Model contract for five wall-building projects
↓↓↓↓↓ Click to get more Wall Building Project Contract ↓↓↓↓
★ Wall plastering project contract ★
★ Exterior wall coating construction contract ★
★ Contract and material contract ★
★ Model contract for interior wall painting ★
Wall-building project contract 1
Party A:
Party B: ID number:
Home address telephone number:
In accordance with the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC), the Regulations on Quality Management of Construction Projects and relevant laws and regulations, and in combination with the specific conditions of this project, this contract is signed through consensus in order to clarify the responsibilities of both parties.
I. Project name:
Second, the project site selection:
Third, the contract method: labor measurement contract. Including quality, construction period, safe production, civilized construction and comprehensive management.
Four. Scope of contract:
Five, the project cost calculation method:
The total engineering quantity of Party B in this project is about, and the total project cost is about.
6. Article 5 The contract price refers to the total price at which Party B's construction quality reaches Party A's quality target. During the construction period, Party A shall provide other construction tools to Party B, and other operation tools shall be provided by Party B. ..
Seven. Time limit: Party B shall complete the masonry project within the time limit specified in the construction task list issued by Party A's construction unit, and pass the regular quality inspection by Party A and the supervisor and the finished product acceptance by Party A, the developer, the supervisor or the quality supervision department. If Party B fails to complete it within the time limit, it will be fined RMB for each day of delay.
Eight. Quality standards and acceptance requirements: Party A shall accept and price Party B's project quality in the following ways:
1. Party A shall measure the construction quality of Party B according to the current national standards, and mark the actual quantity for acceptance, so as to make separate pricing. Reaching 90 points or more (excluding 90 points) is the full-price standard score, and the cost of production is calculated at full price. Score below 90 points (including 90 points), deduct 1 point; If the acceptance score is less than%, Party B shall rectify or rework within a time limit, and the material expenses for rectification or rework shall be borne by Party B.. If the construction period is delayed, Party B shall bear the penalty of% of the total contract price for each day of delay.
2. Before the project contracted by Party B enters the large-scale construction, it shall complete the model project of a certain working face in an appropriate position, and carry out the large-scale construction based on the qualified model project. For the sample project that fails to pass the acceptance of Party A, Party A will make rectification and terminate the contract with Party B in advance. The sample workload determined by Party B shall be priced and settled at 80% of the total price, and the expenses entrusted by Party A for rectification shall be deducted.
3. Party B shall correctly assemble the rubble retaining wall; The setting of pulling stones is reasonable; The core filling material is dense, the jointing is straight and beautiful, and the maintenance is timely; The scene is civilized and tidy.
4. After each construction site or working procedure is completed, Party B must pass the self-inspection and mutual inspection carefully before submitting it to Party A for review. Party A may refuse to verify the items that have not passed the self-inspection or are unqualified in the self-inspection.
5. Party B has the obligation to protect all finished products (including reserved holes, junction boxes, boxes, panels, etc.). ) the scene. If there is any damage, Party B shall repair it to its original state at its own expense.
6. All quality problems arising from the construction of Party B must obey the rectification opinions of Party A and be rectified within a time limit; If Party A fails to make rectification within the time limit, Party A has the right to impose a fine on Party B according to regulations. Party A has the right to terminate the contract because of poor construction quality of Party B and repeated reminders are ineffective. The losses caused thereby shall be borne by Party B..
7. The project contracted by Party B has the warranty obligation within years after completion, and all maintenance work caused by Party B's construction quality during the warranty period shall be repaired by Party B free of charge.
9. Payment method:
1. The living expenses shall be adjusted by Party B before the workload is completed in the month when Party B enters the site.
2. In the construction stage, Party A shall pay Party B% of the work expenses for the work completed by Party B every month and accepted by Party A, the supervision department and the quality supervision department. When making payment, Party A will deduct the money paid for Party B in the current month and the fines incurred for some reason. In addition, Party A will not pay any loan and other living expenses to Party B..
