Home renovation contract Electronic Edition

Electronic version of family renovation contract template (selected 10)

With the continuous improvement of laws and regulations, people pay more and more attention to contracts, and there are more and more types of contracts. Signing a contract is an important measure to reduce and prevent disputes. So what problems should we pay attention to when drawing up the contract? The following is the electronic version (selected 10) of the family renovation contract template carefully compiled by Bian Xiao for reference only. Let's have a look.

Home renovation contract Electronic Edition 1

Employer (Party A):

Contractor (Party B):

In view of the needs of the actual situation of home decoration, according to the Contract Law of People's Republic of China (PRC) and the Regulations of the Ministry of Construction on the Management of Building Decoration, and in combination with the specific conditions of this project, Party A and Party B have reached the following contract terms through consultation, and both parties will consciously abide by them.

I. Overview of the Project

1. Project name: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

2. Decoration construction site: room: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

3. House structure: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

4. Decoration construction content: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

5. Contracting method: _ _ _ (contracting for work and materials, partial contracting).

6. Total price: RMB _ _ _ _ _, in words (RMB _ _ _): Material cost: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

7. Construction period: from _ _ _ _ to _ _ _ _ _ _, the construction period is _ _ _ _ days. In case of force majeure, the construction period must be extended.

Second, the material confirmation

1. All materials of this contract project shall be uniformly distributed by Party B according to the requirements of the budget table. Except the materials purchased by Party A according to the contract, Party A shall not purchase them without authorization, otherwise it will be regarded as a breach of contract.

2. The materials provided by Party A cause some or all engineering joint problems due to quality problems (some materials can only be inspected after installation and use), and the consequences shall be borne by Party A.. In case of maintenance or redecoration, all expenses shall be borne by Party A, and the construction period shall be postponed.

3. Party A is responsible for supplying materials, facilities and appliances. Party A shall timely purchase and deliver the goods to the construction site as agreed in the contract, and the expenses for handling and loading and unloading shall be borne by Party A. If the project fails to affect the construction period as agreed, it shall be postponed.

4. If the unqualified materials provided by Party B cause quality problems, Party B shall bear joint and several liabilities, replace the materials or compensate for the losses.

Third, water and electricity supply.

Before the construction of this project, Party A shall provide Party B with the detailed drawings of the original water and electricity structure of the house, and be responsible for the water and electricity costs incurred during the construction. Since the renovation period cannot be interrupted, Party A must ensure the smooth flow of water and electricity.

Four. Increase, decrease and change of projects

1. During the construction, if Party A needs to modify the design scheme or add engineering projects, it must contact Party B three days in advance, and Party B will arrange the construction after it is signed and approved by both parties.

2. After the project contract comes into effect, both parties shall not make an excuse to reduce the renovation project, otherwise it will be regarded as a breach of contract.

Verb (abbreviation of verb) Determination of item and unit price

1. The specific renovation project and its unit price of this contract project must be signed and confirmed by both parties, and both parties shall not change it without authorization.

The payment method and final settlement of intransitive verbs

1. On the effective date of this contract, Party A shall pay 50% of the total renovation project cost to Party B..

2. Party A shall voluntarily deliver the project payment to Party B's finance department according to the date stipulated in the contract, and Party B shall issue a receipt.

3. Party A shall pay for the renovation of the project contract by cash or bank transfer. If Party A pays the project payment by transfer cheque, the construction period shall be calculated from the date when Party B cashes Party A's cheque, and the construction period shall be postponed accordingly.

4. If Party A has any additional projects (including hydropower reconstruction projects, etc.). During the renovation period, after being approved by Party B, Party A shall pay the project funds for the second phase and all additional projects at the same time. Otherwise, Party B has the right to refuse the construction of the additional project.

5. If there are missing items in the budget quotation, the construction items shall be supplemented according to the requirements of the construction site. After being signed and approved by both parties, Party A shall pay the second phase of the project and all additional projects at the same time. Otherwise, Party B has the right to refuse the construction of the additional project.

6. The final settlement of this contract project shall be subject to the project cost of the decoration project at the time of acceptance (including the total project cost of the changed project during construction). In case of any discrepancy between the final settlement and the pre-settlement list, the actual project price settlement shall prevail.

