Commitment letter of performance
Whether in school or in society, everyone must have been exposed to letters. Letters are a common style in life. I believe many friends are very upset about writing letters. The following are 1 letters of commitment I collected for you, hoping to help you. Commitment letter for performance 1
On July * * of 2xx, a production scheduling meeting was held in the project management department of * * contract section. * * The project manager * *, chief engineer * *, resident engineer * * and management office * * of the contract section attended the meeting. According to the spirit of the meeting and project management work meeting of Fuji Expressway contractors organized by the Project Office on July 1th, 2xx, and the working goal of "Work hard for 1 days and vigorously promote standardized construction", combined with the characteristics of tight time, heavy task, high standard and great difficulty of this project, fully grasp the unfavorable weather and make good use of favorable weather to organize the construction in an all-round way. On behalf of the * * contract section, the project manager * * solemnly made the following commitments on the current overall construction arrangement:
1. The pulling and hardening of the vertical and horizontal construction access roads (a2, a7 and a8 steel trestles) have been completed, and the percentage of * * kilometers in the total amount is * *, and the requisition of the spoil ground has been completed (or the spoil ground is planned to be completed on * * date of * * in 2xx). Before 2xx * * month * *, pull through the longitudinal construction access road and the transverse access road to the concrete mixing station that can ensure the smooth passage of the concrete truck in the whole contract section, and do a good job in hardening, sprinkling and cleaning the construction access road to avoid environmental pollution.
2. Construction of concrete mixing station, steel bar processing plant, small-scale cover slab prefabrication yard and beam slab prefabrication yard (attached with the plan of each temporary construction)
No.1 and No.1 concrete mixing stations are located at * * pile number, covering an area of * * square meters, hardening area of * * square meters, silo area of * * square meters, partition wall height of * * meters, and can store * * cubic materials. * * * There are * * concrete delivery trucks and * * concrete pump trucks, which mainly supply concrete for * * structures. The volume of concrete is * * * cubic meters, which was completed and put into use before * * day of * * in 2xx. The No.1 concrete mixing station team has * * people
the stationmaster is * * *; No.2 concrete mixing station is located at * * pile number, covers an area of * * square meters, has a hardened area of * * square meters, has a silo area of * * square meters, and has a partition wall of * * meters high, and can store * * cubic materials. The mixer is a * * model with an hourly production of * * cubic meters, * * concrete delivery trucks and * * concrete pump trucks, mainly for
2. The numerical control steel bar processing machine arrived on * * day, 2xx. The No.1 steel bar processing plant is located at * * pile number, covers an area of * * square meters, and has a hardened area of * * square meters. It mainly provides steel bar processing for * * structures. It was completed and put into use on * * day, 2xx, and the No.1 steel bar processing plant has * * * * people. No.2 steel bar processing plant is located in * * pile number, covers an area of * * square meters, and has a hardened area of * * square meters. It mainly provides steel bar processing for * * structures. It was completed and put into use before * * in 2xx, and the No.2 steel bar processing plant has a team of * * * * people, including * * skilled workers and * * factory director.
3. The small-scale cover plate prefabrication yard is located at * * pile number, floor area * * square meters and hardened area * * square meters. It was completed and put into use before * * of 2xx. The small-scale cover plate team has * * people and the person in charge is * * *. All small-scale cover plates were produced on * * of 2xx. 4. The No.1 bridge prefabrication yard is located at * * pile number, covers an area of * * square meters, and has a hardened area of * * square meters, including * * T-beam bases and * * sets of T-beam templates, and * * T-beams are produced by * * Bridge, with an average daily production of * * T-beams, which was completed before * * in 2xx. The average daily production of * * pieces of plate girder will be completed before * * day of * * year 2xx, and the first piece of plate girder will be produced on * * day of * * month. The No.1 beam yard has * * * * people, and the
field length is * *; Bridge No.2 prefabrication yard is located at * * pile number, covers an area of * * square meters, and has a hardened area of * * square meters, including * * T-beam bases and * * sets of T-beam templates. * * * Bridge produces * * T-beams, with an average daily production of * * T-beams, which was completed before * * in 2xx.
