What contents should be included in the bidding documents for engineering construction?
A, project construction bidding should meet the following conditions:
(a) in accordance with the relevant provisions of the state, the project approval procedures need to be fulfilled, and the approval procedures have been fulfilled;
(two) the project funds or sources of funds have been implemented;
(3) Having design documents and other technical data that meet the needs of construction bidding;
(four) other conditions stipulated by laws, regulations and rules.
Second, the problems that should be paid attention to in project construction bidding
(A) carefully study the tender documents
Studying the bidding documents carefully is the primary factor for the bidding unit to win the bid. Although the bidding documents are basically the same, each project has its own special requirements, which will be reflected in the bidding documents and will be ignored if you don't read them carefully.
(2) Reasonably determine the quotation of the list of measures and projects.
The list of measures refers to the non-material projects such as technology, life and safety that occurred before and during the construction to complete the project construction. The valuation of the list of measurement items should be based on the construction organization design of the project subject to tender. The measurement items that can calculate the engineering quantity should adopt the itemized bill of quantities and adopt the comprehensive unit price valuation. The remaining measures can be priced by "project" and should include all expenses except fees and taxes. When determining the cost items such as the list of measures, the actual situation of the project should be fully considered.
(three) reasonable fees, determine the project quotation
After adopting the bill of quantities pricing model, the single and rigorous pricing method in the past has been strongly impacted by the market economy, especially the charging items and charging standards. What items to take and how much to pay should be considered comprehensively. On the premise of "winning the bid at a reasonable low price", we can't consider more and higher costs. Only enterprises with high management level and comprehensive strength can gain the upper hand in the fierce competition. Of course, specifications and taxes are mandatory and must be calculated in accordance with the relevant provisions of the national or provincial and industrial construction authorities when bidding.
For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd