Annual work summary of the project
The 1 project in the annual work summary is about to pass 20xx years as time goes by. At the end of this year, I will review my work in the past year, calm down, sum up my achievements and gains, and find out my shortcomings, so as to facilitate my future work and sum up my work in the past year. I sincerely hope that you will give me tips on improper summary, which will help me a lot. In the past year, with the strong support and care of the leaders of the company and the project department, I earnestly adhered to the "pre-control, standardized, scientific and high-quality work guiding ideology firmly established" to ensure the satisfactory service purpose of each owner and work hard wholeheartedly. Let me talk about my work in 20xx.
First, the quality control of engineering construction, control the work done in advance, after receiving the engineering design and construction drawings, I will first be familiar with the drawings, understand the design intent, understand the main technological process and engineering characteristics of the construction process, record the suggestions on the construction drawing paper in writing, take corresponding measures to apply to the construction site, and do a good job in sampling data of related projects.
Second, record and inspect all materials, personnel and mechanical equipment on site, and prevent unqualified materials from being used in the project. For the construction of key parts of the project, arrive at the station in advance, check whether the construction preparation work is in place, and make a written record of the whole construction process.
Three. Inform the project management department of the construction unit in oral or written form of the problems found in the patrol inspection in each construction process, report to the resident supervision engineer, supervise the construction unit to carry out rectification and recheck, and do a good job in on-site supervision.
4. With regard to the control of safe and civilized construction, I have accumulated some experience by studying the safety production law and establishing the viewpoint that safety prevention is the priority, that is, work should be done first, because accidents can be prevented but unpredictable, and corresponding inspection systems should be established, such as checking whether the full-time safety officer on site is in place, and checking whether the safety protection tools such as safety protection net, safety belts and helmets for aerial workers are complete. Check whether the key parts of the site project are provided with safety warning signs, and rectify them in time when potential safety hazards are found. Supervisors have an unshirkable responsibility for the safety of the construction site, do a good job in daily safety inspection, supervision and management, make corresponding data records, strengthen patrol work, strengthen process control, and do their work better and more seriously.
20xx's work is very busy and full. In order to perform supervision duties, work actively, obey the arrangement of leaders, never shirk, and think of the project wholeheartedly, I will study professional business knowledge more attentively in the coming new year of 20xx, and strive to provide effective benefits for the company.
Summary of the annual work of the project 2 Since this year, from my job responsibilities, I am very grateful to the correct leadership of the company's leaders, as well as the strong support and help of various departments and construction personnel of the company. In terms of safety work, the goal of safety production management has been basically achieved. In particular, there are more than 0/00 items of large and small projects in our company throughout the year, and there is no minor injury or serious injury accident, and the project quality can meet the acceptance standard. These achievements can not be separated from the efforts of all employees in our company. The following is my annual work summary:
1. I think the achievements of safe production throughout the year are mainly due to the great attention and correct guidance of leaders at all levels of the company and the active efforts and cooperation of all employees of the company. Here, I think, one decision is very important for our safety work throughout the year, and that is to insist on holding a good pre-shift meeting.
At the beginning of this year, manager Niu proposed at the morning meeting that the daily pre-shift meeting of the team must be organized well. Use the activity time of the pre-shift meeting to arrange the work of the day, explain the safety precautions of the work of the day, convey the company's current main attack objectives and strategic deployment, and let every employee have a clear understanding. Because we insist on this work, it has played a good role in the safety work, project progress and project quality of our company and laid a solid ideological foundation. The real effect of this work is also reflected in the actual production activities.
2. Since the beginning of this year, the supervision, inspection and guidance on the construction sites of key projects have been basically realized. In this way, problems and some hidden dangers can be found in time, handled and solved in time. This year, the company's projects include county reconstruction; Anti-stealing and automatic generation of line loss; A dozen temporary electricity; Military substation, Liaoning Police College and boiler room in relocation area; Substation kiosks and high and low voltage external lines in three relocation areas. Recently, cable projects such as the western suburb trunk line, the southern suburb trunk line Liu Shu Village branch line and the new bifurcation trunk line. The construction site is scattered, the construction period is tight and the progress is slow. Under the leadership of Minister Zhang, I basically inspected the construction site. From the construction process of these projects to the acceptance of power transmission, more than 95% of the projects can meet the acceptance standards and be completed within the prescribed time limit. It has indeed achieved the task of ensuring quality, quantity and safety.
