What do you need to decorate the kitchen?
2. The price of vegetable pots (single or double) ranges from 50- 1500. Faucets range from 100 to 1000.
3, cabinets range from 500-2000/ meter, even if it is expensive, the quality is similar, you don't care about choosing expensive. My cabinet is made to order: Tommy Tam metal panel, self-suction door, invisible handle, stainless steel countertop, Lushui River board, 800/m. Europa, this configuration is 4000/m. The basket is made of more than 200 stainless steel flat steel and more than 200 food shelves. Bright shelves are coated, not stainless steel.
4, floor drain mine is Wei Xing, 20/ piece.
5. The tile mine is 300*450, and the price is 6 yuan. A box of cement. Tiger joint1mm.
6. The gas stove I like is Gu Jia's, infrared, with more than 800. Maybe many people don't like it. You can choose something else. The range hood is prepared to be selected from Gujia/Chuanye 1400 or above, with touch side suction. The gas water heater is selected from Gujia/Xinfei, 12 liters or more 1600. After four days in the wholesale market, choosing these things is really a headache. All installations are free.
7. It seems that the labor cost is more than 30 /m2.
Question 2: What are the main points of kitchen decoration? Kitchen decoration should pay attention to the following aspects:
1. Determine the design of the cabinet functional area.
Including: the design and layout of operation desk, sink, range hood, electrical area, etc. This is not only conducive to the convenience of future use, but also conducive to the smooth progress of hydropower construction and transformation.
It is necessary to waterproof the ground before tiling the kitchen.
Many owners and builders will omit the waterproofing of the kitchen. In fact, it is very necessary to waterproof the kitchen floor, because the water pipes in the kitchen are basically hidden in the cupboard, so it is not easy to find water leakage. Water leakage will leak downstairs through the gas main and sewer main in the kitchen, causing damage to the ceiling of the cabinet downstairs.
3. It is recommended to use the socket panel with switch in the kitchen.
There will be a lot of kitchen appliances in the kitchen, so it is more troublesome to plug them in frequently. It will be convenient to use the panel with switch directly in the future.
4, kitchen tile shop is stuck should pay attention to the specifications.
Kitchen tiles should choose products with guaranteed quality, and standardized construction should be carried out during construction. After the shop is stuck, the quality of tile construction should be checked. The most important thing is that there can be no problems such as empty drum and delamination, so as not to affect the firmness of subsequent installation of cabinets and range hoods.
Question 3: What should I buy to decorate the kitchen? If you are looking for a decoration company to do it, you don't have to consider the accessories. If you find workers to decorate yourself, you must buy auxiliary materials: cement, sand and bricks. Waterproof coating, 80 1 glue. These are all auxiliary materials. Main materials: sanitary ware, toilet. Shower. Face basin needle board hung ceiling
Question 4: What materials do you need for kitchen decoration? What materials do you want? Henan Dichao Decoration Zhengzhou Zhuang Jie Company. Kitchen storage: the function of the kitchen determines that it is the most "dirty, chaotic and poor" place in the home environment. How to make the kitchen beautiful and tidy is another important purpose of kitchen decoration besides convenience function. To make full use of space, use cabinets and hanging cabinets to find relatively suitable storage space for pots, bowls, scoops and basins. The low cabinet in the kitchen is best made into a drawer, which is convenient to take and put when pushed and pulled, and has a better view. Hanging cabinets are generally made into multi-layer grids with a width of 30 to 40 cm.
Question 5: What should be customized for kitchen decoration? Ceiling, cabinet, range hood, gas hood. If you use gas water heater, you should also choose gas water heater. Cabinets need to consider materials and styles, and the most important thing is that this part is divided.
Question 6: What should I buy to decorate the kitchen? Who knows that the kitchen is an important area in the decoration? Necessary things such as range hoods, gas stoves, sinks+faucets and water heaters are definitely needed, followed by some hard clothes, floor tiles, ceilings, cabinets and countertops.
Question 7: What do you need for kitchen decoration? 1, what do you need to pay for the ceiling (PVC, aluminum buckle), wooden keel, nails, sideline, and water pipe? Ceiling board price 10- 150/ square.
2. The price of vegetable pots (single or double) ranges from 50- 1500. Faucets range from 100 to 1000.
3, cabinets range from 500-2000/ meter, even if it is expensive, the quality is similar, you don't care about choosing expensive. My cabinet is made to order: Tommy Tam metal panel, self-suction door, invisible handle, stainless steel countertop, Lushui River board, 800/m. Europa, this configuration is 4000/m. The basket is made of more than 200 stainless steel flat steel and more than 200 food shelves. Bright shelves are coated, not stainless steel.
4, floor drain mine is Wei Xing, 20/ piece.
5. The tile mine is 300*450, and the price is 6 yuan. A box of cement. Leave seam 1 mm.
6. The gas stove I like is Gu Jia's, infrared, with more than 800. Maybe many people don't like it. You can choose something else. The range hood is prepared to be selected from Gujia/Chuanye 1400 or above, with touch side suction. The gas water heater is selected from Gujia/Xinfei, 12 liters or more 1600. After four days in the wholesale market, choosing these things is really a headache. All installations are free.