3. After the completion of all masonry projects contracted by Party B, Party A, the owner and the supervisor will pay Party B% of the general contracting labor fee. At that time, if Party B has no follow-up project construction, Party B's construction personnel must leave Party A's construction site.
4. If Party B obtains the structural acceptance evaluation form of the relevant competent department before the Spring Festival at the end of the year, Party A will pay the remaining project cost to Party B in one lump sum after deducting the amount payable by Party B. If the project constructed by Party B fails to pass the structural acceptance before the Spring Festival at the end of the year, Party B can only collect 90% of the total project cost, and pay the rest in full within two months after the structural acceptance, except for the reserved 2% quality guarantee fund. The warranty money will be returned after deducting the warranty expenses paid by Party A at the expiration of the warranty period.
5. Party B shall establish a complete work expense settlement account. When receiving the monthly settlement of living expenses and work expenses, Party B shall prepare a salary settlement plan in duplicate according to the team members and sign it by the payee. One copy shall be submitted to the financial department of Party A. ..
6. The project payment paid by Party A to Party B has included the labor protection expenses of Party B and its subordinate personnel. Party B and its personnel shall be responsible for the expenses of various safety accidents.
Nine. Delivery and refund of deposit: Party B promises to guarantee Party A's project progress, project quality, safe construction, civilization and hygiene, consciously abide by national laws and regulations and Party A's relevant systems, and is willing to pay a performance bond of RMB (5% of the total contract price) in one lump sum before the team enters the site after signing the contract. After all the projects contracted by Party B are completed and accepted by Party A and the supervisor, all of them will be returned by the principal of Party A. If Party B fails to perform the contract, the deposit will be used as liquidated damages to compensate Party A for the losses caused by Party B. ..
X. Limited materials:
1. Party A shall restrict the materials used in Party B's contracted projects, and the types and quantities of restricted materials shall be determined separately by Party A in the construction task list. Party B shall bear the extra materials and save some materials, and Party A will reward Party B with% of the saved amount.
2. Party B must control the mixing amount of cementing materials (mortar or concrete) according to the construction progress of the day, and shall not use overnight cementing materials. In the process of masonry, it is necessary to clean up the ground ash and stone at any time, and continue to use it after secondary mixing.
3. When transporting blocks, Party B is strictly forbidden to carry them roughly. Pay attention to personal safety and reduce material losses.
XI。 Responsibilities and obligations of Party A:
1. Provide labor carts for horizontal transportation of Party B's masonry materials, and provide convenience for vertical transportation.
2. Provide Party B with construction drawings and working faces with construction conditions.
3. Party B shall be disclosed in terms of operation procedures, quality standards, schedule requirements and safe and civilized construction.
4. Be responsible for supervising, inspecting and accepting Party B's construction quality, progress, safety and civilization.
5. According to the provisions of the contract, pay Party B the contract labor service fee with payment conditions.
Twelve. Responsibilities and obligations of Party B:
1. After signing this contract, it shall sign employment contracts and safety responsibility letters with its members in time and report them to Party A for filing.
2. Strictly abide by Party A's rules and regulations, safe operation procedures, civilized construction and comprehensive management regulations.
3, must implement the provisions of all workers show certificates, set up part-time safety and quality management personnel, adhere to the disclosure before work, supervision and acceptance after work. Keep a diary. Before construction, all safety facilities, machines, tools and appliances on the construction site shall be inspected before use, and construction shall not be carried out without safety guarantee. Put an end to illegal command and operation. All safety accidents caused by illegal operation shall be borne by Party B and the perpetrators.
4. Stop the staff from connecting power randomly, and use electric cookers to cook, cook and boil water to keep warm in the dormitory. Once found, Party A has the right to punish Party B accordingly; At the same time, Party B shall bear all responsibilities and expenses caused by the accident.
5. Keep and use all kinds of machines and tools provided by Party A correctly, and compensate for the damage and loss according to the price.
