Personal summary report of measurement work
Summary report of investigation work 1
Woodworking survey, as a basic skill of this major, is a skill that we must master when studying civil engineering. In order to improve our surveying and mapping ability and better link practice with theory, the Urban Construction Department conducted a two-week engineering survey internship for us.
Our aim is to control the measurement in a small range. The instruments used are theodolite, level, ruler, tripod, etc. Thanks to the school for providing us with advanced total station, which makes the measurement more convenient. Through this measurement, we have consolidated and deepened the theoretical knowledge learned in class, mastered the operation of various instruments, and reached a certain level of proficiency. As an outdoor professional internship, we have gained experience to pave the way for entering the society in the future. More importantly, it has cultivated our spirit of being hardworking, independent, finding problems by ourselves and solving them through our own efforts, and improved our ability to calculate complex data. These things can't be learned in the usual class, but they are so basic and important that I have to think of the sentence that practice is the standard for testing truth.
Engineering survey, which is a complicated work, is far from enough by one person's strength, so through this internship, I thoroughly understand that measuring her is a team work. There are seven members in our * * * group, so we must give full play to everyone's strengths to make our work more efficient. As the group leader, I am responsible for arranging the tasks of each member, making daily work plans and keeping in touch with teachers. I think every student who passes the internship will be deeply impressed by this.
A quarrel between husband and wife and brothers is inevitable. Getting together every day, having different views and different practices will make everyone unhappy, but we can communicate and understand in time, forget our unhappiness and re-engage in new jobs. The purpose of arranging our internship in school is to enable every student to use the theoretical knowledge he has learned to actually operate the instrument, so we should learn from each other and ask if we don't understand, not to catch up with time and progress. Otherwise, even if the internship is over and the homework is finished, the school teachers' goals and expectations for us have dropped in the past two weeks.
In the process of measurement, we have achieved high accuracy, and every data has been tested. Without the previous verification, we will never do the next step. Let's give a simple example. Every time you measure the instrument, you should center and level it. On the surface, it is a simple job, but it must be accurate, accurate and accurate again. As long as the instrument moves a little, we will work again, otherwise it will cause data errors and affect the actual measurement results. There are some things that many people will ignore, so we must pay attention to them. There are several manhole covers on the road. What is the distance between them? The smaller things are, the more they can reflect the working attitude and ability of a team. Unity is strength. Every morning, we get up early and start a busy day. When we encounter problems, we will solve them together. When we make mistakes, we study, analyze the reasons and take pains to measure them repeatedly. With everyone, we are full of enthusiasm.
Looking back at the survey now, I think it is a unique landscape on campus. Running around with instruments on his back every day, he was affectionately called a professional technician by his classmates as soon as he came back. I want to make a very important point here. The days we measured were very cold, and it snowed two days ago. The measurement in the cold wind is really no ordinary pain, but since we chose this major, we have no possibility to shrink back and touch the cold instrument to carry out the measurement to the end. Surveying and mapping is a very hard profession, and you won't achieve anything without sweat and hardship! This internship also taught us a lot of lessons: misreading, misreading and miscalculation of a certain data brought us a lot of trouble, thus letting us know that we should be serious and have a rigorous attitude when doing anything. As the saying goes, "Attitude is everything". The unity of a group is also crucial, which is related to the progress of the whole group. Previously, due to the lack of tacit cooperation and reasonable division of labor in our group, the overall progress was greatly affected. Later, through intra-group communication, the above problems were completely solved. The progress of internship has been greatly improved, and the progress and effect have naturally improved.
I cherish this opportunity given to me by my school. There are not many such opportunities in college for a few years. If we don't seize every opportunity, we will regret it when we step into the society and work in the morning. Sometimes I can't understand the pictures I usually see. After the internship, it's easy for you to connect the physical objects with the drawings, so it's getting easier and easier to learn this major. In short, thanks to teachers and classmates, I will remember this unforgettable experience, which will always be one of the treasures in my life.
Summary report of measurement work II
The year 2020 will soon pass. In welcoming the new year, we sum up the past 2020. Since I joined the company, I have gained some experience in my new job. My attitude is very important in my work. Being passionate about work and keeping a sunny smile can bring people closer together. Positive thinking, peaceful mentality and sufficient motivation can promote progress and work smoothly.
