Lead: Interior decoration includes room design, decoration, furniture arrangement and various small decorations. Emphasize the decoration and construction of the building, not only during the decoration design and construction, but also after living in it for a long time. In addition, we should gradually establish the concept of "light decoration and heavy decoration". Let me introduce the construction process of interior decoration to you, hoping to help you.

I. Matters to be prepared before decoration

Before decorating, you must prepare a few things and put them in your bag. There are tape measures (buy 5m, not 3m), calculators, and large board clips (used to clip bills and receipts); In addition, it is best to prepare old towels (soft cotton, which are used to wipe bricks after pasting) and plastic bags (wrapped around the pipeline joints to prevent dirt from blocking) at the construction site in advance.

Second, choose a good day.

Before the blasting starts, it is best to personally measure all corners of the house, write it down with a pen ruler and mark it clearly. Don't be lazy. The contents of the measurement mainly include:

1. Define the areas involved in the renovation process. Especially tile area, wall paint area, wallpaper area and floor area;

2. Define the size of the main wall. Especially it is necessary to design the wall size of furniture in the future.

After this, you should buy a radiator.

Third, the main body is demolished to make the space more practical.

The main body demolition and reconstruction is the first project, which mainly includes wall demolition, wall building, wall covering, heating demolition, plastic steel window replacement and so on. Remove the garbage in time to ensure the cleanliness of the room, but also for the convenience of construction.

At this time, it is time to settle the product door. At this time, it is best to browse the cabinets, range hoods, cookers and water heaters to make sure.

Four, hydropower transformation, arrange the use of each space.

Hydropower transformation, no regret medicine to eat. Bricks are stuck on the wall and the ceiling is sealed, so it is difficult to add another socket. So be sure to locate the switches, lights, basins, bathtubs, washing machines and so on. Before the hydropower transformation, the cabinet designer should take measurements at home to help you determine the transformation scheme of power supply and waterway.

Water heater, it is also best to send someone to design the position of power supply and interface according to the model you determine. Warm reminder: it is best to leave a power socket on the wall below the basin to facilitate the installation of kitchen treasures.

Air conditioning holes and power supply should be placed on the wall of the bedside as far as possible to avoid air conditioning blowing directly at people in the future. Keep a distance of 20 cm between the strong and weak points, such as a distance of 20 cm between the socket and the network cable.

The verb (abbreviation of verb) includes Li Guang.

Wrap the ugly tube. Considering the humid environment of kitchen and bathroom, the material of riser must not use wooden keel! Everyone must be careful, even if the wooden keel is painted with antirust paint.

Remember, the vertical pipe is made of light steel keel or red brick. Light steel keel saves space, but the most sturdy and easy to use is red brick. At this time, you need to buy tiles, jointing agents and so on. And the furniture should be set in advance, and the construction period should be kept, generally at least 15 days.

Sixth, ceramic tiles must first have a solid texture.

Buy a floor drain before sticking bricks. Buy a special washing machine or floor drain for the shower, and deodorize it. After waterproof napping, we are ready to stick bricks. In addition to the normal precautions for sticking tiles, the tiles are soaked in water and dried in the shade; In addition to cutting broken tiles, I personally emphasize the overall beauty of tiling. Simply put, the width of the brick on the wall should not be less than 10 cm. This often happens when sticking bricks. For example, the wall width is 1 m, the brick is 32*32cm, and the normal pasting method is 3 whole 1. But 32× 3 = 96, the jointing space of 1 cm should be reserved. Finally, the remaining small bricks can only be pasted 3cm wide. I'm not picky. A narrow brick is stuck there, which is ugly.

At this time, you need to make it clear to the bricklayer in advance that the width of the brick on the wall should not be less than 10 cm. He can cut bricks on both sides. Let's take a wall just 1 meter wide as an example, and it becomes 2 whole and 2 small. 32× 2 = 64, reserved 1 cm for jointing, and the small bricks on both sides are 17.5cm, so that it looks not only symmetrical on both sides, but also the whole wall will not be narrow there. However, this practice costs bricks, so please measure your youth before buying bricks.

At this time, it is necessary to determine the basin and faucet, ask the cabinet designer to come to the door for the second time, and at the same time paint (ready mixed paint or clear paint), wall paint, nitrocellulose paint, diluted water, etc. For example, wallpaper should be determined first.

Seven, oil workers into battle.

If you don't buy a finished door, let the worker master do it.