6. Do a good job in the construction site after work every day, clean the environment inside and outside the dormitory, and ensure that the construction site is civilized and tidy and the living quarters are clean and hygienic.
7. Party B and its members shall not bring non-local personnel into Party A's construction site or living area. If found, Party A will punish Party B according to relevant regulations. Any unexpected losses arising therefrom shall be borne by Party B. ..
Thirteen. responsibility for breach of contract
(1) Party B is in breach of contract under any of the following circumstances:
1. Party B failed to complete the construction task as scheduled for many times, which affected the overall construction progress.
2. Party B fails to complete the rectification within the time specified by Party A and is ineffective after repeated urging;
3. Party B's poor construction quality causes Party A's material waste, schedule delay and reputation damage;
4. Party B abandons the contract halfway or subcontracts the project to a third party;
5. Party B gathers people to make trouble, bid up wages, pester wages, and disturb the normal working order of Party A;
6. Party B's contractor often leaves his post without permission, or Party B's construction personnel are seriously inadequate, which affects the progress of the project. For Party B's breach of contract, Party A has the right to impose a fine, compensate for losses, confiscate the deposit and terminate the contract.
(2) Party B is required to rework the completed project due to Party A's wrong construction guidance or design change; If the change cost exceeds RMB, Party A shall compensate Party B for the actual losses caused by rework; The change expenses within the above amount have been considered by Party A in Party B's salary and will not be compensated.
Fourteen Others:
1. In order to create a civilized construction site, all operators of Party B must wear uniform work clothes when entering the operation area. Raincoats, rain pants, rain boots and other items required for construction in rainy days shall be uniformly purchased and distributed by Party A, and the expenses shall be borne by Party B. ..
2. The expenses such as temporary residence permit, production cost and post training for special jobs required by the local government of the project shall be borne by Party B. If Party B refuses to handle it and is fined by the local competent department, it shall also be borne by Party B.. ..
15. This contract is made in triplicate, one for Party A and Party B, and one for Party A's company, and shall come into effect after being signed by both parties. By the end of the project and the payment is settled, except for the continued performance of the warranty terms, other terms will be automatically terminated, and the warranty terms will automatically expire after the expiration of the warranty period.
Party A: Party B:
Representative: telegram:
Date of signature: year month date of signature: year month day.
Wall-building project contract 2
Party A:
Party B:
After discussion between Party A and Party B, Party A agrees to build a wall for Party B's contractor.
1. Party A decides to build a fence for Party B, the height of which is 1 m, and it is built with cement bricks.
1. The range of masonry walls is 1, 2, 3, 4 and 5 buildings, and the height of masonry walls on the ground floor of ***5 residential buildings is 1 m, indicating that the project is completed.
2. The specifications of cement bricks used by Party A are: width19cm, length 39cm and height19cm.
3. All materials and expenses used shall be provided by Party A, and the expenses have nothing to do with Party B. ..
2. Party A decides to contract to Party B at the price of 1.8 yuan per brick.
3. Payment method: Party A gives Party B the following points.
1. During the start of the project, Party A must pay 80% of the project cost to Party B..
2. After the completion of the 1m high fence on the ground floor of five residential buildings, Party A must pay all the wages to Party B within 3 days. No default.
3. Pay in cash.
Four, once the two sides reached an agreement, this book will take effect immediately and permanently.
Legal Representative: Party A: (signature)
Party B: (signature)
Date:
Wall-building project contract 3
Employer: (hereinafter referred to as Party A)
Contractor: (hereinafter referred to as Party B)
Party A is willing to contract the masonry retaining wall of Shuangqiao Cultural Leisure Plaza Project to Party B. In order to ensure the project is completed on schedule and clarify the rights and obligations of both parties, Party A and Party B agree to sign the following contract terms after full consultation:
1, project content
1) Project Name: Masonry Retaining Wall Project of Shuangqiao Cultural Leisure Plaza Project.
2) Project location: Shuangqiao
3) Work content: Artificial masonry of retaining wall, including masonry, jointing, capping, settlement joint, drainage hole, etc.