In order to make myself have a new starting point in the new year's work, I keep summing up my studies! Thank you very much for your trust. Since 2020, under the care and criticism of the leaders, we have cooperated with all kinds of work and faithfully performed our duties in the position of foreman. The coexistence of hard work and tears also made me see my own shortcomings. At the same time, it also changed me a lot and thought a lot. These changes are all accumulated unconsciously. Those working days in the past were full of passion, tears and even struggles. With the guidance of old employees and the help of colleagues, I learned how to do my job well.
As a surveyor, I participated in the preliminary survey of GTC606 project. I spent the first few days with the nervousness and excitement of my first job, followed by various discomforts. Get up at 4 o'clock every morning, there is almost no rest time at noon, the hot weather of more than 40 degrees, the embarrassment of language communication and so on. This makes me very uncomfortable. Although I am psychologically prepared, when I really face these difficulties, I find that I think everything is too simple.
The following are my works in 2020:
First, topographic survey
It is the first time to come here to contact a pickup truck with GPS for topographic survey, which greatly improves the work efficiency. The four of us are divided into two groups, me and _ _ _ _ _, _ _ _ and _ _ _ _ _. We use a pickup truck to measure in a flat place, and when we encounter a feature, we will measure it by GPS alone and draw a sketch, so that when we return to the camp at night, we can import the data measured during the day into the computer and draw it in time. In this way, we carried out about 10 days, and with the efforts of 14 hours every day, the topographic survey finally ended.
Second, the plane control measurement
We select the position of the control point on the map in advance, and then import the coordinates into GPS. One * * * is 263 control points. During the day, we set out with GPS, and then let the concrete be poured manually. After the control points are buried, we then carry out static measurement. We set two GPS as reference points at two known national control points, and then carry out static measurement at unknown control points. The observation time of each control point is 40 minutes. Sometimes, due to the influence of satellite ephemeris, the measured data has a large error and has to be reworked and re-measured. Finally, it took 27 days to complete the plane control survey of all the survey areas.
Third, the elevation control survey
In order to shorten the time of the preliminary work of the project, we didn't rest, followed by the second-class leveling of 78 kilometers. _ _ _ _ _ _ and I bring a 3-meter ruler, a tripod and instruments every day. In this way, we walked 8 kilometers every day and completed the elevation control survey in 1 1 day.
Four, geological exploration lofting and acceptance
The geological exploration work includes 24 geological boreholes and 42 geological exploration pits, and the related survey work mainly includes drawing the existing topographic profile, lofting and acceptance. Up to now, the acceptance of 17 geological drilling has been completed, and all 42 geological exploration pits have been completed.
Five, exploration pit (designed for proven underground facilities) lofting and acceptance.
There are 49 exploration pits in this part, and the related survey work is mainly lofting and acceptance. At present, pit 17 has been completed, and the remaining 33 pits are mainly natural gas pipelines and underground high-voltage lines, which can only be excavated after obtaining the excavation permit.
Other related work of intransitive verbs
Other related survey work includes site selection survey of employee camp, project storage area and repair shop. This survey is mainly for topographic survey and preparation for site leveling. As of February 8, 65438, the location of the project storage area and maintenance workshop has been basically determined. Statistically investigate the energy barriers in the region, and provide design basis for designers.
Summary report of investigation work 3
Students encounter all kinds of troubles in applying theoretical knowledge to practice, which not only exercises our ability to solve difficulties, but also condenses our ability to get something for nothing. More importantly, we have been sublimated spiritually and truly realized the hardships and difficulties of outdoor workers. Generally speaking, this week's engineering survey practice has made us gain a lot.
The content mainly includes plane control survey and elevation control survey.
The content mainly includes plane control survey, elevation control survey and tripod, and then we start the experiment. Step 2, measure the horizontal angle. Using DJ6 optical theodolite, the horizontal angle is measured by back measurement method. This work requires four people, two of whom set the benchmark, 1 personal record, 1 personal observation and operation of the instrument. First of all, we put the theodolite at point A, point B and point D respectively, and at the same time, the observer centers and levels the theodolite. Then aim the left target D with the left position of the dial, set the horizontal dial to read 0 00' 00 "and record it. Then rotate the aiming part clockwise to aim at the right target B, and read and record it. This is called the upper half measurement. Aiming and reading are very important. When aiming, first adjust the eyepiece aiming screw to make the crosshairs clear, and then aim at the target with the telescope door and sight. From the inside of the telescope, the target is imaged in the field of view of the telescope, that is, tighten the telescope brake screw and horizontal brake screw, rotate the objective lens aiming screw to make the target image clear and eliminate parallax, then rotate the telescope inching screw and horizontal inching screw to make the crosshair aim at the target accurately, and make the crosshair vertical wire aim at the target accurately and aim at the bottom of the target as much as possible. When reading, turn on the horizontal dial mirror, rotate the eyepiece of the reading microscope to make the reading clear, and then read the scale and minutes. After the first half of the retest, reverse the telescope to the right position, aim at the right target point B first and read, then turn the sighting department counterclockwise to aim at the left target point D and read, which is called the second half of the retest. The upper and lower test rounds are called test returns. Similarly, the same operation as point A is performed at three points of BCD, so I won't go into details here. During the experiment, the recorder should always check whether the difference between the back angles measured in the upper and lower parts is less than 40 "and whether the sum of the internal angles is the theoretical value. If one item does not meet the requirements, it is necessary to have a second interview.
