Seasonal construction safety management?
1. 1 The construction unit shall prepare the seasonal construction plan and emergency plan according to the construction site, seasonal variation law, hydrogeological conditions and construction characteristics of the construction project.
1.2 In flood season and typhoon season, the construction unit shall set up a flood control and emergency rescue organization, establish a duty system, keep abreast of meteorological conditions and take construction preventive measures.
1.3 The construction unit shall provide sufficient materials, equipment, equipment and labor protection articles according to the requirements of seasonal construction plan.
1.4 The construction unit shall conduct seasonal construction safety education and training for all personnel engaged in seasonal construction.
2. Construction in rainy season
2. 1 Before construction in rainy season, the construction unit should make good preparations for flood control and drainage, and organize flood control materials, equipment and protective articles to enter the site.
2.2 Before construction in rainy season, the construction unit shall inspect and reinforce the flood control facilities of the construction site, projects under construction, material storage yard, equipment storage yard and transportation sidewalk, and dredge the drainage ditch. Relocation measures should be taken for temporary houses, equipment and materials that may be flooded.
2.3 During construction in rainy season, anti-skid measures should be taken for scaffolding, springboard, bridge, pier and other working faces in the workplace; Motor vehicles in the field should slow down when driving to prevent slipping, and a parking station should be set up when discharging near the edge of the foundation pit.
2.4 Before and after the heavy wind and rain, the construction unit shall inspect the temporary houses and other engineering facilities, and when it finds dangerous situations such as landslide, collapse, inclination, deformation and rain leakage, it must promptly organize emergency repair, protection and reinforcement.
2.5 Before and after the rainstorm, the construction unit must inspect, test and maintain the lightning protection devices and mechanical and electrical equipment such as steel towers, large equipment, tall scaffolding, supports (arches). , to ensure that they don't be affected with damp, no leakage, grounding resistance value in line with the current national "technical specification for temporary electricity safety in construction site" (JGJ46).
2.6 It is forbidden to engage in the installation, dismantling and welding of open-air steel structures, steel scaffolding, steel supports (arches) and steel formwork in thunderstorm weather.
2.7 In thunderstorm weather, operators shall not stay under trees and construction machinery, and shall not be close to poles, towers, overhead lines and grounding wires of lightning protection devices.