Specific requirements for preventing waterlogging during the 2022 flood control period in Liaoyang County

1. All units should further strengthen the organization and leadership of production safety during the flood season and implement the production safety responsibility system. Comprehensively strengthen production safety management during the flood season, formulate safety production measures and emergency plans during the flood season, and immediately carry out flood and wind prevention safety production inspections on construction sites and temporary facilities. Enhance the awareness of preventing natural disasters such as floods, landslides, and debris flows, and effectively implement safety production management during the flood season to ensure a safe flood season.

2. Pay close attention to the weather forecast from the meteorological department and do a good job in flood prevention.

3. In view of the accident-prone characteristics of the flood season and combined with the actual situation of the respective construction projects, formulate practical preventive measures, organize self-examination immediately, and completely eliminate safety hazards. In particular, strengthen the deep foundation pits of construction projects ( High slopes), external scaffolding, and safety management of large construction machinery, and comprehensively strengthen construction safety production management during flood seasons.

4. Strengthen the management of high-altitude operations at the construction site, avoid climbing, hanging and other types of high-altitude operations during heavy rains and strong winds to ensure the safety of construction personnel.

5. Strengthen the management of construction site walls and temporary facilities. Temporary facilities built under hillsides, beside ponds and under retaining walls, as well as unstable work sheds, must be evacuated immediately to prevent the temporary facilities from being toppled or collapsed in the event of a landslide, causing casualties.

6. Immediately inspect and maintain the drainage system at the construction site and surrounding areas to ensure smooth drainage. Carefully check the lightning protection and repeated grounding measures at the construction site to avoid lightning strikes, leakage, and electric shock accidents.