2. Contracting method: contracting without contracting.
3. Contract unit price: The above engineering contents include the calculation of labor and materials of each party.
4. Calculation method:
Party B completes the calculation of actual workload. Due to the different heights of retaining walls, the masonry height is about 4-5 meters, the foundation bottom width is 2 meters, the height is 4 meters, and the top width is 0.6 meters. The length of masonry is about 25m, and the quantities are calculated according to the actual quantities.
5. Appropriation method: At the end of the project, Party B shall be paid 100% of the completed works.
6. Duration: 13 days.
7. Standards and norms
Meet the acceptance criteria according to the specification requirements.
8. Rights and obligations of both parties
1) Party A is responsible for coordinating the relationship among design, geological prospecting and supervision.
2) Party B must carry out the construction in accordance with relevant technical specifications to ensure the quality of the construction project. If the project quality is unqualified due to Party B's construction, all materials and other losses caused by rework and shutdown shall be borne by Party B. ..
3) During Party B's construction, Party A has the right to supervise and inspect the quality and safety issues of Party B's construction projects at any time. If there are serious quality and safety problems, after repeated requests, Party A still doesn't know how to rectify them. Party A has the right to ask to leave, and Party A will not bear all the expenses arising therefrom.
4) All personnel of Party B shall be managed by Party B, and all acts that violate national laws and regulations, such as fighting, alcoholism, theft, etc. Party A has nothing to do with the safety accidents caused by work during the construction period ... All losses and legal consequences arising therefrom shall be borne by Party B. ..
5) This contract has the same legal effect, and it is hoped that both parties will abide by it.
6) This contract shall come into force as of the date of signing. After the retaining wall is completed and accepted, the project payment will automatically become invalid.
Representative of Party A:
Representative of Party B:
Year month day:
Wall-building project contract 4
Party A: Party B: In order to complete the fence project under this contract on time with good quality and quantity, and to clarify the rights and obligations of both parties, Party A and Party B sign this agreement through consultation.
Article 1 Cooperation matters
_ _ Avenue fence engineering construction.
Article 2 Method of Contract
Party B shall ensure the project quality, contract period and safe and civilized production, strictly implement the safety production and construction specifications, and bear the safety casualties. Party A shall send relevant personnel to supervise Party B and cooperate with measurement and technical disclosure.
Article 3 Contents of the Contract
1. Party B is responsible for the contents of this fence project: safety maintenance, foundation excavation, concrete pouring, wall building, painting, brick laying, embedded pipelines, iron parts, etc. (The construction area involving broken concrete shall be settled according to the facts in 2 yuan ㎡).
2. All machinery and construction equipment required for the project shall be solved by Party B itself.
Article 4 Quality Standards Party B must carry out the construction according to the drawings and relevant specifications and standards; The quality of the project meets the acceptance criteria of the acceptance specification.
Article 5 The project price of the fence project is 140 yuan, and the length shall be subject to the actual measurement (the final accounts shall be subject to the actual increase in engineering quantity). According to the completed project amount not less than that of 400 yuan, Party B will pay the project amount of 40,000 yuan as living expenses at the end of the year. After the acceptance of the remaining hospitality projects is completed, the construction unit will pay the project funds of the project department, and Party A will pay 90% of the project funds of Party B, of which 5% will be paid after the audit settlement of this project, and the remaining 5% will be paid as quality guarantee interest-free after _ _ _ _ _ _ _.
Article 6 Time limit for a project and the rights and responsibilities of both parties
6. 1 The installation time is _ _ _ calendar days according to the progress of both parties. The start time of the construction period is _ _ _ _ _ _ _ _ _ (subject to the written notice of Party A). Extension of construction period: the demolition of the construction unit has not been completed, so the construction cannot be carried out; Because the material supply of our project department is not in place; The extension time of the construction period shall be subject to the signature of the project department.
6.2 Party A is responsible for providing the following conditions for Party B's construction: water and electricity connection points required for construction.