Third, due to the large number of people in the project this year and the lack of free time, the safety study and education work for construction personnel has been reduced accordingly. This year, I used the pre-class meeting and spare time to study and educate the operators four times and organized them to take exams. In his spare time, he organized teams and groups to study and test "Safety Education for Construction Personnel Entering the Site". In addition, all employees of the company were organized to take the safety production laws and regulations examination (Ganjingzi District Examination), and the number of participants reached 98%. The study of safety laws and regulations is the basis of improving the safety technology and prevention skills of our operators, ensuring the engineering quality and preventing man-made accidents.
In my opinion, although we don't have much time to study and educate, we can really consolidate and improve the operators' thinking through study and education, which will also play a certain role in improving the knowledge level of safety production and the understanding level of operating procedures and technologies, and can be seriously implemented in practical work. This is what I must do well and stick to in my future work.
Finally, talk about the shortcomings in my work.
1. On-site inspection goes through the motions.
2. The team's safety activity records are not checked and urged enough.
3. The problems found were not strictly investigated to achieve the effect of educating everyone.
4. There is a gap in organizing workers' safety study and education.
The annual work summary of the project has come to an end in 3 xx years, and the work in XX years has also come to an end. During this year, I overcame various difficulties through my own efforts, especially with the strong support of my superiors and the cooperation of my colleagues, I successfully completed various tasks and improved my ability in all aspects. This year is valuable, meaningful and rewarding. This year's work and ideas are summarized as follows:
I. Work:
In March of xx, I came to xx project, mainly engaged in measurement, statistics and settlement. This job requires me to be dedicated first. I want to devote myself to my work with a positive attitude. Since I chose this professional post, I will go all out and do it dutifully. The second is to treat the work with a rigorous and meticulous attitude. Be strict with yourself at work. The work of measurement, statistics and settlement is a meticulous work for me, and the requirements are very strict. It requires me to be careful. To make the data accurate, the correct data is convenient for later review, so we must be careful and not make mistakes. This requires us to treat our work with a rigorous and meticulous attitude. The third is responsibility. Work is a kind of responsibility for us. We have an obligation to do it seriously and responsibly. So the quality of your work also depends on your sense of responsibility. The fourth is high work efficiency. For me, improving work efficiency means learning more, and learning good knowledge from learning can improve efficiency. Then, in order to refine the problems and decisions in a short time, we must make decisive decisions, set specific time to arrange our work, and set strict deadlines for ourselves. The fifth is confidentiality. The work I am engaged in is very confidential, especially in the treatment of outsourcing construction teams to keep the unit price confidential. I also experienced the work here and benefited a lot. Although the work is very hard, it is really a learning opportunity for me. From it, I realized the essence of work and learned a lot of things and knowledge that I have never been exposed to. There are also many problems with shortcomings. In the new year, I ask myself to have a brand-new self. Clear your mind and make your work more detailed.
Second, the ideological aspect:
A person can't 100% like his job, but 100% like it depends on how we treat this job with a good attitude. In other words, since you have chosen this job, you should devote yourself to it and show your value. Many successful people don't like their jobs very much, but they have a high sense of responsibility and perseverance, and they are engaged in ordinary work every day. I think as long as I pay, there will be good returns.
In this year's work, there will inevitably be some unhappy things. I have been depressed, depressed and anxious because of the pressure of work. Everyone's work tasks are gradually heavy and meticulous, and it is inevitable that the work pressure will be great. If you are negative and complain, you will not solve the problem. Bad mood sometimes affects my work efficiency, but it is really effective to adjust my mentality in time and find a balanced starting point. I think as long as I go beyond my narrow interests, anxiety and other negative mentality, I can face the difficulties and challenges in my work with positive and healthy emotions. I found that the magic weapon of happy work is to look at my daily work with forgiveness and gratitude.
I also learned a lesson from it. At work, we should first look at the difficulties encountered in our work with a tolerant and peaceful attitude, correctly evaluate our own abilities and value goals, make necessary psychological adjustments, strive to cultivate an optimistic and generous personality, improve our ability to resist dryness and flexibility, effectively divert our attention, transfer, release and adjust our personal mental state at work, and eliminate tension and fatigue. Always keep the heart of knowledge and make work a pleasure in life.
This year, I also met the test of work with gratitude. I often think that because of this job, I have embodied my own value; Because this job has honed my will. Calm down, I will reflect and realize that compared with many laid-off and unemployed people, I am grateful for my generous salary; Compared with the old and infirm, we should be grateful for our youth and health; Compared with ordinary people, I appreciate my full work every day. When you do well and you are satisfied with your behavior, you will be happy.
