China Naming Network - Eight-character lottery - Whether to rebuild hydropower or build walls first.

Whether to rebuild hydropower or build walls first.

The decoration steps are as follows:

1. Remove some walls that need to be rebuilt.

2. Build a wall, and then paint the new wall with cement.

3. First, hydropower positioning; B, routing and slotting; C. wiring.

4, central air conditioning, fresh air equipment installation

5, carpentry ceiling, door cover construction at the grass-roots level

6. Ceramic tile installation structure

7, metope, top putty powder coating construction

8, metope, top putty grinding, metope basement membrane construction.

9, latex paint spraying, wallpaper paste construction

10. Installation of finished products: doors, door covers, cabinets, integrated ceilings, switch panels, lamps, etc.

1 1, curtain installation, furniture entry

This is the general step of decoration, hope to adopt it.