III. Signing of raw material supply contract (contract agreement attached to the signed contract)
1. There are * * steel manufacturers who have signed the contract, and there are * * manufacturers who plan to sign it on * * day of 2xx.
2. The cement manufacturers that have been signed are * *, and those that are planned to be signed on * * on * * of 2xx are * *.
3. At present, the manufacturers who have signed the external additives are * *, and those who plan to sign them on * * * of 2xx are * *.
...
IV. Arrangement of subgrade earthwork construction
Subgrade 1 work area: the length of work area is * *, the on-site technical director is * *, the on-site management staff is * *, and * * needs to complete * * million earthwork, and the main supporting machinery is * * excavators, * * loaders, * * bulldozers and rollers.
Subgrade No.2 work area: the length of work area is * *, the on-site technical director is * *, the on-site management personnel are * *, and the main machinery that * * * needs to complete * * million earthwork are: excavators, loaders, bulldozers, rollers, graders and dump trucks.
...
V. Construction arrangement of bridge pile foundation and substructure
1. Team 1 of bridge pile foundation and substructure: team leader * *, site technical director * * and site management personnel * *. * * * There are * * pile foundations with * * bridges, * * * need * * rigs, and now there are * * rigs, and it is planned to arrive at * * rigs on * * month * *, and * * * needs * * kilowatts of electricity, temporary electricity has been completed (or when it is connected) * * kilowatts, and self-provided generator sets * *. * * * There are * * caps, * * pier columns, * * capping beams and * * caps on the lower structure of the bridge. * * * There are * * equipment: * * crane * * platform, formwork * * square meters and steel pipe support * * tons.
2. Bridge pile foundation and substructure team 2: team leader is * *, site technical director is * *, and site management personnel is * *. * * * There are * * pile foundations with * * bridges, * * * need * * rigs, and now there are * * rigs, and it is planned to arrive at * * rigs on * * month * *, and * * * needs * * kilowatts of electricity, temporary electricity has been completed (or when it is connected) * * kilowatts, and self-provided generator sets * *. * * * There are * * caps, * * pier columns, * * capping beams and * * caps on the lower structure of the bridge. * * * There are * * equipment: * * crane * * platform, formwork * * square meters and steel pipe support * * tons.
VI. Construction arrangement of circular pipe culvert and cover channel
1. Circular pipe culvert: Team leader is * *, technical director is * *, site construction personnel are * *, * * need to complete * * circular pipe culvert, and the existing equipment is * *, and it is planned to complete one culvert every * * days; The team leader of the second team is * *, the technical director is * *, the site construction personnel is * *, and * * needs to complete * * circular pipe culverts, and the existing equipment is * *, and it is planned to complete one culvert every * * days.
2. Covered slab passage: Team leader is * *, technical director is * *, site construction personnel are * *, and * * needs to complete * * covered slab passage. The existing steel formwork is * * square meters and steel pipe support is * * tons. It is planned to complete one foundation and one wall body every * * days. The second team leader is * *, the technical director is * *, the on-site construction personnel is * *, and * * needs to complete the * * cover channel. The existing steel formwork is * * square meters and the steel pipe support is * * tons. It is planned to complete one foundation and one wall every * * days.
...
VII. Unfinished construction task commitments
If the above commitments are not completed on the time node, I voluntarily invite the legal representative of the unit to go to Fuji Project Office and Section A Project Management Office on **2xx to explain the reasons and make reasonable adjustments to the organizational structure and construction organization design of the project management department. If the site has not changed much after 2 days of the legal representative's arrival and has not been recognized by the supervision engineer,
promisee: (signature)
attestor: Performance Commitment 2
In order to protect the legitimate rights and interests of migrant workers and not default on their wages, I solemnly promise as the legal representative or authorized representative of (company name):
The project undertaken by our company will ensure that:
1. Abide by the relevant national laws and regulations on engineering construction and consciously maintain and standardize it. Handle industrial injury insurance for migrant workers when hiring and using them.
