What are the precautions for the delivery of blank houses?
2, pay attention to check the quality of the door frame, window size. When checking the quality problems of these majors at the time of delivery, you can bring professionals with you for acceptance.
3, pay attention to check the supporting facilities. Check whether the water, electricity and other supporting facilities are in conformity with the contract and whether the pipelines are in good condition.
4. Pay attention to whether the house has a certificate. High-rise residential buildings and domestic water supply systems need water use certificates issued by relevant departments. Moreover, the fire protection system of high-rise residential buildings must have a certificate from the fire department. Pay attention to whether the documents are complete when delivering.
What are the benefits of buying a blank house?
1, low price.
Generally speaking, the unit price of a blank house with the same area is generally lower than that of a fully-installed house. In fact, this can really save a lot of money for financial managers who don't need decoration, and buying a house is also a good choice.
2. Diversified decoration.
Compared with the single style of full-installed houses, blank houses are more diversified. Because the decoration of rough houses can be personalized, and buyers can decorate according to their own preferences when handing over rough houses, including changing the pattern of houses and personalized decoration.
How to decorate the blank room?
1, tool preparation.
You must prepare these things for your bag before decorating. Tape measure (buy 5m), calculator, big board clamp; In addition, prepare old towels (soft cotton) and plastic bags (wrapped at the pipe joints to prevent dirt from blocking) in advance.
2. Choose a good date and get ready to shoot.
Finding a feng shui master to choose a good day to start shooting before the decoration is not only auspicious, but also reminds the decoration company to officially start the decoration.
3. Measure the indoor area.
Before the workers enter the site, measure every corner in advance, write it down with notes and mark it clearly. The measurement contents include: tile area, wall paint painting area, floor and wallpaper paving area, especially the wall where furniture is placed.
4. The main body has been dismantled and changed.
In the process of home improvement, the main demolition is an essential one. Including tearing down walls, building walls, shoveling walls and so on. Pay attention to the timely disposal of garbage to ensure the cleanliness of the construction site. What I want to remind you here is: set the finished product door in advance, because the delivery cycle is long and it needs to be customized in advance.
5. Hydropower transformation.
Before the hydropower transformation, it is necessary to reserve the location of furniture and household appliances to facilitate the subsequent construction. If you don't plan ahead, it will bring inconvenience to your later life. Before the hydropower transformation, let the cabinet owner measure the size in advance and determine the power supply position and waterway direction. The wiring of water heaters and air conditioners should also be planned, especially the number of sockets must be sufficient. It is suggested that the distance between the socket and the network cable is 20_.
6. wallpaper.
Generally speaking, the effect of pasting wallpaper is better than painting. After the wall paint is painted, the painter will paint the position where the wallpaper is pasted, and the wallpaper can be pasted when it is dry. In fact, pasting wallpaper is not as dirty as expected, but it is actually a very clean job.
7. Install the socket.
When buying a socket, buy an electrical appliance with a switch function, especially the kitchen, and control it with a switch. In the installation of the socket, you can also start to buy the ceiling of the kitchen and bathroom.
8. Install cabinets and finished doors.
Installing cabinets is a complex project, which needs the cooperation of various brands. At this time, manufacturers of range hoods, cookers and sinks can be invited on the same day, and problems can be solved in time. The finished door is generally installed in this process. Because the finished door needs to be installed before the floor, and the steps of installing the door are complicated, the hardware of the door should be installed. If the floor is installed first, it is easy to bump.
9. Install hardware and floor.
It is suggested to install clothes hangers, lamps and toilets before installing the floor, which can effectively avoid the damage of the floor.
10, furniture and household appliances enter the site.
After the hard loading is completed, the next step is the furniture and home appliances entering the market. Before furniture and household appliances enter the site, prepare the following items in advance, such as disposable shoe covers, activated carbon, ladders, etc.