China Naming Network - Feng Shui knowledge< - Understand the detailed construction steps or processes of artificial turf.

Understand the detailed construction steps or processes of artificial turf.

Guangdong fengneng environmental protection technology co., ltd

Guangdong Fengneng Environmental Protection Technology Co., Ltd.-Company Profile:

Guangdong Fengneng Environmental Protection Technology Co., Ltd. is a Guangdong environmental protection rubber manufacturer integrating R&D, production, sales and construction.

Main products: EPDM colored rubber particles, plastic racetracks, acrylic PU stadiums, artificial lawns and other rubber products.

Guangdong Fengneng Environmental Protection-Artificial Lawn Product Classification;

Our company's sports venues are divided into the following types: S-type monofilament grass, olive-type monofilament grass, U-type four-color leisure grass with stems, W-type four-color leisure grass, mesh leisure grass and arc mesh grass.

However, the construction scheme of artificial turf varies with different types, so today, the article mainly introduces the detailed construction scheme, technological process and method steps of artificial turf in Guangdong.

Guangdong fengneng environmental protection technology co., ltd

Guangdong is rich in energy and environmental protectionBasic practice of artificial turf;

Artificial turf was born in the United States in the 1960s. It is a quasi-lawn made of inanimate plastic chemical fiber products by artificial methods. Different from the natural lawn, it does not need to consume fertilizer, water and other resources necessary for growth, can meet the needs of 24-hour high-intensity exercise, has simple maintenance, rapid drainage and excellent site flatness. Artificial turf is widely used as a special field for hockey, baseball and rugby, a public driving range for football, tennis and golf, or as a ground pavement to beautify the indoor environment.

Artificial turf is not affected by climate, which improves the use efficiency of the site. Moreover, the artificial lawn has no dormancy period, and the seasons are evergreen, giving people a feeling of spring-like seasons. Good elasticity and traction make artificial grass an ideal material widely used in various sports venues. It is recognized by many world-class athletes as one of the best ground materials to reduce the injury of the foot and knee, and is widely used in football fields, tennis courts, gateball courts, basketball courts, runways, golf courses and other sports venues.

Construction technology and steps of artificial lawn:

1, foundation engineering inspection and acceptance:

Remove sundries from the foundation. If there is any unevenness, it should be repaired in time. The construction site must be clean to ensure clean environment and construction quality.

2, measurement and lofting:

Measure and set out according to the design drawing. Use theodolite or other precise measuring instruments to measure whether the surrounding facilities conform to the size of the sports field. If there is anything wrong, it should be corrected immediately, and the allowable error is 5 mm

Paving: Pave the turf on the ground according to the original specifications, and the turf should overlap by 3~8? Millimeter.

Cut the overlapping turf evenly with a lawn mower. The joint should not exceed 3mm. Spread a rag under the cutting area and brush the adhesive on the bonding surface with a glue applicator. When the fingers are dry, they stick together and knock hard.

3, turf bonding construction process description:

The bottom surface of the turf and interface cloth to be bonded should be clean, and the surface should be dry and free of moisture.

Environmental temperature should be above 5℃ before construction, which is not suitable for construction in rainy and moldy weather, otherwise it will lead to long bonding time or even non-adhesion.

4, the specific construction process:

Glue coating: it is required to apply glue evenly on the surface with a glue applicator, and repeated glue coating is not allowed, otherwise it will blister or even fall off. Use a glue dispenser for the base fabric, strictly control the thickness of glue, and pay attention to the appropriate gluing speed. When gluing, it should be coated on two bonding surfaces respectively.

Adhesion: according to the actual influence of temperature, humidity, air pressure and other conditions at that time, the air drying time is reasonably controlled. Generally, when it is 890% dry within 10-30 minutes after gluing, it is advisable to touch the glue without sticking hands. When bonding, it is required to align the bonding once, and it is forbidden to move the bonded object back and forth after bonding.

Pressurization: after re-bonding, remove the impurities on its surface, and hammer it from the bonding place to both sides with a special rubber hammer to make its surface fully contact and compact, so that the bonding is more firm.

Maintenance: the maintenance time is generally three days, and the final strength is generally ten days. Care should be taken during curing to avoid sun exposure, water immersion and movement, which has reached the best bonding state.

After bonding, before laying quartz sand and rubber particles, it is necessary to clean the turf cutting debris of the site with imported cleaning agent.

Advantages of Guangdong Fengneng environmental protection technology artificial lawn;

All-weather: the artificial lawn is not affected by climate, which improves the use efficiency of the site;

Evergreen: after natural grass goes into dormancy, artificial grass can still bring you the feeling of spring;

Environmental protection: the materials meet the requirements of environmental protection, and the surface of artificial lawn can be recycled;

Simulation: Artificial grass is made by bionics principle, with good elasticity and comfortable feet.

Durability: durable, not easy to fade, especially suitable for high-frequency venues;

Economy: long service life and low maintenance cost;

Maintenance-free: there is basically no maintenance cost for artificial grass, just need to prevent man-made damage;

Simple construction: artificial grass can be laid on asphalt, cement, hard sand and other sites.

Guangdong fengneng environmental protection-a project example of the company;

(Dongguan Hengli Dong Hao School)

(Guangzhou Dongfei Middle School)

Summary:

The above is my introduction to the construction technology and methods of Guangdong Hard Acrylic Stadium.

For more information and product information, please click on the links of "General Product Information" and "Detailed Product Description" below to browse.

Here, all colleagues of Guangdong Fengneng Environmental Protection Technology Co., Ltd. wish you a happy life!

Product public information: product public information

Product introduction: product introduction