welcome Month and Late Spring.
March of the 2022 lunar calendar is an auspicious day for decoration.
Lunar calendar: the second day of March 2022; Gregorian calendar: Saturday, April 2, 2022, rushing rabbits and evil east.
Lunar calendar: the tenth day of March, 2022; Gregorian calendar: on Sunday, April 10, 2022, pigs are washed away to ward off evil spirits.
Lunar calendar: March 2022 17; Gregorian calendar: Sunday, April 17, 2022, Shanan, Ma Chong.
Lunar calendar: March 2022 19; Gregorian calendar: Tuesday, April 19, 2022, rushing to the north.
Lunar calendar: March 2, 20221day; Gregorian calendar: On Thursday, April 2, 2022, Kloc-0, the dog rushed south.
Lunar calendar: March 29th, 2022; Gregorian calendar: Friday, April 29th, 2022, Shanan, Ma Chong.
What is the process of decoration construction?
First, the civil construction stage
Enter the construction site, tear down the wall and build it; Trenching, hydropower transformation and acceptance; 24-hour closed water test for concealed hydropower renovation project, waterproof project, toilet and kitchen floor; Toilet and kitchen wall tiles.
Second, the grass-roots processing stage
After carpentry comes into play, hang the ceiling and plaster the corner line; Wrap the door cover and window cover to make a wooden cabinet frame; At the same time, we manufacture all kinds of wooden doors, plastic steel doors and flat pressing doors; Brush the wooden panel with dust-proof paint (clear oil); Leveling and laying marble countertops on the windowsill; Veneering, marking and hardcover; Treatment, grinding and leveling of grassroots walls; Stick an adhesive (protect the edge) at the joints of furniture and doors and windows.
Third, the detail processing stage.
Brush the walls at least three times; Furniture paint comes into play, filling holes and painting; Dealing with corners, laying floor tiles, solid wood or composite wood floors, waterproof marble strips and skirting lines; Installation and debugging of lamps, switches, sockets, sanitary wares, handles and door locks; Cleaning, floor tile joint repair, exit; Internal preliminary acceptance of decoration company; Three parties make an appointment for formal acceptance and deliver it to the owner.