Third, the specific measures to complete the work plan:
In 20xx, I was still mainly responsible for the measurement, statistics and settlement of xx project. To do this work well, we must first be familiar with the construction drawings and bill of quantities, carefully check them and establish a ledger, which will be of great help to find and compare the engineering data in the future and guide the construction production. Second, timely complete the monthly engineering measurement and statistics and other required forms, earnestly perform their duties, communicate with the supervisor and the owner in time, and establish a good external environment. Third, communicate with the on-site quality inspector and the construction team in time, be aware of the completion of the project quantity and schedule, and complete the results that the leaders want on time.
Quality control focuses on prevention. Appropriately increasing the expenditure of quality prevention fees can improve the engineering quality and prevent accidents. Expenditure is far less than the loss caused by quality accidents, that is, huge "hidden" benefits can be obtained. Similarly, correctly handle the relationship between construction period and cost, find the best construction period cost, and control the construction period cost at the lowest point. Under special construction conditions, the measures taken to ensure the construction period should be compared with the losses caused by the delay of the construction period. After the final accounts of the project are passed, the project payment shall be recovered in time according to the contract, and the owner shall not be allowed to default on the final payment of the project without reason.
Fourth, pay equal attention to responsibilities and rights. Establish a clear and effective cost control system, implement standardized management, incentive mechanism and restraint mechanism at the same time, implement cost responsibility to all posts and special personnel, and take corresponding reward and punishment measures to combine "responsibility, power and benefit" and make cost reduction a conscious action of every manager.
Make full use of modern management means such as network to realize the high efficiency of information transmission. The recorded data should be well-founded, and there will be no mistake of blindly using experience to control, and it can be tracked and monitored in time, directly controlling the progress, completed engineering quantity, material consumption, manpower arrangement, etc. in the process of project implementation, correcting the problems in construction in time, and reducing the negative impact, cost information loss and information distortion caused by the long principal-agent chain in cost management.
Summary is to learn lessons; Planning is to go further. Looking forward to 20xx years of work, I will work harder. I will make continuous progress in my post and make greater achievements. I believe that I will make my greatest contribution to the development of the company in the continuous growth, and I believe that I can do better in 20xx!
The fourth chapter of the project annual work summary has been in the company for nearly half a year. With the strong leadership and care and support of company leaders, individuals have made great progress in 20xx. In the course of my work, I successfully completed the annual work target of 20xx. 20xx's personal work is summarized as follows.
I. Annual Work:
1, familiar with the rules and regulations of the company.
20xx joined the company in September. In order to integrate into the company team faster and better and lay a good foundation for future work, I stepped up my understanding of the company's rules and regulations and became familiar with the company's corporate culture. Through understanding and familiarity, I am proud to join the company's team, but I also feel my own pressure. In the future work, I will take the company's rules and regulations as the criterion, be strict with myself, be honest and self-disciplined, dare to innovate while adhering to the principles, and complete the task faster and better.
2. Be familiar with the structure and site conditions of the project.
As a civil engineer, being familiar with and understanding the site is quite beneficial to the future work. In order to better carry out the work in the future, I went to the scene many times to get a deeper understanding of the layout of the scene. After mastering the first-hand field data, I consulted the relevant technical data, studied the structure of the project, analyzed the difficulties and difficulties in the future construction, and analyzed the basic forms of the project. Through research and analysis, the actual situation of project construction management is objectively predicted, which provides a reliable basis for the next step of planning.
3. Participate in the modification of the management system of the engineering department.
In order to facilitate the management of the engineering department in the future, I combined the requirements of the company and the actual situation of the engineering department, referred to the relevant systems of well-known real estate enterprises such as ABO, and compiled and revised various rules and regulations of the engineering management of the engineering department. The establishment of this system is conducive to clarifying the responsibilities of each post and providing guarantee for project management. Through this compilation, I have a further understanding of other majors in project development, and it also makes my next work clearer.
4. Analyze the weather in 20xx.
In order to complete the company's project development task in 20xx, and make scientific and practical work contents and project construction progress plan in 20xx, I analyzed the weather situation in 20xx, and combined with the perennial weather situation in Wuzhi County, predicted the weather in 20xx. At the same time, I combine the weather conditions and the progress of the project, make reasonable adjustments to the progress of the project, grasp the construction season, avoid large-scale construction in the rainy season, and prepare for the rainy season and high temperature.
Second, the existing shortcomings and improvement measures
20xx is about to die with the wind. Looking back on my work in the company in the past six months, although the workload is relatively large, there are not many highlights, and many jobs are still unsatisfactory. To sum up, the shortcomings mainly include the following points:
1, lack of communication, unable to make full use of resources.
