Will there be new construction on Jiangtun-Sihui Kevin·Z Road in Guangning in 2022?
1, Zhaoqing-Gaoming Expressway (Phase I project), the proposed route scheme of the project is: main line (K+B+E+K+S line)+airport branch line (L line), with a total length of 120.508 km, which is constructed according to the standard of two-way six-lane expressway, and three connecting lines are about/kloc-0. The total investment in 2020-2024 is 2 1.927 billion.
2. Route change project of Guangning Zhonghua-Shuiyinling section of national highway G355, road upgrading and reconstruction, secondary highway 5.892km, 2019-2021.1.84.
3. Guang Ningxian Guangning Middle School Senior Middle School newly built Guangning Middle School Senior Middle School with a building area of133,400 square meters and a building area of150,000 square meters, with 3,000 new degrees. From 2023 to 2025, the total investment is 300 million.
4. The special cultural tourism project on both sides of Suijiang River in Guang Ningxian will develop and upgrade Guang Ningxian Gushui River Scenic Area along Daguan Scenic Area in Zhuhai Port and Dashajiao in pai sha zhen along Suijiang River Basin to the northernmost part of Guang Ningxian, covering an area of about 30 square kilometers, including the construction of core scenic spots, leisure and holiday, industrial development services and operations. From 2020 to 2024, the total investment will be 5 billion.
5. Guangning Red Tourism Education Project, covering an area of about 1500 mu. This project takes the red culture as the breakthrough point, takes the construction of Guangdong standardized militia training base and an important national defense education base for young people as the core, and builds projects such as red culture display and publicity, immersive military competitive experience, military training for young people and party member, and militia field training, with a total investment of 1-2023.