Tip: Any carpentry work, even if it's just a pass, should follow this step. The core board should sink to the bottom, and then be covered with paint. When mixing oil, irresponsible workers are lazy and brush oil directly on the big core board, which is absolutely wrong. Don't believe the story of selling big core boards. It is no problem to brush oil directly on them. Remember, brush the oil directly, and it won't take long for it to crack completely, remember to remember. Now you don't have to brush mixed oil, but use spray. Workers had better spray white on the inside of the door and the meter box, which is beautiful and not wasteful.

There's nothing to say about painting the wall. Leveling, grinding and rolling must depend on the skill of your oiler. My house is painted in white except wallpaper, and I haven't painted it. Need to remind everyone that if you want to paint the wall, you must pay attention to color matching. The adjusted color is lighter than the color card, and it must not be the same as or darker than the color card, otherwise you will regret it. Because when you paint the wall at least twice, some even three times, the color of the upper wall will get darker and darker.

Different people have different views on whether to spray or roll coating. I use roller coating at home, but I have never tried spraying. It is said that the spraying effect is better, but once it is damaged, it becomes extremely difficult to touch up the paint.

Eight, wallpaper

The wallpaper on the beautiful wall is much better than the wall paint.

After the wall paint is painted, the oil trade union paints nitrocellulose paint where wallpaper needs to be pasted. The paint can be dried thoroughly the next day, and then the master is invited to paste the wallpaper. At first, I was worried that pasting wallpaper would stain the painted white wall, but later I realized that pasting wallpaper was really a clean job! My worry is completely unnecessary.

Note: Do not open the window for ventilation within 48 hours after the wallpaper is pasted, and let it dry slowly in the shade.

Tell the master that if something gets stuck, you should ask him to help repair it.

At this time, it is time to buy panels, sockets and lamps.

Nine, install the socket panel The socket panel can be installed in about half a day.

Warm reminder:

1, it's best to buy a socket with switch function, especially in the kitchen, so that the rice cooker and microwave oven can be controlled without plugging and unplugging the power supply.

2. Although the socket with switch is good, we should pay attention to practicality. According to my observation, all three sockets of the five-hole power supply with switch are flat. Once your electrical appliance needs three round sockets, there will be the depression of using plug-in boards when the sockets are empty. Therefore, multi-purpose sockets must be used, even if it has no switch control!

At this time, you should buy a ceiling for the bathroom and kitchen. If you need to install Yuba, please buy it and install it in front of the ceiling.

Ten, the kitchen ceiling, sealed the last ugly part.

Install the water heater and Yuba first. After installation, the ceiling edge can better semi-package the water heater, that is, the connection is more beautiful.

Tip: 1, it is best to buy aluminum button ceiling, even if it is demolished after many years, it is worth a lot of money to sell waste aluminum. On the other hand, pvc gusset plates look good, but the quality and performance are average, and plastic things are worthless even if they are sold as waste.

2. Buy gusset plates, and ask the price of the whole package. Don't buy gusset plates and corners separately. But the installation fee is extra.

XI。 Installation cabinet

The birth of a beautiful kitchen cabinet is a supporting project, and the range hood, cooker and sink should be arranged in advance. It is best to deliver the goods on the same day and install them together with the cabinet. It was agreed with the cabinet factory in advance that the artificial stone countertops cut off from the stoves and sinks should be brought here, and things with more money should not be given to the factory for nothing. It is very useful to install a water meter and water pipe. ? Twelve, the installation of the finished door should be carried out before the floor installation.

Mainly because the door installation steps are complex, hinge, lock, door suction, door frame and so on. There are many tools used, such as installing the floor first, so it is difficult to avoid bumping. My home is to install the floor first and then the door. There are many small pits on the floor, which is very distressing.

Thirteen, install clothes hangers, curtain rods, lamps, sanitary ware, bathroom hardware. It is suggested that these projects with scattered ash should be settled one by one before installing the floor.

Fourteen, leveling must be done before installing the floor.

Many neighbors' floors were not leveled, so Lao Mao and I were careless. Unexpectedly, after the floor was paved, the corridor was very flat and depressed. I had to take it off, pat it flat with instant powder and spread it again. Prepare a little pepper in advance, don't buy the so-called insecticidal powder brought by the floor workers, just let them spread it along the kicking angle. Workers must not cut the floor in the house, cut in the corridor and finally clean the corridor.