Decoration quotation list, what are the quotation details for decoration?
A, bricklaying:
1. Floor tile laying: 30 yuan/m2 (clean)
2. Wall tiles: 30 yuan/m2 (clean)
3. Brick skirting line: 12 yuan/linear meter (cleaning accessories)
2. Contractor (contractor, contractor): 1 10 yuan/meter.
Third, do waterproof:
1. Waterproof cleaning: 30 yuan /m2.
2. Waterproof contracting material: 55 yuan /m2.
Iv. wall painting (contractor):
1, Meishili: 20 yuan/m2.
2. Dulux (second generation) five in one: 26 yuan/square meter.
3. Dulux Gold Full Effect and Nippon Hardcover Full Effect: 28 yuan/square meter.
4, Dulux Haolang full effect, Nippon hardcover net taste full effect: 33 yuan/square meter
5. Wall sticker: 8 yuan/m2 (? Ordinary)
Five, metope grassroots processing:
Packing: 22 yuan/m2, with Meichao Yiping YGP800 putty.
Cleaner: 16 yuan/m2
Gypsum leveling 15/ m2? (local)
6. Plastering line (contract and materials): 15 yuan/linear meter.
Seven, ceiling board:
1. gypsum board flat roof (contractor): 90 yuan /m2.
2. Gypsum board formed roof (including lamp pool formed roof) (contractor and contractor): 130 yuan /m2.
3. Gypsum board linear ceiling (contractor and contractor): 80 yuan/Yanmi.
4. Aluminum gusset ceiling (0.7 contract material): 1 10 yuan /m2.
5. Lifting steps of aluminum gusset plate (contracting for work and materials): 80 yuan/Yanmi.
6. Plastic-steel ceiling (contractor and contractor): 80 yuan/m2.
7.PVC ceiling (contractor and contractor): 60 yuan /m2.
Eight, do partition:
1. Lightweight steel keel gypsum board partition wall (contractor and contractor): 90 yuan /m2.
2. Lightweight brick partition wall (contractor and contractor): 120 yuan /m2.
Nine, waterway reconstruction:
1. Ming Guan (contract and materials): 45 yuan/Yanmi.
2. Covered pipe (contractor and contractor): 55 yuan/Yanmi.
X. circuit conversion:
1. Opening (contract and materials): 25 yuan/Yanmi.
2. Hidden line (contractor): 35 yuan/Yanmi.
XI。 Other projects:
1, wall smashing: 30 yuan /m2 (cement precast hollow slab wall) 45 yuan /m2 (brick wall) 80 yuan /m2 (reinforced concrete wall).
2. Garbage removal: 200 yuan/household (two-bedroom) refers to the labor cost of moving to the designated place of the property, excluding foreign transportation.
3. Lighting installation: 200 yuan/household (two-bedroom) is labor cost.
4. Hardware installation of sanitary ware: 200 yuan/household (two bedrooms)
5. Thermal insulation wall cement board, embedded with polystyrene board or rock wool (contractor and contractor): 120 yuan/Ping.
6. Ground leveling (contract and materials): 24 yuan/m2.
(Price source network, for reference only)
The quotation sheet for home improvement involves the materials that can be selected in the steps of ceiling board, contractor (contractor) and wall foundation treatment and their prices. We know that different products have different effects, and the cost of manual installation has a great relationship with time and region. Consumers who have no concept may cause losses. Therefore, it is very important to refer to the template and shop around to choose truly inexpensive furniture accessories. It can reduce expenses and avoid losses.