China Naming Network - Ziwei knowledge - How many entrances do you need for 500 square meters of fire fighting?

How many entrances do you need for 500 square meters of fire fighting?

More than two.

According to the fire protection requirements, if the room area of a public building is more than 50 square meters, it needs two spaces that are not in the same direction, and the exit needs to be provided with fire exits with a spacing of not less than 5 meters.

Public places of entertainment below 500 square meters should be filed online. The specific website is on the websites of provincial fire brigades. The design shall be put on record first, and then the lottery shall be conducted. If you don't smoke, directly accept the record. If you get it, you need to provide relevant information to the fire department within 5 working days. Within 20 working days, the fire department will conduct verification, and those that pass the verification will be accepted for filing. Those who fail to pass the rectification as required shall be re-filed. Acceptance and filing is also a spot check system. If there is no bid, report it directly to the pre-opening inspection. If there is a bid, it is necessary to provide relevant information to the fire department within 5 working days. 20 working days, the fire department will come to check. Those who pass the verification shall be inspected before the opening of the business, and those who fail to pass the rectification shall be re-accepted for the record.