China Naming Network - Eight-character lottery - What is the order of decoration?

What is the order of decoration?

1, preliminary design

This step is mainly to measure the house and design it according to daily living habits. Owners should not be lazy. Although this step seems troublesome, it is useless. However, it is a factor that can affect the later effect of decoration.

Pay attention to several data: wall area, wall paint area, tile area, wallpaper area, floor area and height.

2. Demolition and transformation of the main body

The main purpose of this step is to reflect the overall framework, mainly including the following items: demolition of walls, building of walls, replacement of doors and windows, demolition of heating, etc.

3. Hydropower transformation

Hydropower transformation is a concealed project, and this step is mainly to design circuit loops, lay weak electricity, and lay water and sewage. It should be noted that hydropower transformation is a project that needs to do a good job in the early stage. It is necessary to make certain preparations in advance, plan the electrified furniture and appliances to be used in the future, and then reserve sockets in advance. One thing to be reminded is that spare sockets should be prepared as much as possible at home to facilitate the use of new electrical appliances in the future.

High-power electrical appliances should have specially designed circuits.

Whether the socket of the range hood affects the installation of the range hood also needs to be considered.

4, wood, ceramic tile, oil engineering

Woodworking, bricklayer and oiler can be said to be twin brothers in decoration, and they basically appear in turn. The order of appearance is in accordance with the principle of "whoever is dirty first".

5. Gaiwa

The bricklayer came out. When tiling in the house, it should be noted that the threshold and tiling can be completed at the same time.

6. Paint the wall

Then the oiler came. Walls should be treated before priming and finishing. At the same time, furniture finished by carpenters can also be painted by oil workers. If you don't want to paint but paste wallpaper, you need to do some basic treatment on the wall.

7, kitchen and bathroom ceiling

When making kitchen and bathroom ceilings, you should install Yuba and moisture-proof ceiling lamps.

8, cabinet installation

After the ceiling is completed, the cabinets will be installed. Fortunately, the installation time is not long, usually about one day. At the same time, remember to install the sink and gas stove. Gas stoves need gas testing, so it is best to communicate with the property in advance.

9, wooden door installation

Then install the wooden door in the house, and prepare the relevant hardware in advance. Wooden doors and cabinets will be installed for about one day.

10, floor installation

Then contact the floor vendor to install the floor, which will take about one day.

Pay attention to the flat ground before installing the floor, which needs cleaning.

After the floor is installed, you can spread wallpaper. Students who haven't done wall painting should remember to lay wallpaper after the floor is installed.

1 1, radiator installation

Students who need to replace the radiator can install the radiator after installing it on the floor (pasting wallpaper).

12, switch socket installation

Before the hydropower transformation, remind everyone to design the number of sockets and circuits. This step is to install the reformed circuits into sockets one by one.

13, lamp installation

Just install the lights according to the expected plan, there is nothing to pay attention to.

14, hardware and sanitary ware installation

The big ones are almost laid, so it's time to elaborate.

15, curtain rod installation

Curtains must be installed at home. This is installed quickly.

16, pioneering cleaning

Probably tidy up the house and prepare the furniture.

17, furniture admission

Clean the room and let the furniture in. This room is beginning to feel at home.

18, home appliance installation

When the furniture is put in place, it is time to install household appliances, and install household appliances in the reserved position.

19, home decoration

Add some details. Congratulations on the renovation.

The above is the renovation process organized by Xiaobei, hoping to help you.