7. It seems that the labor cost is more than 30 /m2.
Question 8: What should I pay attention to in kitchen decoration? Home life, the kitchen is essential, cooking, washing dishes, washing dishes should be realized in the kitchen; Whether there is oil smoke in the indoor air is related to the kitchen range hood and whether it is closed. Therefore, the kitchen decoration should pay special attention to matters. 1. If the cooking frequency at home is high, try to give up the open kitchen during the decoration construction, and there will be oil smoke problems. 2. During the construction of concealed works such as toilets and kitchens, follow: small water bag, hot water comes quickly, because it is more convenient to use. 3. When buying range hood appliances, Chinese style is more attractive than European style, and European style is not good-looking. 4. the power socket can be decorated as much as possible, otherwise there are drag boards everywhere in the house. This is particularly important in the construction of concealed hydropower projects. If you are not a person who does not cook, it is best to install air conditioning in the kitchen decoration. 6. Precautions for kitchen decoration Regarding the problem that the flue has not been punched out, as long as someone is cooking in the building, their own range hoods must be turned on at the same time, otherwise there will be a smell of lampblack in the room. 7. The faucet of the sink must be turned on and off with the back of your hand. It is not easy to keep clean with your fingers, and it is difficult to turn with oil on your hands. 8. I feel that the trash can in the cupboard is not practical enough, so it is better to put it outside. In addition, do not install door trash cans and countertop trash cans. Opening the cupboard door in summer will stink. You'd better put the trash can outside. 9. Before the valve of the flue is put back, it must be wiped clean to ensure that the valve plate can be opened and closed freely and can be opened to the maximum, otherwise it will affect the smoke exhaust effect of the range hood. When installing the ceiling, you can leave two pieces unattended, and then install the ceiling after the range hood is installed and tested correctly. 10, there should be a backboard under the artificial stone in the cabinet. 1 1. Precautions for kitchen decoration-If you decorate the kitchen into a white cabinet, it will be difficult to clean and easy to turn yellow in the future.
Question 9: What should be prepared in advance for kitchen decoration? 1. Tiles are very important, so it is very important to prepare tiles. Almost all these items are made by workers, so you need to prepare in advance, and it doesn't take much time for workers to come.
2, design is actually the most critical, you must be prepared.
Question 10: Kitchen decoration process, probably the materials to be bought. The kitchen decoration process and probably the materials to be bought are as follows. I hope I can help you:
The first step is to knock on the wall and build a wall at the beginning of the decoration. In the early stage of renovation, the kitchen has not changed the wall surface, so you can measure it first and then knock on the wall. If you want to change the wall of the kitchen, it depends on whether there is too much influence on the design of the cabinet. If there is not much impact, it can be calculated in advance to avoid waiting until the water distribution circuit is started, so as to plan ahead. When measuring, the owner should communicate with the designer about the general function of the kitchen and the use of electrical appliances to facilitate drawing. The designer will tell you where you need to change, such as gas meter or gas pipe, smoke outlet, etc. You should write it down in detail.
Step 2: After the initial trial, the designer will design the plan, three-dimensional diagram and effect diagram of the cabinet according to your requirements and actual size. At this time, you can talk to the designer directly, mainly to see whether the design scheme conforms to your living habits and whether the operation area planning is reasonable. After the scheme is determined, the designer will issue detailed hydropower drawings (before tiling), and then you can take the hydropower drawings and design scheme back to the hydropower master to ensure that the master allocates water and electricity according to the drawings.
Supplement: Some owners' kitchens have been tiled and paved with water and electricity before measurement. This method is not very desirable, because the water and electricity laid before the scheme is determined is almost unreasonable, because the master of water and electricity will not consider how reasonable the kitchen layout is, but can only make a rough estimate, so that the cabinet design in the later period is largely restricted and often fails to achieve the expected effect. Therefore, it is reasonable to start hydropower after the scheme is determined.
Step 3: After getting the water and electricity drawings, ask the master to allocate water and electricity in strict accordance with the drawings. You'd better look at the drawings yourself after typesetting. Only when the basic position is ok can the clay master begin to lay tiles, and try to let the clay master correct the non-right angle wall when sticking tiles. Whether the walls are at right angles has a certain influence on the manufacture of cabinets. At the same time, if it is necessary to replace the gas meter, gas pipe and smoke exhaust hole, it should be done simultaneously. Generally, the property has the telephone number of the gas company. After the call, they will send someone to the door within 3 days.
The fourth step: hydropower positioning, tile completion, necessary kitchen appliances transformation and ceiling installation. It's time to notify the duplicate quantity. Don't pile things in the kitchen after the copy is completed, which will affect the measurement. At this time, the designer will make detailed measurements, including the exact size, the angle of the wall, the height of the ceiling, the location of water and electricity, the size of the gas meter and pipes, and then go back and make duplicate drawings.
Step 5: After the designer informs you of the final plan, go to the exhibition hall you bought to confirm the final plan, and choose the color, handle style and other things that need final confirmation. You need to provide detailed dimensions of electrical appliances. If the sink needs to be made into a basin under the table, buy a sink first. If the appliances and sinks are bought in the cabinet company, these problems will not be needed, and then you can sign a formal contract to order production. Generally, it can be installed within one month after placing an order. Before installation, you should clean up the items in the kitchen to avoid wasting installation time. A normal kitchen can be installed in two days. After installation, you can check yourself first to see whether the gap size of the cupboard door is uniform, whether the switch of the cupboard door is coordinated, whether the drawer is drawn smoothly, and whether the functional accessories are used normally. If there is any problem, you should immediately communicate with the installation master and solve it in time.
For more graphic experience, please see the ToGo experience.