2. The contracted projects shall not be subcontracted, subcontracted illegally or linked, and the illegal employment mode of "contractor" shall be put an end to.
3. In case of default or deduction of wages of migrant workers in violation of regulations, which causes migrant workers to petition, and other emergencies or public events, our unit is willing to accept the punishment of the owner and other punishment decisions made by the competent authorities in accordance with relevant regulations.
Commitment Unit: (official seal)
Legal representative or authorized agent (signature):
Date: Year Month Day Performance Commitment 3
Zhangqiu Municipal Government Procurement Center:
If we win the bid for the street lamp equipment (No.ZQDL-2xx-8) for the new socialist countryside construction in Zhangqiu organized by you,
if we breach the contract, we are willing to take 3% of the amount involved in the breach of contract as the compensation for breach of contract based on the notice of breach of contract issued by you, and pay it to you separately within 5 days; We are willing to obey the opinions on handling the facts of breach of contract and guarantee to bear all the consequences and responsibilities caused by our own breach of contract.
hereby promise!
Bidder ((official seal): Yangzhou Xinghui Lighting Co., Ltd.
Authorized person/agent (signature or seal):
Telegram: 514-4xxx999
Fax: 514-42xxxx9
Commitment date: April 2, 26. If the tenderee or the bidding administrative supervision institution with jurisdiction discovers and verifies that our company has extracted false information on the above matters, regardless of whether the tenderee or the bidding supervision institution with jurisdiction has legal punishment basis, our company will unconditionally give up the bidding qualification and bid-winning qualification of this project; If our company has received the bid-winning notice, our company unconditionally acknowledges that the bid-winning notice of this project received by our company is an invalid document and does not have any legal binding force on the tenderer, and any consequences and losses caused thereby shall be borne by our company. This commitment has corresponding independence. No matter whether there are other explanations to the contrary, this commitment is an effective component of our bidding documents, an expression of our company's true meaning, and always has priority legal binding force on any behavior of our company related to this project.
promisee: (seal)
legal representative: (seal or signature)
2xx performance letter 5
Party A: (hereinafter referred to as Party A)
Party B: (hereinafter referred to as Party B)
In order to carry out legal construction of the project, strengthen project management and enhance the advantages of enterprise groups. Through friendly negotiation between Party A and Party B, based on the principle of mutual assistance and mutual benefit and common development, Party A will set up a project department, and the partners must make the following commitments:
1. In the contract price, Party B confirms that the following factors and expenses have been comprehensively considered and included in the total contract price:
(1) Party B confirms that all temporary land occupied in the project (temporary access roads, prefabricated factories, living quarters, etc.) are included in the total contract price. Party B shall be responsible for the coordination of temporary land occupation, leasing, ploughing and greening.
(2) The contractor's equipment insurance and employee's personal accident insurance shall be insured by Party B, and the insurance premium shall be borne and paid by Party B, which has been included in the total contract price;
(3) The taxes and fees that Party B needs to pay during the implementation of this contract (except the taxes on materials supplied by the project department and the taxes withheld by the owner) have been included in the total contract price;
(4) Due to the tight construction period of this project, the expenses incurred by various quality assurance measures taken by Party B to continue the construction in winter, rainy season and night to ensure the project quality have been included in the total contract price;
(5) The borrow and spoil ground shall be determined by Party A through coordination and bear the expenses, and Party B has fully considered the transportation distance and other factors when signing the contract, and the relevant expenses have been included in the total contract price;
(6) The expenses of' construction access road, temporary water use and temporary electricity use (except the installation of construction power facilities required by Party A) during construction have been included in the total contract price;
(7)
(8) The relevant expenses for crossing the river and road on the main line have been included in the total contract price; During the execution of this contract, Party B has fully considered the impact on the project cost caused by the price increase of labor, materials (except materials supplied by the project department) and equipment, and included it in the total contract price;
(9) All risks and third-party liability insurance for construction projects are insured by Party A, and Party B fully accepts it.
2. Party B must pay the contracted labor to Party A before entering the site for construction.