China Naming Network - Eight-character lottery - Quality commitment letter

Quality commitment letter

With the continuous progress of society, we have more and more opportunities to use the letter of commitment, which is the product of standardizing oral commitment in written form. Then the question is coming, how to write a proper commitment letter? Here are seven quality promises I have compiled for you. Welcome to read the collection.

Quality Commitment 1 1 Design Technical Service Scheme

In order to ensure the smooth progress of the survey, design and construction of this project, our company will carry out the survey and design of this project in strict accordance with the current standards, regulations, norms and technical specifications of the state and the power industry. In the design, we will follow the electric power construction policy of "safety, reliability, economy and giving priority to meeting the operation needs", conscientiously sum up and study the design ideas, design methods and optimization schemes of domestic advanced projects, so as to make the project in line with the domestic advanced level in terms of safety, reliability and economy, and make the project. Provide the following technical services in the whole process of project construction:

(1) Complete the design of each design stage on time, with good quality and quantity as required by the owner, and be responsible for the accuracy of design data;

(2) Cooperate with the owner to obtain relevant line planning, pre-trial approval of project land and agreement on requisition and occupation of forest land;

(3) Sign a technical agreement with the winning equipment manufacturer;

(4) Take an active part in relevant meetings organized by the Employer and provide technical data required for the meetings;

(5) As the technical responsible unit of the project, provide comprehensive technical support to the owner;

(6) Assist the external coordination of the project site in the process of survey and design;

(7) Prepare a complete list of main equipment and materials, so as to meet the requirements of the owner to consider the bidding of equipment and materials in advance.

(8) Prepare complete technical specifications for equipment and materials, and assist the owner in technical and commercial negotiations for equipment and materials.

(9) Prepare the main technical specifications of auxiliary materials and make a preliminary inquiry, and put forward detailed budget estimates to the owner to create conditions for the owner to bid for the construction unit.

(10) Before construction, make technical disclosure to the owner, construction and supervision units, introduce the general situation of design, explain the design intention, and answer questions raised by all parties;

(1 1) Workers shall be stationed at the construction site during the construction stage to solve relevant design problems in time, be responsible for design changes, and put forward the construction budget increase and decrease table at the same time;

(12) Cooperate with the owner to do a good job in project construction settlement;

(13) arrange the project return visit in time after the completion acceptance, listen to the opinions of all parties, solve the remaining problems, and do a good job in the later service;

(14) Complete other work arranged by the employer.

2. On-site technical support

The relevant personnel of our company's technical services are the chief project design engineer (chief designer), relevant professional offices and field representatives. Resident site workers' representatives are composed of representatives from relevant professional sites to provide technical services on the construction site on behalf of the company.

(1) We will earnestly implement the resident representative system of electric power survey and design compiled by the General Electric Power Planning and Design Institute, and the field representatives of our company will earnestly perform the duties of industrial representatives, meet the requirements of the survey and design contract for the on-site service of industrial representatives, and meet the expectations of customers.

(2) In order to make the service achieve the expected purpose, according to the requirements of AAA service workflow, AAA has formulated clear service workflow requirements in terms of personnel allocation, organizational leadership, organizational discipline, and duty performance.

3. On-site technical service measures

(1) Workers were sent to the construction site.

According to the nature, scale, construction progress and requirements of all parties, timely dispatch workers to solve specific problems. When there are problems to be dealt with at the site, it is required to arrive at the site quickly and timely to solve them. Short-distance projects require workers to arrive at the site on the same day, and long-distance projects should not exceed 48 hours. When not in the construction site, the person in charge of project design and professional design should take the initiative to keep in touch with the owner and other parties in the construction, communicate and negotiate more, grasp the engineering information in time, and provide timely and satisfactory services.

(B) the distribution of workers' representatives

According to the requirements of on-site construction progress, designers with rich experience, high technical level and strong sense of service are stationed to form on-site design representative groups (industrial representatives). The professionals who enter the site are designers who participate in the preliminary design of this project, have a strong sense of responsibility and can handle problems independently. The main professional representatives will be the chief designer or professionals with considerable qualifications.

(3) Organizational discipline of employee representatives

Staff representatives consciously abide by the on-site organization discipline, respect the on-site leaders, abide by the relevant on-site systems and regulations, and do their jobs well under the unified command and arrangement of the on-site leadership departments.

(four) to perform the duties of employee representatives.

The employee representatives shall perform their duties in accordance with the management regulations of the Electric Power Planning and Design Institute and the quality system operation documents of our company. In order to make the project implementation meet the expected design requirements, and ensure the construction quality and strictly control the construction standards together with the construction unit, all service personnel are required to provide standardized services:

(a) Before the project starts, in order to make customers and construction units better understand the design intent, construction standards, construction precautions, etc. The person in charge of project design will lead the team to make technical disclosure and answer questions with the participation of the main designers of various engineering design majors and some on-site representatives.

(b) The project manager attends every project dispatch meeting, reports the design work in time, listens to opinions and suggestions from all sides, and solves the difficulties encountered in construction in time. Workers' representatives timely feed back the information of site construction progress, and if necessary, the project design manager will adjust the design progress according to this information to meet the construction needs.

(c) According to the provisions of the Resident Representative System for Electric Power Survey and Design, industrial representatives should actively deal with the problems in design documents and drawings on the spot according to their duties and authorities, and issue design modification notices in time. General design changes should be completed on the date of submission. However, for technical schemes involving major technical principles and having a significant impact on investment, the industrial representative will report to the company in time, and the company will instruct the industrial representative to modify the design according to the scope of authorization stipulated by relevant systems, and the design modification work carried out by the industrial representative on site should seek the consent of the owner.

(d) The industrial representative accepts and handles the design change requirements put forward by the construction unit and other subcontractors at the site, and obtains the "consent" of the owner.

(e) In order to ensure the correctness of design changes and control the great changes in investment caused by major design changes, the "Design Change Notice" is uniformly arranged and issued on site.

(f) Workers' representatives timely feed back the site quality information to the unit, so that the project design can provide technical suggestions to the owner or make design modifications.

(g) One year after the project is put into production, we will pay a return visit to the project, solve the problems left over from survey and design, listen carefully to users' opinions, collect information and sum up experience.

4. On-site service commitment

Construction site service is an important part of quality control in the whole process of electric power survey and design, an important measure to ensure construction according to design documents and correct implementation of design intent, and an important part to improve design quality and control investment. Our company attaches great importance to on-site service. In order to do a good job in the on-site technical support service of this project and ensure the smooth progress of the project construction, the project department of this project has set up an on-site service team, which is under unified leadership and management. According to the construction progress and requirements of the project, the experienced on-site general representative and the main designers of various disciplines of this project are selected to provide technical services to the site.

Combined with the industrial representative system implemented by the company, the on-site technical support and service commitments are as follows:

(1) Strictly implement the workshop operation documents of our company and the on-site representative system of electric power survey and design institute, and provide the best and best on-site service for the owner and fully cooperate.

(2) General problems that do not affect the site construction and can be handled on site shall be solved on the same day. When the workload of design modification is heavy, it is guaranteed to be completed on time. For problems that affect the construction progress or are not allowed to be postponed and need urgent treatment, we will immediately organize personnel to be stationed at the site for on-site treatment.

(3) Our company promises that when the owner, construction, operation and supervision units are invited to the site to deal with problems, our company will take the initiative to do a good job of cooperation and stand by at any time for a rainy day. Before the industrial representative goes to the construction site, he should make all necessary preparations, such as drawings, materials and calculations.

(4) When there is a big problem in the project or the owner thinks that the problem is not satisfactory, we will organize experienced experts to study and solve it by the chief engineer in charge of the project.

(5) Carefully confirm the design drawings before construction.

(6) Take the initiative to carry out technical disclosure of construction drawings, and fully explain the design intent.

(7) According to the construction progress, the industrial representative shall organize relevant majors to conduct a comprehensive inspection of the drawings to be constructed in advance, and modify the construction drawings in time when problems are found, so as to eliminate mistakes, leaks, bumps and defects before construction.

(8) Industrial representatives should go deep into the site to understand the construction progress, construction quality and the implementation of design documents, put forward rectification opinions in time when problems are found, and actively assist in solving them.

(9) Actively assist the owner in the acceptance of concealed works to ensure the construction quality.

(10) Strengthen the management of industrial agents, formulate a system of rewards and punishments for on-site service assessment, and regularly assess the attitude, ability and level of on-site service of industrial agents. Those who are unfavorable to the performance of their duties, violate professional ethics, or are dissatisfied with the owners should be criticized and educated in time, and those who are serious should be replaced in time, and punished according to the reward and punishment methods of the workers' representatives.

5. Continue to serve after the project is put into production.

After the project construction, negotiate with the owner, arrange the project return visit in time, sum up the experience and lessons, improve the design work, and continuously provide the design level and service level. The project return visit should be attended by the chief engineer, chief designer and main professional and technical personnel. During the return visit, actively solicit the opinions of the owner, listen to the opinions and suggestions of all parties, study carefully, put forward the treatment plan, solve the problems left over from the design, and do a good job in the later service. Seriously cooperate with the owner to complete the project completion drawing and settlement, and cooperate with the owner to complete the completion acceptance, project evaluation and project summary.

Legal representative's identity certificate Bidder's name: Yunnan Xibang Electric Power Survey and Design Co., Ltd. Unit nature: limited liability company

Address: A2, Floor 6, Building B, Yilong Building, Jinbi Road, Kunming. Date of establishment: February 25th, 20xx.

Operating period: 20xx February 25th to 20xx February 24th.

Name: Shen Gender: Male Age: 43 Position: The general manager is the legal representative of Yunnan Xibang Electric Power Survey and Design Co., Ltd. This is to certify that.

Copy of legal representative's ID card:

Quality Commitment 2 Through several provincial and municipal engineering quality inspections, we deeply realized the importance of engineering quality and made a commitment to future construction quality control:

1, establish and improve the management system.

Improve the construction organization and management organization of the project department, implement full-staff, whole-process and total quality management, implement functions and responsibilities layer by layer according to the management principle of division of responsibilities and mutual coordination, and carry out construction in strict accordance with the dike construction specifications to ensure the engineering quality.

2. Strict raw material entry system, and put an end to unqualified materials.

Raw materials are the premise to ensure the engineering quality. Without qualified raw materials, there is no qualified engineering quality. Therefore, it is necessary to select the gravel yard with grading meeting the requirements, report it to the supervision department for sampling, and entrust the experimental center of Northwest Water Conservancy Research Institute of the Ministry of Water Resources to do relative compaction and particle analysis experiments. According to the test results, reasonable construction parameters are determined through rolling test, so that the construction process and final quality inspection can be based on evidence. In addition, samples should be taken from different borrow sites for inspection, and only when raw materials pass the inspection can they go to the embankment, so as to resolutely put an end to unqualified materials entering the site.

3, strictly implement the three inspection system and concealed engineering acceptance.

In the process of construction, insist on checking the last procedure, ensure this procedure, serve the next procedure, and do a good job of self-inspection, mutual inspection and handover inspection. Follow the three-level inspection system of ZuoYeDui self-inspection, QHSE re-inspection and supervision acceptance. For concealed works, the next working procedure can only be carried out after inspection and joint acceptance visa.

4, improve the engineering data, ensure the project schedule and data synchronization.

Engineering data is the support and guarantee of engineering quality. We entrust qualified personnel from the Experimental Center of Northwest Institute of Water Conservancy Science of the Ministry of Water Resources to enter the construction site, sample and test the relative compactness of the roller compacted layer as required, strictly follow the construction procedures and supervision instructions, and adhere to the supervision acceptance visa system for each working procedure. At the same time, our project department has added librarians to improve the engineering data as soon as possible, which is to synchronize the data with the progress of the project.

Shaanxi province Baoji gorge engineering bureau

Weihe River Management Project Department of dike widening project from Fatangqiao to Luojiaqiao in Fufeng County

20xx August

Quality Commitment Article 3 Cable Bridge Procurement Contract

Party A (demander): Party B (supplier):

According to the Contract Law of People's Republic of China (PRC) and other relevant laws and administrative regulations, Party A and Party B, on the basis of equality, voluntariness, fairness, honesty and credibility, reached an agreement on the purchase of cable tray from Party B through friendly negotiation and signed this contract.

I. Delivery time:

1. 1 according to the construction progress of its own installation project, Party A shall notify Party B of the demand plan of supply time, specifications and quantity in writing or by telephone before 10.

1.2 Party B must deliver the purchased cable tray to the construction site on time in strict accordance with the plan provided by Party A, and unload it to the designated place according to the building number.

Two. Total contract price:

Tentative RMB yuan (in words: RMB yuan only. The unit price agreed in this contract is the total price and will not be adjusted. If there is any increase or decrease in the actual supply quantity during the final settlement, the settlement shall be made according to the corresponding model price in the tender offer.

The price of materials fluctuates. When the goods arrive at the construction site, no matter whether the market price of raw materials rises or falls, the unit price will not be adjusted in this contract.

Four. Settlement and payment methods:

Party B shall bring all cable trays into the site according to the demand plan proposed by Party A, and pay 90% of the total amount of all cable trays within 10 days after the relevant personnel of Party A and Party B * * pass the acceptance and sign the acceptance sheet, and the balance shall be paid in one lump sum after the completion acceptance.

Five, cable tray quality requirements, technical standards and liability for breach of contract

5. 1 Party B guarantees that the product standards and technical requirements of the cable tray provided meet the national standards and meet the design requirements of the drawings.

5.2 Party B must guarantee the quality requirements, technical standards and acceptance standards of the cable tray in this contract, and at the same time, Party B must issue corresponding batches, certificates (with enterprise identification cards), inspection reports, production licenses, business licenses and after-sales service commitments.

5.3 Party B must ensure that all cable trays produced pass the on-site inspection.

5.4 If Party B fails to deliver the goods on time, it will be deemed as breach of contract, and Party B shall pay liquidated damages to Party A, reorganize the materials to enter the site according to Party A's requirements, and bear all economic losses caused to Party A therefrom.

5.5 If Party A fails to pay the price as agreed in the contract, it shall pay the price on a daily basis.

5.6 If Party B fails to deliver the goods on time due to Party A's requirements or force majeure factors, the delivery date shall be postponed accordingly.

5.7 During the warranty period, Party B shall do a good job in quality assurance. If the cable tray produced by Party B has quality problems during normal use, Party B shall unconditionally replace the cable tray within 24 hours after receiving the notice from Party A, and bear all economic losses caused to Party A, residents and the construction party. If Party B fails to deal with it in time as stipulated in the contract, Party A has the right to deal with it on its behalf, and Party A has the right to directly deduct all economic expenses from the quality guarantee deposit without notifying Party B. If the deposit is insufficient to compensate, Party B shall pay the expenses exceeding the deposit to Party A by cheque or cash within 7 days after receiving the written notice from Party A, otherwise it will be regarded as a serious breach of contract by Party B, and Party B will bear all economic losses and legal responsibilities brought to Party A from it.

5.8 If the supplied products have quality problems, Party B will replace them unconditionally within three days. If Party B fails to replace the goods with good quality on time, Party A has the right to terminate the contract and purchase by itself. Party B voluntarily and unconditionally pays twice the expenses incurred by Party A's self-purchase, and unconditionally bears all direct and indirect economic losses and legal responsibilities arising therefrom.

5.9 Cable tray thickness requirements: 500-wide tray plate is 1.5mm steel plate, 400-wide tray plate is 1.2mm steel plate, and 300-wide tray plate is 1.2mm steel plate. The bridge frame includes external connectors and connecting bolts, which are made of hot plate plastic spraying and light gray in color.

VI. Settlement of contract disputes:

In case of any dispute during the execution of this contract, if both parties fail to reach an agreement through consultation, they may bring a lawsuit to the people's court where the contract is signed.

Seven. Other matters:

7. 1 Matters not covered in this contract shall be settled by both parties through negotiation, and a supplementary agreement shall be signed separately;

7.2 This contract is made in quadruplicate, with each party holding two copies.

Seal of Party A (Buyer): Seal of Party B (Supplier):

Agent:

Date:

Quality Commitment Article 4 Our company promises to strictly fulfill the following commitments during the supply period of "Procurement Project of Water Supply Pipes and Fittings for Municipal Works in Bid Sections I, IV and V of Resettlement Project in Supporting Area of Hainan Wenchang Space Launch Site":

1. During the supply period, the price of the winning product will not be increased, and the winning price of the product is the highest price limit.

2. Our company promises that if it is found that our supply price is higher than the actual transaction price of the bidding result or does not meet the requirements and commitments of the bidding documents, our company will reduce the price to the actual transaction price within the time limit specified by the purchaser and meet the relevant commitments of the agreed supply.

3. If the winning product model is discontinued, our company will notify the purchaser in writing within 3 working days from the date of learning the relevant information.

4. Our company promises that the supply price has included goods procurement and related services (installation, debugging, use training, etc. ), all taxes and fees to be paid and all expenses required for the goods to be transported to the designated place.

5. This letter of commitment is valid within the validity period of the supply agreement.

In order to fully protect the people's food safety, ensure that the inspection work is fair, scientific, accurate and rigorous, promote the efficiency construction of our unit, improve the quality and level of food safety inspection services, and make the food inspection management activities orderly, our center makes the following commitments:

First, strengthen quality management.

In accordance with the requirements of quality system documents such as certification management of food testing institutions and quality management manuals, procedure documents and work instructions of the center, we will further standardize the quality management of the center inspection and promote the professional, scientific, standardized and standardized construction of the center inspection work.

Second, improve the detection level.

According to the center's quality policy objectives of "scientific rigor, objectivity and fairness, accuracy and timeliness, and quality first", we will do a good job in training testing personnel, continuously improve the center's comprehensive testing ability, and ensure that the content is objective and fair, the data is scientific and accurate, the test results are credible, and the test reports are timely.

Third, standardize testing services.

We will implement the three systems of "first inquiry responsibility system, time-limited completion system and accountability system", strictly abide by the agreements and commitments to customers, adhere to the principle of voluntariness and indifference, provide scientific, fair and accurate testing services for every customer, strictly implement the price policy, and charge according to the open charging standard.