6.3 Party B shall organize the construction according to the site requirements. During the construction period, Party B shall abide by the construction site management regulations and construction operation procedures, and assume the safety responsibility during the construction period. In the event of a safety accident, all responsibilities shall be borne by Party B, not by Party A. ..
6.4 Before construction, Party B shall carefully check whether the construction setting-out pile points meet the requirements, and report the problems to Party A in time.
6.5 Party B's warranty responsibility for the quality problems of construction projects is _ _ _ _ _ _ _. In case of maintenance problems during the warranty period, Party B shall carry out maintenance within 24 hours after receiving the notice until it meets the quality requirements. At the same time, Party B must take full responsibility for the adverse consequences caused by the problems in the construction.
6.6 Party B shall provide maintenance services for this project. In case of maintenance problems not caused by Party B, Party B shall provide services to Party A at preferential prices.
Article 7 Liability for breach of contract Where Party B delays the completion of the project, it shall pay liquidated damages to Party A at the rate of 2% of the delayed project price.
Article 8 Dispute Settlement, Contract Text and Entry into Force Disputes arising from this contract shall be settled by both parties through consultation. If negotiation fails, apply to Hefei Arbitration Commission for arbitration. This contract is made in duplicate, one for each party, and shall come into effect as of the date of signature. Signature of Party A's representative: signature of Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Wall-building project contract 5
Employer: Tourism Development Co., Ltd. (hereinafter referred to as Party A)
Contractor: _ _ _ _ _ _ (hereinafter referred to as Party B)
In order to clarify the rights, obligations and responsibilities of both parties in the whole construction process, encourage both parties to create conditions for each other and cooperate closely to ensure the civilized construction of the construction project, and complete it safely in accordance with the Contract Law and the Construction Law, and both parties have reached an agreement through consultation. Signing this contract: I hope both parties will abide by it and not violate it.
I. Project name:
Second, the project site selection:
Three. Scope of contract
1 42# building overhead wall, such as planting steel bars, laying bricks, hanging fiber mesh, plastering internal and external walls, etc. The specific scope shall be stipulated by Party A. The construction shall be carried out according to the design drawings or change notice provided by Party A, and the engineering quantity shall be calculated according to the actual construction.
2, work content:
(1) Brick masonry: all the processes of brick masonry, such as building walls, setting out, drilling, installing Rachel bars, painting interface agent, precast reinforced concrete lintels for doors and windows, precast concrete blocks beside doors and windows, pouring secondary scattered concrete components for transportation, masonry, maintenance, scaffolding and cleaning.
(2) Interior wall plastering, fiber mesh plastering, interface agent brushing, steel bar washing (cake), door and window plastering, watering, repairing, transporting required materials, scaffolding and cleaning.
(3) Exterior wall plastering and bricklaying: all the processes of interior wall plastering, such as pasting fiber mesh, cleaning basic sanitation, brushing interface agent, punching holes (cakes), setting out, plastering doors and windows, springing lines, making waterlines, drip line, repairing holes, transporting auxiliary materials, and erecting clean and sanitary scaffolding.
Fourth, the way of contracting.
(1) Comprehensive unit price contract of contracted materials: including main materials, labor, contracted tools (small mechanical tools, hopper cars, mixers, cables, final electrical boxes, tungsten lamps, wires, electric drills, water pipes, red lines, ink, Mo Dou, dust shovels, etc. ), taxes, daily necessities, management fees.
(2) All-in price of comprehensive unit price of each subdivisional work:
Serial number Project name Comprehensive unit price Unit quantity Comprehensive unit price
1 masonry 120 wall, including scaffold m2.
2 masonry 180 wall, including scaffold m2.
3 bar planting φ6 pieces.
