China Naming Network - Ziwei knowledge - 20 10 Competition Rules of Modern Logistics-Design and Implementation of Storage and Distribution Scheme for Higher Vocational Group of National Vocational College Skills Competition

20 10 Competition Rules of Modern Logistics-Design and Implementation of Storage and Distribution Scheme for Higher Vocational Group of National Vocational College Skills Competition

1. The competition will be held in batches. According to the lottery order provided by the organizing committee of the competition, each team will send designated personnel to draw lots in turn and play against the positioning table according to the lottery number.

2. Participants can obtain the required information through the database and on-site self-measurement.

3. Players from each team elected 1 as the supervisor, and the other two were tally clerks (storekeepers). The supervisor is mainly responsible for design, modification, customer priority, outsourcing or not, and arranging two other people to work.

4. According to the customer's demand, make the use plan of the cargo space, materials, facilities, equipment, tools and labor force, and make cost accounting and time arrangement. The cost accounting is accurate to the minute, the time schedule is accurate to the second, and the result is saved as an integer.

5. Contestants should predict the possible problems in the implementation of the scheme and make corresponding solutions.

6. The scheme completed by each team in the design stage of storage and distribution scheme and all relevant paper materials shall be sealed by the contestants themselves and kept by the competition referee group. It is forbidden to make any marks unrelated to the competition on the competition results. Electronic documents are extracted by the judges of the competition jury. In the implementation stage of the storage and distribution plan, the referee will return it to the team and the players will open it themselves.

7. When executing the plan, the team members shall strictly follow the plan and shall not modify the plan without authorization. The revised plan shall be proposed and implemented by the supervisor. When modifying the scheme, the three contestants should stop working and the working hours should be calculated continuously.

8. After the supervisor revised the plan, it is still difficult to implement the plan. The supervisor can propose outsourcing, and outsource it to the team's instructor to continue to modify it until it is feasible. When the scheme is revised, the three contestants stop working and the working hours are calculated continuously.

9. If after outsourcing, the implementation of the scheme is still difficult and it can't run normally, the supervisor will apply for withdrawing from the competition, and the competition will be terminated with the consent of the referee, and the fee will be increased according to the predetermined proportion.

10. uncivilized and unsafe phenomena, irregular operation, quality problems, unreasonable division of labor and cooperation, etc. In competition, costs and expenses are increased in proportion.