Fourth, strengthen confidentiality.

Do not disclose the inspection plan, scope, sampling content and time to the inspected unit, and protect the confidential information and intellectual property rights of all customers and their related parties. The information provided by the customer is only used for testing. The customer's information and intellectual property rights are not used for profit or non-profit activities such as technology development, consulting, manufacturing and sales, and the customer's technical information and test results are not disclosed to third parties.

We will strictly abide by the above commitments and welcome supervision from all walks of life.

Commitment unit: xxx

Quality Commitment Article 6 Dear (Customer):

Thank you very much for choosing our products! In order to protect your rights and interests, in line with the principle of being responsible to users, our company makes the following guarantees and explanations on the quality of the products you buy:

First of all, meet the standards:

(Indicate appearance, size and performance, and meet specific standards)

2. The quality guarantee period is * years from the date of purchase (subject to the date of purchase invoice).

3. This quality guarantee will come into effect after the user fills in the user registration card and submits it to * * * * * Co., Ltd. (hereinafter referred to as "the Company").

4. During the quality guarantee period, if the product fails in normal use, the company will provide free after-sales service with the product warranty card, but the damage caused by human factors, floods, fires, earthquakes and other disasters or force majeure is not covered by this warranty.

5. During the warranty period, the company will charge material fees and maintenance fees as appropriate if there are any of the following circumstances.

1. The product warranty card is not presented or the content of the product warranty card is inconsistent;

2. Damage caused by not using the working program environment indicated in the user manual;

3. Damage caused by unauthorized disassembly, expansion and modification;

4. Damage caused by maintenance by technicians outside our company.

6. This quality assurance is only applicable to Chinese mainland area.

Seven, matters needing attention:

1. Install and use the products in strict accordance with the requirements of the company's product manual.

2. Proper maintenance helps to prolong the service life of the company's products.

3. In case of drastic changes in the product use environment, you should contact the company in time.

* * * * * Limited

Company seal:

Quality Commitment Article 7 Party A: Zhumadian City Garden Management Bureau

Party B: Baihui Guo Linhua Mu Farmers' Professional Cooperative in Yicheng District, Zhumadian City.

Party A entrusts Party B with greening maintenance, and through negotiation, Party A and Party B reach the following agreement:

A, maintenance project related information

Maintenance Project Name: Greenland Maintenance Project

Maintenance location: Zhongyuan Avenue (Zhonghua Road-Gongyeer Road)

Maintenance area: 3053 19 m2

Second, the maintenance period

Maintenance period: one year

Third, the maintenance responsibility

1. During the maintenance period, Party B shall, in accordance with the operating procedures and quality standards for greening and maintenance, reasonably organize and carefully maintain, and complete the maintenance management tasks with good quality and quantity.

2. Greening facilities and main maintenance contents

(1) Pruning: According to the growth characteristics, site environment and landscape requirements of various plants, it shall be carried out in time according to the operation procedures.

(2) Fertilization: According to the growth characteristics of various plants and the demand of plants for fertilizers, fertilization is required at least twice a year. New plants should be fertilized in time according to their growth, so as to maintain the vigorous growth of all kinds of plants and achieve certain landscape effects.

(3) Weeding: All kinds of green spaces, tree holes and green belts should be combined with loosening soil to remove all kinds of weeds in time.

(4) Bud smearing: it is mainly used for trees and large shrubs. Adventitious buds should be removed in time to keep the tree skeleton clear, promote beautiful growth form and concentrate nutrition.

(5) Pest control: Pest control is an important means and content in plant protection. It is necessary to predict the parasitic objects of various plants in time and take timely measures to prevent and control them.

(6) Drought resistance, typhoon resistance and waterlogging resistance: new plants should be irrigated in time in dry season to prevent plants from dying due to dehydration. During flood season in Taiwan Province, it is necessary to strengthen drainage to prevent plants from being damaged.

(7) Does not include the loss of vegetation caused by natural factors and irresistible factors.

Four. Responsibilities of Party A and Party B

Party A has the right to evaluate the service quality of Party B, and Party B also has the right to evaluate the service quality of Party A. ..

Verb (abbreviation for verb) inspection and acceptance

Party A shall accept Party B's maintenance quality by means of general survey and irregular random sampling every month. ..

Supplementary clause of intransitive verbs

Matters not covered in this contract shall be settled by both parties through negotiation, and a written supplementary agreement shall be signed, which shall have the same effect as this contract.

Zhumadian Yicheng district Bai Hui Lin Guohua mu farmer professional cooperative