7. Payment date of project funds:

Pay 50% of the project payment on the date of signing the contract, with the amount of RMB;

Pay 45% of the project payment on the completion date of carpentry, with the amount of RMB;

5% of the project cost on the completion date of latex paint and wallpaper: _ _ _ _ _ yuan;

Remarks: Additional items such as water, electricity and carpentry will be paid together at the next payment.

Seven, project acceptance and delivery

1. Party B shall notify Party A orally three days before the completion acceptance of this project, and Party A shall attend the acceptance on time without an excuse. If, after completion, Party A fails to accept the project as agreed, and the time is more than two days, the project will be deemed as qualified, and both parties will not accept it again.

2. When both parties accept, Party A shall be present for acceptance. After the acceptance of the project, both parties sign the project acceptance form for confirmation, and settle the balance on the same day.

3. If after the completion of the project, Party A fails to pass the acceptance of both parties, or has accepted but not paid off the balance, then invite other decoration teams to do other things.

Eight, engineering decoration or installation, or unauthorized relocation of furniture and household appliances.

This project is deemed to have been accepted and will not be accepted again. At the same time, the above behavior of Party A is regarded as breach of contract, and Party B has the right to suspend the delivery of the project.

Nine, about the property management office charge commitment agreement.

1. The fees charged by Party A's property management office have nothing to do with Party B, and shall be settled or borne by Party A through consultation with the property management office.

2. If Party B violates the relevant regulations of the management office during the construction period, Party B shall bear the relevant responsibilities.

Force majeure factors

Force majeure factors refer to: power failure, water stoppage, typhoon, tropical storm, cracks in the house itself, water leakage quality problems and accidents. In case of force majeure during construction, the construction period can be postponed accordingly.

1, power outage for 5 hours per week, but the construction period may be extended by one day.

2. In case of typhoon, tropical storm or property coming to the community, it is required to stop work.

3. Any quality problems caused by force majeure are not covered by the warranty. If maintenance is needed, the expenses shall be borne by Party A..

XI。 Waterproof and leak-proof engineering

In view of the particularity of home decoration, Party B has "waterproof and leakproof" items in the kitchen, bathroom floor and project decoration budget. If Party A intentionally cancels the project, or requests to use the waterproofing agent provided by Party B without authorization during the construction process, and there are quality problems such as leakage after the project delivery (including quality problems caused by other decoration projects), Party A shall bear all responsibilities and consequences.

Twelve. Concealed works and renovation works

1. Concealed works: If there is any hydropower renovation project, Party A shall * * * arrive at the site in time to jointly measure with Party B after Party B completes the trench and pipeline laying, and sign for acceptance. If Party A fails to participate in the acceptance on time, or Party A participates in the measurement acceptance but fails to sign for confirmation, Party B may accept it by itself. If Party A requests re-inspection, Party A shall be responsible for the re-inspection fee and the resulting shutdown loss, and the construction period shall be postponed.

2. Decoration works: Party A is responsible for going through the formalities with the Property Management Office before any wall demolition, wall building, ground breaking, window opening, portal installation, air conditioning installation, fire-proof and burglarproof doors and windows, aluminum alloy doors and windows arrangement and pipeline decoration works. Thirteen. responsibility for breach of contract

After the contract comes into effect, if either party changes or terminates the contract, it shall promptly notify the other party to handle the contract termination procedures and compensate the other party for the loss of 20% of the total project budget.

Fourteen, engineering design drawings and confirmation standards, conditions and time

1. The standard of design drawings provided by Party B is _ _ _ _ _

A) renderings, floor plans and construction drawings;

B) If Party A needs the renderings, but Party B doesn't need the construction, Party B will charge extra fees, and the standard is 800 yuan/Zhang.

2. Conditions and time of construction drawings: _ _ _ _

A) After the contract is signed, Party A and Party B shall sign on each drawing for approval. If Party A fails to confirm the signing of the drawings, Party B will suspend the construction and postpone the construction period.

B) During the construction period, when Party A needs to modify the design drawings or add projects, and Party B needs to confirm and sign them, both parties shall sign a supplementary contract separately. After Party A signs the relevant drawings for approval and pays off the project funds for the added and modified projects, Party B will arrange the construction, and the construction period will be postponed accordingly.

C) Once the drawings are confirmed by both parties, if it is necessary to modify or change them, both parties shall agree. The increased project cost due to the modification or change of drawings shall be borne by Party A, and the construction period shall be postponed accordingly.

