The 20-year history of European smallpox in Europe
1988
Company founder: Lin Qiang purchased one thousand square meters of land
The Luoxi Bridge had just been completed, and the company founder: Lin Qiang, in Guangzhou Purchased 1,000 square meters of land beside National Road 105 in Dashi, Panyu.
1989
The original Huasheng Hardware Factory
A simple factory was built and named Huasheng Hardware Factory. The company mainly produces zinc iron plates and aluminum corrugated tiles
In 1990
Established its own machinery workshop
Huasheng established its own machinery workshop, produced the first batch of wave tile production machinery, and developed the first batch of export mold production Shan
In 1991
Became the earliest manufacturer to produce aluminum ceilings
Huasheng developed the first batch of aluminum gusset machines, and the company became the first manufacturer to produce aluminum ceilings One of the manufacturers
In 1992
Became the largest aluminum plate purchaser and the largest ceiling semi-finished product supplier
The company became the largest aluminum plate purchaser of Guangzhou Zinc Flake Factory. And became the largest supplier of semi-finished ceiling products in the industry. The company has purchased another 3,000 square meters of land for expansion! Became the largest ceiling manufacturer in the industry at that time,
In 1993
Became one of the earliest manufacturers of punched sound-absorbing ceilings in the industry
The company developed the first batch of punched holes mold, becoming one of the earliest manufacturers in the industry to produce punched sound-absorbing ceilings
In 1994
Becoming a manufacturer that “does not punch holes” in the industry
The company purchased 300-ton giant one-time punching machinery, and more than ten 160-ton and 100-ton punching machines, becoming a "no-hole punching" manufacturer in the industry. The company also purchased and expanded the factory building by 10,000 square meters.
In 1995
The company established its first spraying line
The company’s first spraying line was established, becoming the first manufacturer at that time to go from coil material procurement to spraying Finished product manufacturer "one-stop" production enterprise.
In 1996
Became one of the largest trading agents in the South China sector of the aluminum plate and aluminum nail industry
The company purchased another 30,000 yuan worth of land from Yingbin Avenue in Panyu, Guangzhou One square meter per square meter, the company proposes to the top ten aluminum plate yards in the country, provides free warehouses, and introduces competition in the aluminum plate industry in Guangdong!
In 1997
The company successfully registered its first brand "European" and purchased another 20,000 square meters of land to create "C-button products"
The company's registered brand "European" ”, established its own independent spraying factory, paint factory, and mechanical mold factory. The company has moved its new factory to its new address on Yingbin Road!
In 1998
The company successfully pioneered the "C-button product"
Invested eight million to establish the top ten sales warehouses in coastal cities - the network in the industry at that time One of the largest manufacturers with the highest sales volume. The first "C buckle" replaced the old bar buckle and became popular all over the country.
In 1999
The company established a special-shaped plate factory
The company established a special-shaped plate factory and successfully produced aluminum veneer, black groove keel ceiling, octagonal ceiling, trapezoidal ceiling .
In 2000
The company purchased 20,000 square meters of land
The company invested another five million to set up a third production spray production line. A new German Wagner production equipment, covering an area of 6,000 square meters.
In 2001
The company was officially upgraded from Huasheng Hardware Factory and became Guangzhou Daguang Aluminum Decoration Materials Co., Ltd. with a registered capital of 13 million
The company became Guangzhou Zinc Sheet Factory is the largest purchaser of aluminum plates and has become the largest supplier of semi-finished ceiling products in the industry. The company purchased another land to expand the factory building by 3,000 square meters! Became the largest ceiling manufacturer in the industry at that time.
In 2002
Completed the Hong Kong Garrison Command Center project
The company invested 20 million to build a continuous casting and rolling aluminum coil production line. The company successfully completed the Hong Kong Garrison Headquarters project.
2003
Participated in the Shenzhen Municipal Government Civic Center and Shenzhen Metro projects
The company invested 5 million to purchase a Japanese Lanshi fluorocarbon production line.
In 2004
The company completed the new Baiyun Airport project and the new railway station project
The company invested 3 million to purchase a roller coating line production line
In 2005
Completed the Guangzhou New Railway Station East Station and New Railway Terminal Lobby Project
The company invested 3 million to purchase a drawing, frosting and printing production line.
In 2006
The company successfully won the bid for the Industrial and Commercial Bank of China system and the 200,000 square meter decoration project
The company's 20,000 square meter warehouse building was completed.
2007
Created a new era of precision ceilings
The company launched the European brand home decoration product series and established the "Continental UK" (London) Ramp in London, England. ;D R&D center and upgrade the national store system. The company successfully launched SAMA (super-precision handcrafted metal drawing) technology, promoted the reform of ceilings, created a new era of precision ceilings, and became the first manufacturer with "precision and fine" product patterns.
In 2008
The company re-planned and built a new 8-story office
The company invested 3.5 million to purchase a fully automatic roller coating that integrates frosting and roller coating. One birthday line, the maximum width of the coil can be 1.6 meters, and the maximum thickness can be 1.5mm. It focuses on engineering boards and purchased an anodizing production line at the same time.
2009
Participated in the Wuhan-Guangzhou Passenger Line Zhuzhou High-speed Railway Station and Taiyuan Wusu International Airport projects
The company invested 6 million to purchase a fully automatic frosted roll production line , with a total length of 135 meters, purchased three fully automatic frosted printing production lines
2010
The European Building was completed
The company invested 3 million to purchase 20 frosted engraving machines , undertook the project of Jiangsu Zhenjiang Railway Station of the Shanghai-Nanjing Intercity High-speed Railway, and won the bid for 10 subway project projects of Shenzhen Metro Line 5 3.3 package...