4 interior wall plastering (including net hanging, slurry throwing and scaffolding) m2
5 Exterior wall plastering (including net hanging, slurry throwing and scaffolding) m2
6-piece pipe well strip
7 Precast lintel (including system safety)
8 expansion joint closure m
subtotal
(During the construction period, Party B shall not ask Party A to raise the price for any reason. If this happens, Party A has the right to refuse to pay the project payment. )
(3) The settlement unit price includes all expenses, including construction mortar machine, mixer, corresponding distribution box (final box) and cables (only the main distribution box is provided by Party A), lighting wires, light bulbs, ash hoppers, shovels, buckets and water pipes. Materials, raincoats, rain boots, gloves, helmets, safety belts, masks and comprehensive labor protection articles, different conditions, weather changes, rising prices, rising wages and other safety risk expenses.
5. The budgeted price of this contract is RMB, in words.
Sixth, the construction period
1. Commencement date: (subject to Party A's notice).
2, the total duration:
3. In case of force majeure, the contract period shall be postponed:
Seven. Payment terms:
7. 1 After signing this contract, Party B shall organize machinery, materials and personnel to enter the site for construction within three days, and pay 30% of the contract cost within seven days;
7.2. Before 25th of each month, Party B shall submit the progress to Party A for review according to the actual construction situation, and Party A shall pay the progress payment according to 80% of the review progress (the advance payment shall be deducted in proportion);
7.3. After the project is accepted and the settlement is completed, Party A shall pay 95% of the settlement fee.
7.4. Party A reserves 5% of the project settlement amount as the project quality warranty fund, and the project warranty period under this contract is one year from the date of project completion. After the project warranty expires, if there is no quality problem, Party A shall pay the warranty money to Party B without interest within 30 days after the warranty expires. During the warranty period, if there is any quality problem, Party B shall be present for maintenance within two working days from the date of Party A's notice. If it is not repaired in time, Party A will make other arrangements, and the expenses will be deducted from the warranty fund, and Party B shall have no objection.
7.5. Party B shall pay 8‰ of the total settlement fee, and the fee shall be deducted from the settlement.
7.6 Before Party A pays the project payment, Party B shall provide legal and valid bills in full.
Eight. Responsibility of both parties
7. 1 Party A
1) Pay the contract price to Party B as agreed in the contract.
2) Organize, guide, supervise and inspect the quality, progress, safety and civilized construction of Party B; Coordinate possible contradictions and disputes with other construction units during construction.
3) provide water and electricity connection points; The material stacking area and temporary residence of construction personnel in this site are required by Party B and approved by Party A. ..
7.2 Party B
1) During the construction, strictly implement the safety construction operation specifications, current construction and acceptance specifications and quality standards, and complete the engineering tasks with good quality on schedule.
2) Properly protect or use other completed professional projects and equipment delivered by Party A; Before the completed project is delivered to Party A, Party B shall be responsible for the protection of the completed project and its finished products. If there is any damage, Party B shall be responsible for the repair and bear the expenses;
3) Party B shall not affect the construction progress of Party A and other units due to Party B's reasons, and shall be responsible for the protection of finished products of completed projects. After the completion of some projects, Party A shall be informed of acceptance in time according to relevant regulations. Otherwise, Party B shall bear the losses caused to Party A and the third party due to its own reasons.
4) Party B must accept the management of Party A and abide by the relevant rules and regulations of Party A; Obey the safety management of Party A and the site supervisor, provide lighting, fence facilities and warning signals needed in the construction process of the contracted project, and be responsible for the safety and security of the project construction site; Responsible for providing the construction tools and instruments needed for this project, and bear the expenses.
5) Party B shall be responsible for the safety work. If Party A or a third party suffers personal or property losses due to Party B's own reasons, Party B shall bear all the responsibilities. Party B shall be responsible for the safety of its employees. In case of any accident, Party B shall bear relevant responsibilities by itself.
6) During the execution of the contract, Party B shall strictly abide by the requirements of the government and industry on environmental protection, labor protection, safety production and other management regulations, and bear the responsibility of economic punishment for violating the regulations due to its own reasons. If economic losses are caused to Party A at the same time, Party A shall be fully compensated.
7) If a safety accident occurs during the use due to Party B's construction quality problems, the losses caused to Party A and the third party shall be borne by Party B..
