How to calculate the lag time?
Watch the time. Look at the notice time stipulated in the contract, that is, according to Jin Kang 94 submitted before 12, counting from 13 in the afternoon, or counting from 6: 00 the next day after 13. The turnaround time is also specified as the notification time, that is, the calculation of how many hours of loading and unloading time/loading and unloading time is input after NOR submission.
Deduct time. According to Jin Kang 94, the sailing time from anchorage to berth, port entry time, draught making and berthing shifting time are not included in the loading and unloading time.
weather If the contract is PWWD, that is, weather working days, if the loading and unloading time is used up after the calculation starts, but the loading and unloading is still not done, it is demurrage time. If the loading and unloading time is not used up, the bad weather that affects the berthing operation should be deducted, which is not the loading and unloading time. After entering demurrage time, bad weather cannot be deducted.
Deadline. The deadline is the time when the goods are completed. However, if the FIOST clause is signed, the liquidation also belongs to the operation time, and the closing time is the deadline.
To sum up, you must provide a complete NOR, SOF and some stipulations in the contract, that is, the NOR submission method, the terms of notification time and the loading and unloading terms are FIOST/FILO/FLT, before you can calculate the demurrage time.