China Naming Network - Feng Shui knowledge< - How much is the half-package decoration of the blank house?

How much is the half-package decoration of the blank house?

Rough houses mainly refer to those houses that are not decorated. Blank houses are common commercial houses. Most commercial houses are sold in the form of rough houses when they are sold, and need to be renovated later after purchase. How much is the decoration price of rough house? The decoration of rough houses can be divided into ordinary decoration and luxury decoration. Most people will choose ordinary decoration, so what is the approximate price of ordinary decoration? Let's take a look at how the rough house is decorated and what the price is.

First, how to decorate the blank house

(a) tools in place, ready.

Before decorating, you must prepare a few things and put them in your bag. 5M tape measure, calculator, big board clamp (for bills and receipts), old towel (one soft cotton, for wiping after sticking bricks), and plastic bag (wrapped around the pipe joint to prevent dirt from blocking).

(2) Choose a good day.

Before the workers enter the site, they should personally measure the corner of the house, write it down with a pen ruler and mark it clearly. Don't be lazy. The contents of the measurement mainly include:

1. Define the areas involved in the renovation process. It is tile area, wall paint area, wallpaper area and floor area;

2, clear the bearing wall size. It is the wall size that needs to be designed for furniture in the future.

(three) the main body is removed or changed.

The demolition and reconstruction of the main body is the first project, which mainly includes wall demolition, wall building, wall skin, heating, plastic steel windows and so on. Remove the garbage in time to ensure the cleanliness of the room, but also for the convenience of construction.

At this point, it's time to set up the finished door, and then browse the cabinets, range hoods, cookers and water heaters, and make sure.

(d) Hydropower transformation, and arrange the use of each space.

Hydropower transformation, no regret medicine to eat. Bricks are stuck on the wall and the ceiling is sealed, so it is difficult to add another socket. So be sure to locate the switches, lights, basins, bathtubs, washing machines and so on.

Before the hydropower transformation, the cabinet designer should take measurements at home to help you determine the transformation scheme of power supply and waterway. It's best to send someone to design the position of power supply and interface according to the model you have determined.

Air conditioning holes and power supply should be placed on the wall of the bedside as far as possible to avoid air conditioning blowing directly at people in the future. Keep a distance of 20 cm between the strong and weak points, such as a distance of 20 cm between the socket and the network cable.

(5) abalone

Considering the humid environment of kitchen and bathroom, wooden keel must not be used as the material of riser! Everyone must be careful, even if the wooden keel is painted with antirust paint.

Remember, the vertical pipe is made of light steel keel or red brick. Light steel keel saves space, but red brick is strong and easy to use.

At this time, you need to buy tiles, jointing agents and so on. Furniture should be set in advance, and the construction period should be kept well, generally at least 15 days.

(6) Tiling

Buy a floor drain before sticking bricks.

Note: buy a special washing machine or shower floor drain to deodorize.

After waterproof napping, we are ready to stick bricks.

In addition to the normal precautions for sticking tiles, the tiles are soaked in water and dried in the shade; In addition to cutting broken tiles, I personally emphasize the overall beauty of tiling. Simply put, the width of the brick on the wall should not be less than 10 cm. This often happens when sticking bricks. For example, the wall width is 1 m, the brick is 32*32cm, and the normal pasting method is 3 whole 1. But 32×3=96, to reserve 1 cm tick-off space, the remaining small bricks can only be pasted 3cm wide.

As long as you make it clear to the bricklayer in advance, the width of the brick on the wall should not be less than 10 cm. He can cut bricks on both sides. Let's take a wall just 1 meter wide as an example, and it becomes 2 whole and 2 small. 32×2=64, reserved 1 cm for jointing, and the small bricks on both sides are 17.5cm, so that it looks not only symmetrical on both sides, but also the whole wall will not be narrow there.

(7) Oil workers go into battle.

If you don't buy a finished door, let the worker master do it.

Note: Any carpentry work, even if it is just a pass, must follow this step, the big core board sinks to the bottom, and the veneer is painted again. When mixing oil, it is absolutely wrong to let those lazy and irresponsible workers brush oil directly on the big core board. Don't believe the story of selling big core boards. It is no problem to brush oil directly on them. Remember, brush the oil directly, and it won't take long for it to crack completely, remember to remember.

(8) Wallpapers

Wallpaper is much better than wall painting.

After the wall paint is painted, the oil trade union paints nitrocellulose paint where wallpaper needs to be pasted. The paint can be dried thoroughly the next day, and then the master is invited to paste the wallpaper.

Note: Do not open the window for ventilation within 48 hours after the wallpaper is pasted, and let it dry slowly in the shade. Tell the master that if something gets stuck, you should ask him to help repair it.

At this time, it is time to buy panels, sockets and lamps.

(9) Install the socket panel

The socket panel can be installed in about half a day.

1, the socket with switch function is easy to buy, especially in the kitchen, you can control the rice cooker and microwave oven without plugging in the power supply.

2. Although the socket with switch is good, we should pay attention to practicality. According to my observation, all three sockets of the five-hole power supply with switch are flat. Once your electrical appliance needs three round sockets, there will be the depression of using plug-in boards when the sockets are empty. Therefore, multi-purpose sockets must be used, even if it has no switch control!

Second, the price (price source network, for reference only)

1, renovation price of rough house

400 yuan/square meter or so, but the decoration prices of rough houses in different regions are different. The decoration price of blank houses also varies according to the design and materials.

2, rough house decoration price quotation

Wall surface: grassroots treatment, estimated 3 yuan per square meter; High-grade paint for wall surface, 27 yuan per square meter; 82 1 putty and ordinary paint, per square meter 18 yuan. Ground: leveled, about per square meter 10 yuan.

Floor tile, about 95 yuan per square meter (including skirting line, 600*600 ordinary seiko vitrified brick, with 325.5 ordinary cement, white cement, medium sand, 108 glue and jointing agent as auxiliary materials);

3. Floor, reinforced floor is about 85 yuan per square meter. Ceiling: aluminum gusset plate per square meter 1.0 85 yuan, edge strip per meter 10 yuan; 50 yuan per square meter of plastic-steel plate, and edge strip per meter 10 yuan;

4, wooden keel gypsum board flat top per square meter in meijw.com, 80 yuan; Light steel keel gypsum board flat top per square meter 100 yuan; Wooden keel gypsum board ceiling with linear modeling 100 yuan per square meter; Wooden keel gypsum board arc ceiling 130 yuan per square meter; Wooden keel gypsum board lamp pool modeling ceiling 150 yuan per square meter.

5. Doors and windows: composite solid wood, each set is about 1 100 yuan (including door covers, parliaments locks, thickened hinges and door suction);

Paint-free doors, each set is about 950 yuan (including door cover, parliaments lock, thickened hinge and door suction); Solid wood doors, each set is about 1600 yuan (including door cover, parliaments lock, thickened hinges and door suction); Steel wooden doors, each set is about 850 yuan (including door cover, parliaments lock, thickened hinges and door suction); Magnesium-aluminum alloy push and pull, 2 10 yuan per square meter; Pack flat doors, about each 420 yuan; Newly made flat doors, around each 450 yuan.

Do you know how rough houses are decorated now? The decoration of rough houses is mainly related to the design and decoration of decoration companies. Blank houses can also purchase their own materials for decoration, but it will be more difficult and time-consuming. Therefore, friends who want to decorate rough houses had better invite some professional masters or decoration design companies. The decoration price of rough houses also needs to be defined according to the difference of materials and design. The general price is around 12 thousand, and the decoration price of rough houses with different house areas is different.