Elevation control survey. For elevation control survey, it is not necessary to select points separately, but directly use the points of each traverse in the plane control network to form the corresponding elevation route shape according to the geometric shape of the original traverse. The instruments used in this work are level, spirit level and tripod. First, we fix the leveling staff at a certain point between AB and roughly level it, then set the staff at point A as the back view, and then aim at the leveling staff. This step is very important. General aiming leveling staff should follow the following steps: ① eyepiece focusing ② coarse aiming ③ objective focusing ④ checking to eliminate parallax ⑤ aiming at the target accurately. The last step is to read and make relevant records. Similarly, the forward reading of the front viewpoint can also be measured, and the elevation measurement on BC, CD and DA will not be described here. At the same time of measurement, the recorder roughly estimates whether the closing difference of the height difference of the leveling route meets the conditions, and weights it if it does not meet the conditions. In elevation survey, assumed height system is adopted. In this work, our group takes point A as the hypothetical point.
At first, I was not very skilled in the operation of theodolite. After many operations, I gradually don't need to use my eyes to find which part, but I can find that part immediately. After that, I must be familiar with the instruments used in advance when doing similar work, which will improve efficiency.
Summary report of investigation work 4
I. Introduction to study, work and training
I graduated from _ _ _ _ _ in July with a bachelor's degree in land resource management. Since _ _ _ _ _ _ _, I have worked in _ _ _ _ Technology Co., Ltd., engaged in land survey, mapping and planning management. In 20____, he obtained the qualification of planning engineer.
I actively participate in various continuing education and technical specification learning at work, mainly including the following contents:
The second national land survey training, learning CASS software, MAPGIS software, ARCGIS software training. _ _ _ _ software database construction training, _ _ _ software database construction training. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ In September, he served as the head of the company's surveying and mapping department, the manager of the company's branch, and the deputy chief engineer of the company. With the growth of time, my knowledge structure, professional quality, practical work ability and management ability have been greatly improved.
Second, the main work content and work performance
(a) land survey and mapping work
Cadastral surveying and mapping is the preliminary work of land property registration management, which is a professional, policy and high-precision work, and is related to the vital interests of the country, land property units and land owners. Therefore, land surveying and mapping must be standardized and accurate. As one of the important indicators to measure the land value, the accuracy, fairness and rationality of surveying and mapping results have become a sensitive issue among owners, and the attached responsibilities are getting bigger and bigger. Strict inspection and acceptance of surveying and mapping results, so that surveying and mapping results can legally, truly and effectively reflect the actual situation of land. Strictly check and review the land surveying and mapping area used for ownership registration, and ensure that the surveying and mapping results registered as land ownership meet the national standards.
(II) Technical management of the company
Since he was appointed as the company's deputy chief engineer in, he has been mainly responsible for file management and digitization in seven regions, including _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
(3) Making cadastral graphic maps
1. Cadastral graphic map system uses geographic information system (GIS) technology to manage and organize data, and takes aerial photogrammetry and survey control network data of various proportions as the source of cadastral map library, on this basis, it indexes and manages land-related attribute information. The system consists of land information database system and spatial query analysis function based on database system, which realizes the organic combination of graphics and attributes and can extract land attribute data conveniently and quickly. At the same time, it provides convenient and fast topographic map revision, real-time land data input and update, and flexible and convenient printing and output functions. By repairing and updating the system map, this work has realized the management mode of managing files by land, making land management more scientific, practical and convenient.
2. Main achievements: As a technical backbone, I have done a lot of land survey, mapping, technical management and planning for many years. _ _ _ _ _ _ _ _ _ _ _ _ The cadastral survey and database construction in Dongsheng District, the cadastral information system construction in Qipanjing Town, and the topographic mapping in Dongsheng and Zhu Rihe Town. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Since _ _ _ _ _ _, he has served as deputy chief engineer, responsible for the work of _ _ _ _ _ _ _ _ _.