In the process of work, because I am not familiar with other majors, and because of my face, I don't take the initiative to ask other colleagues, which leads to reduced work efficiency or even mistakes, and I can't make full use of superior resources. As the saying goes, "Three people must have a teacher". In the future work, I will actively strengthen communication with colleagues in other departments, share resources through the company's platform, and improve my business level.
2. Lack of planning
In the process of work, especially in the construction stage of project development, due to the lack of planning, the purpose of work is not clear enough, and the contradiction between primary and secondary is unclear, which often achieves twice the result with half the effort. The leader is dissatisfied or full of grievances. In the future work process, I will make a work plan carefully, strengthen my understanding of the purpose, distinguish between primary and secondary contradictions, and strive to get twice the result with half the effort.
3. The major is narrow.
As a modern talent, he should be versatile, so that talents can meet the needs of the times and the company. My professional field is narrow, and I don't know enough about other real estate majors, especially marketing planning and laws and regulations, which limit my own development. In the future work process, I will strengthen the study of other majors, make full use of the company's resources, improve subjective initiative, and strive to become a multi-functional and compound talent.
Three. Measures and suggestions for completing the 20xx target plan
For the smooth development of the company's projects and the company's sustainable development, I put forward the following suggestions on project management.
1, contract management
Contract plays an important role in project management. Without it, project management is impossible, and contract is the basis of project management.
Familiar with the contract. And conduct in-depth and detailed research on the contract, and be aware of key terms, loopholes, possible changes and disputes.
Establish a strong sense of contract. Before the contract is signed, the status of the owner and the contractor is equal. On the one hand, the project manager does not bully others and forces the contractor to accept the conditions outside the contract; On the other hand, we should also be alert to the traps laid by contractors in the process of project implementation. When the contractor puts forward various suggestions, the first thing he thinks of is to abide by the contract and fully estimate the possible economic problems caused by adopting the suggestions.
2. Quality management
In the project implementation stage, the engineering department should carry out various tasks to control and supervise the project quality. Generally speaking, there are several aspects such as reviewing and confirming the contractor's quality assurance system, controlling the quality of materials and equipment entering the site, reviewing the supervision planning and implementation rules, and supervising and inspecting the daily supervision work of supervision engineers.
Review and confirm the contractor's quality assurance system. Focus on checking whether the contractor has established a quality assurance system, whether the quality assurance system has been certified by a certification unit, whether a clear quality goal and plan have been formulated, and whether the quality assurance system is effective. Quality control of engineering materials. Check whether the contractor has formulated a material inspection and inspection system according to the provisions of the design drawings and the requirements of the contract, and strictly control the quality of material procurement and ordering, material entry and material use in practical work. Review the detailed rules for the implementation of supervision planning and supervision work. The owner's wishes should be realized through the supervision engineer. The quality of supervision work is directly related to the quality of supervision planning and implementation details. Often go to the site to understand the situation, and at the same time supervise and inspect the daily supervision work of the supervision engineer. Special emphasis is placed on the investigation and study of the existing construction site.
3, schedule control
Schedule control is one of the key factors for project success. What the engineering department should do is to prepare the project management plan, study the overall progress, construction layout, main construction technologies and construction problems of the project, and make plans for possible problems in the project implementation process. Formulate a system, standardize management and improve work efficiency.
4. Strengthen the management consciousness of all employees.
Many people mistakenly think that project development is only the business of the engineering department and the sales department, and has little to do with their own departments. In fact, project development is quite complicated. It combines the wisdom and sweat of various departments, and it is not as simple as development and sales. Therefore, as employees of the company, we should firmly establish the consciousness of full-time management and devote ourselves to the work with the spirit of being masters.
20xx years have passed, and although the project has not been formally completed, it has gained a lot. In particular, the solid work style and serious and responsible attitude of several leaders of the company set an example for our employees. Summing up the past and looking forward to the future, it is also a challenge for me to have a lot of work and heavy tasks in 20xx. In the new environment, new opportunities and new challenges, how to build this project with high quality, high efficiency, low consumption, safety and civilization on schedule is a subject that civil engineers should think about. In the future work, as the vanguard of project development, I will conscientiously implement the relevant regulations of the company, give full play to my subjective initiative, restrain myself with iron discipline, constantly learn new technologies and experiences, and be good at summing up. I also hope that the company leaders can give me more understanding and support, and strive to contribute to the development of the project.