Measures for the Prevention and Control of Dust Pollution in the Construction Site of Shijiazhuang City (revised 20 10)
Housing construction project refers to all kinds of housing construction and its accessories and supporting lines, pipelines, equipment installation projects and indoor and outdoor decoration projects.
Municipal public infrastructure projects refer to civil engineering, pipeline and equipment installation projects of urban roads, public transportation, water supply, drainage, gas, heat, gardens, sanitation, sewage treatment, garbage disposal, flood control, underground public facilities and their ancillary facilities.
These Measures are applicable to the prevention and control of dust pollution in the reconstruction and expansion of municipal public infrastructure projects and the demolition of buildings and structures. Article 4 The prevention and control of dust pollution on the construction site of a construction project shall adhere to the principles of unified management, scientific standardization, prevention first, and safety and order. Article 5 The municipal environmental protection administrative department shall exercise unified supervision and management over the prevention and control of air pollution in this Municipality. The municipal construction administrative department is responsible for the supervision and management of the prevention and control of dust pollution on the construction site of this Municipality, and the Municipal Construction Management Office is responsible for the daily management of the prevention and control of dust pollution on the construction site of urban construction projects.
Development and reform, planning, urban management, public security traffic control, finance and other relevant departments shall, according to their respective functions and duties, do a good job in the prevention and control of dust pollution on the construction site of construction projects.
The people's governments of Luquan City, Gaocheng City, Zhengding County and Luancheng County shall strengthen their leadership in the prevention and control of dust pollution on the construction site of construction projects within their respective jurisdictions, and their construction administrative departments shall be responsible for the prevention and control of dust pollution on the construction site of construction projects within their respective jurisdictions. Sixth environmental protection, planning, construction, urban management and other relevant departments should establish a construction project construction site dust pollution prevention and control information system, maintain information exchange, and promote coordination and linkage. Seventh construction projects in urban areas prohibit on-site mixing of concrete and mortar. Eighth construction units in the construction site dust pollution prevention and control work to undertake the following responsibilities:
(a) the tender documents shall specify the target requirements and bid evaluation scores of dust pollution prevention and control, and the construction contract shall specify the responsibility of the construction unit for dust pollution prevention and control;
(2) The special expenses for the prevention and control of dust pollution on the construction site of the construction project shall be included in the project budget and paid to the construction unit in full within 15 days from the date of commencement of the project;
(three) responsible for the prevention and control of dust pollution in the construction site, the construction site and the construction site directly contracted by the state;
(four) responsible for the prevention and control of dust pollution in the construction site where the construction permit is not handled according to the regulations;
(five) after the completion of the demolition, the site should be set up within 5 days of hard enclosure. Ninth construction units shall bear the following responsibilities in the prevention and control of dust pollution on the construction site:
(a) the bid documents should have the implementation plan of dust pollution prevention and control. The contents of the implementation plan include: dust prevention and control objectives, special dust prevention and control technical measures for different construction technologies of various sub-projects, responsible units and persons.
(2) The general contractor and subcontractors shall establish the responsibility system for dust pollution prevention and control respectively, and the general contractor shall take overall responsibility for dust prevention and control at the construction site of the construction project;
(three) the construction work should abide by the technical operation rules and implement various technical measures to prevent and control dust pollution;
(four) in case of windy weather forecast or air quality warning issued by the municipal government, earthwork and demolition operations shall not be carried out. Article 10 The construction site of a construction project shall meet the following requirements:
(a) should set up a stable and tidy enclosure, enclosure height of not less than 65438 0.8 meters;
(two) the dust pollution prevention plan should be publicized in a prominent position, from the beginning of the publicity period to the end of the project construction, and the publicity content should be clear and complete;
(three) according to the general layout of the construction, the work area, living area and office area are divided, and the building materials are stacked in categories and signs are set up;
(4) On-site mixing should be closed; Building materials such as cement and lime powder are stored in the warehouse or tightly covered; Bulk materials such as sand, stone and earthwork must be covered; Materials loaded, unloaded and moved on site shall be covered, sealed or sprinkled with water, and shall not be scattered in the air;
(five) construction waste centralized stacking, classified stacking, tight coverage, timely removal; Domestic garbage is produced and cleaned daily in a closed container; The construction site shall not contain toxic and harmful substances such as molten asphalt and burning garbage;
(six) garbage removal should go through the relevant formalities in advance or entrust a transportation unit with garbage transportation qualification, and it is not allowed to dump garbage;
(seven) the field capacity is clean and tidy, and it is clear after work. Eleventh housing construction site shall meet the following requirements in addition to the provisions of Article 10 of these measures:
(a) in the main road enclosure height of not less than 2.5 meters, stable and clean;
(2) The outside of the main body of the construction project is closed with a dense mesh safety net that meets the requirements. The dense mesh safety net shall be kept clean, firm and undamaged, and it is forbidden to throw wastes from the air;
(3) The entrances and exits are set reasonably, and the concrete is hardened; Set up car washing facilities to keep the vehicles clean;
(4) The construction area is more than 8,000 square meters (inclusive) or the construction period is more than 1 year, and the roads and workplaces on the construction site are hardened with concrete; Unit projects with a construction area of less than 8,000 square meters or a construction period of less than 1 year can be hardened by laying gravel on the construction site;
(five) set up a reasonable drainage system and sedimentation tank to keep the drainage unblocked, and the sewage shall not be discharged into the urban pipe network without treatment.