3. In other aspects, I can actively and enthusiastically help my colleagues to solve the problems encountered in practical work, especially to give guidance to new colleagues so that they can adapt to their posts as soon as possible. I can accomplish all the tasks assigned to me by the leaders in a down-to-earth manner and perform my duties in strict accordance with the post responsibilities.
Three. Reasons for declaration
Years of professional work have made me the main technical backbone of the unit, and I can deal with related professional and technical problems in time. Through learning with an open mind and constantly discovering and solving problems, I gradually learned and mastered various error control measures of land surveying and mapping, and accumulated some experience. I feel that I have the conditions to declare the title of engineer, and I also hope to continue to learn and improve at a new starting point and platform.
Summary report of investigation work 5
20 19 is the first year of standardized and refined management in the head office. As a member of the company, we have the obligation to adapt to the company's development direction, be strict with ourselves in an all-round way, do our job conscientiously, forge ahead, be brave in practice and contribute to the company's development. The following is a summary of this year's work.
I. Overview of work
When we started to build a website, we first entered the website as the first people to enter the website. Started to be responsible for indoor accounting in the engineering department; Then the project department was established, and it was necessary to retest the original subgrade, so we were assigned to the quality inspection department to receive and retest the intersection points and sections. In this way, I started the survey work until the cushion team was established, and I was arranged to do the survey work in the cushion subgrade.
Second, the work content
As a new inspector, our work requires accuracy and carefulness. Find out the deviation of the original subgrade and your own mistakes in the work in time. Minimize this, because measurement and lofting are the first step of construction, and the subsequent steps can only be carried out after the measurement is completed. In order to provide theoretical data and first-hand information for later work. I studied hard when I first joined the company. Thanks to the help and guidance of the team leader and vice captain on the construction site, and we graduated together, I didn't make too many mistakes as a surveyor, even if some deviations were corrected in time, without causing losses to the project.
In engineering survey, I have just come into contact with the practical application of pavement survey, and it is still far from perfect. We should study harder in our future work. What we don't lack is the enthusiasm for learning. I want to raise my enthusiasm for work and study to the highest level and study hard. This is what I need most at present.
Third, study after work.
At the beginning, I didn't form active learning. Later, at the request of the group leader, I slowly learned the learning method of combining autonomous learning with indirect inquiry. Because there are many things on the construction site, it is impossible for the team leader to tell you every question over and over again, so I have to study actively and consciously. When I encounter problems, I should think more and do more. This not only solved the problem, but also improved it. Learning is not only a problem, but also an attitude. A correct attitude can get twice the result with half the effort when solving problems. Only in this way can we open our minds, have a positive attitude and think more about our work, so that we can make greater progress.
Four. Future work arrangements
As a grass-roots employee, it is also our duty to keep learning and making progress while trying to do our job well, and to cooperate with the work of various departments. What we do is the most basic and direct first-line construction work. Only with your heart can you create benefits and income for the company and yourself. With the development of the company, individuals can also develop. Therefore, the future of the individual is inseparable from the development of the company. Only by putting your heart and soul into your work and doing your job well can you make the best contribution to the company.
In our work, we should unite around the head office and grass-roots companies and act according to the rules and regulations of the company and the project, so that our work can be orderly and our team can be closer. Our work is not the work of one person or several people, but a large group composed of many grass-roots employees and middle managers. What is needed is that all departments and even everyone can coordinate with each other to complete large-scale engineering projects. The unity and cooperation of all departments can ensure the completion of the project with high quality and good price. What every department requires is that everyone involved should do their job well and make their department do its best. The successful completion of a large-scale project shows the importance of team spirit!
Through the comprehensive training of the head office on the quality, cost, materials, equipment and personnel management of all employees, it is also a unified standard, which makes the company unified from top to bottom and facilitates the management and cooperation of all departments. This is more convenient for the development of enterprises.
Articles related to the personal summary report of investigation work:
★ Survey Work Summary of Personal Work in 2020
★ Survey personal work summary model essay 2020 latest.
★ Excellent model essay on surveyor's work summary in 2020
★ Selected Samples of Surveying and Mapping Personal Work Summary in 2020
★ Measure personal work, summarize personal work and summarize excellent model essays.
★ Summary report on personal work of measurement technology
★ Essays on Annual Work Summary of Individual Surveyors.
★ Summary model essay on surveying and mapping personal work in 2020
★ Model essay on personal work summary of surveyor
★ Summary of Surveying and Mapping Personal Work