8) Before signing this contract, Party B has made a detailed investigation on the construction conditions and approved them; Party B agrees not to ask Party A for any other expenses related to the contract unit price for any other reason.
9) Be responsible for paying the construction water and electricity charges, deducting 8‰ of the settlement price.
Nine, project quality, acceptance and protection
1. The quality of this project is agreed by both parties as: qualified; The quality of the project shall meet the requirements of the design drawings, agreed standards and quality objectives. If the instructions of Party A in the drawings are different or inconsistent with the national, provincial and municipal construction acceptance specifications and standards, Party B shall take the one with higher quality requirements as the construction basis after obtaining written approval.
2. Party B must organize the construction according to the national quality inspection standards, construction acceptance specifications and construction drawings. If any design errors are found during the construction, Party B must immediately submit them to Party A, and the construction can only be started after the negotiation procedure is changed.
3. Carry out the construction in strict accordance with the construction quality acceptance specifications and the company's quality requirements. During the construction of this project, Party B must ensure that all the project quality meets the qualified standards stipulated in the current construction quality acceptance specifications. If the quality is unqualified, Party B shall be responsible for rectification (or impose a fine according to Party A's regulations).
4. If the quality of various projects constructed by Party B does not meet the requirements of the acceptance specification, Party A has the right to order Party B to rework and compensate Party A for the loss of materials, or Party A shall designate another unit to deduct it at the time of settlement; If Party B does not actively cooperate and still fails to meet the requirements or affect the project progress after rectification, Party A has the right to terminate the agreement and order it to leave.
5. Party B must obey the construction command of Party A.. If you don't listen, you will be fined 100 yuan each time. During the construction process, Party B shall not coerce Party A into putting forward unreasonable conditions on this ground. Party A has the right to terminate the agreement, and Party B shall be responsible for the losses caused thereby.
6. Project warranty. After the project warranty expires, if there is no quality problem, Party A shall pay the warranty money to Party B without interest within 30 days after the warranty expires. If there are any quality problems during the warranty period, Party B shall be present for maintenance within two working days from the date of Party A's notice. If it is not repaired in time, Party A will make other arrangements and the expenses will be deducted from the warranty fund. Party B shall have no objection.
X. dispute resolution methods
All disputes arising from the execution of this contract shall be settled by both parties through friendly negotiation; If the negotiation fails to reach a satisfactory solution, either party may bring a lawsuit to the people's court where the project is located.
XI。 Other agreements
1. This contract is made in quadruplicate, with each party holding two copies.
2. For matters not covered in this contract, Party A and Party B shall sign a supplementary agreement on the basis of friendly cooperation, and the supplementary agreement shall take effect at the same time as this agreement.
3. This contract will take effect after it is signed and sealed, and the project completion acceptance will meet the requirements stipulated in the contract, and it will automatically become invalid after the balance is settled.
4. The construction party shall abide by national and local laws, regulations, policies and public security regulations, and shall not cause personal injury to Party A's personnel or loss of Party A's property by means of violence or threats, otherwise, the implementation party shall compensate all economic losses suffered by Party A and its personnel and compensate the injured party for 30% of the settlement price as liquidated damages. Party A shall send it to the local police station or court for handling according to the seriousness of the case (causing damage to articles and personal injury, etc.). ).
Party A (official seal): Party B (official seal):
Legal representative:
Authorized Agent: Authorized Agent:
Tel: Tel:
Bank of deposit:
Account number:
Date of signature: year month day.
Relevant clauses of wall engineering demonstration contract;
★ 3 copies of model contract for wall-building project.
★ The latest model contract for wall-building works.
★ 3 copies of contract model for wall plastering project.
★ Bricklaying construction contract
★ 6 Model construction project contract.
★ Wall building contract
★ 5 copies of model contract for rural self-built houses.
★ 3 copies of contract agreement for model project.
★ 3 Model clauses of construction contract
★ 3 latest models of bricklayer's contract.