Fifteen, part of the project interim and initial acceptance agreement

In view of the fact that some projects involve acceptance in advance before other projects can be constructed, the following decoration projects in the budget list of this project can be completed and accepted separately, and the specific acceptance time shall be notified to Party A by Party B two days in advance. Single completion and single acceptance of the project are:

1, hydropower transformation

2. Woodworking gland

3. Oil workers color matching

After the acceptance, both parties shall sign the acceptance sheet for confirmation, so that Party B can carry out the next project construction.

Sixteen. other terms

1. Before construction, Party A and Party B shall go through the relevant construction access procedures at the management office. When the construction of public parts is involved, Party A is responsible for coordinating the relationship between the neighborhood and the property management office to ensure the normal construction of Party B, and the relevant expenses shall be borne by Party A..

2. In order to ensure the construction and completion of the project, Party A shall designate a specific person as its representative, who shall be responsible for performing the contract, supervising the quality and progress of the project, confirming all drawings, and handling other matters such as acceptance, alteration and registration procedures. In order to avoid Party B being at a loss, other family members of Party A shall not participate in the above work.

Seventeen. supplementary terms

1. Matters not covered in the terms of this agreement shall be settled by both parties through negotiation, and a supplementary agreement shall be signed as an annex. The supplementary agreement shall have the same effect as this contract and shall come into force as of the date of signature by both parties.

2. Party A and Party B should solve various problems in the construction through friendly negotiation to safeguard the interests of both parties. If negotiation fails, it may apply to the people's court for a ruling.

3. This contract is made in duplicate, each party holds one copy, and it will become invalid after the project payment is paid.

Party A (official seal): _ _ _ _ _ _

Party B (official seal): _ _ _ _ _ _

Legal representative (signature): _ _ _ _ _ _

Legal representative (signature): _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Home renovation contract Electronic Edition 2

Employer (hereinafter referred to as Party A):

Contractor (hereinafter referred to as Party B):

Based on full consultation between Party A and Party B, compliance with relevant national laws and regulations, and combined with the specific conditions of this project, this contract is hereby signed and abided by both parties.

I. Overview of the Project

1. Project name: _ _ _ _ _ _ _ _ _ _ _

Construction site: _ _ _ _ _ _ _ _ _ _ _ _

2. Project content: See the construction drawing and project budget for details.

3. Scope of this project: contracting, materials, construction period, quality, safety and civilized construction.

4. The construction period of this project is days (calendar days), from year month day to year month day.

Second, the project quality and acceptance criteria

According to the drawings, design requirements and construction acceptance specifications, procedures and quality inspection standards issued by the state.

Three. Contract price and payment method

1. Estimated total cost of this project: (in words) _ _ _ _ _ _ _

See the project budget table for details of the project cost. If there are additional items, both parties will negotiate separately.

2. Payment method:

(1) From the date when this contract is signed and the site starts construction, it shall be paid according to 45% of the total project budget cost.

(2) Pay 40% of the total project budget cost after carpentry is completed.

(3) The painter enters the site and pays 10% of the total budget.

(4) After the completion acceptance, pay the remaining 5% of the project payment in one lump sum.

Four. Party A's responsibilities

1. Provide a complete construction site, coordinate the relationship between various departments and neighbors, and ensure the smooth progress of the project.

2. Provide Party B with water supply and power supply during the construction period.

3. Be responsible for reviewing the drawings and signing them for approval as the basis for construction. Otherwise, Party B has the right not to carry out the construction and the construction period will be postponed. If the project is changed or added, both parties shall negotiate to adjust the construction drawings, project cost and construction period, otherwise Party B has the right not to modify or change or add.

4. Be responsible for the acceptance of concealed works before concealment.

5. Organize the acceptance work in time after the completion of the project.

6. Pay the project progress payment to Party B in time according to the provisions of Article 3 of this contract.

Verb (abbreviation of verb) Party B's responsibility

1, in strict accordance with the drawings approved by Party A. ..

2. Fine construction operations shall be carried out in strict accordance with the relevant specifications of engineering design to ensure the quality and safety of the project.

3. Actively cooperate with Party A to do a good job in environmental health and safety, and abide by the relevant management system of the community.

4. Be responsible for the whole project budget, determine the quality of materials needed for the project, and purchase materials in strict accordance with the quality standards listed in the project design plan.

5. Be responsible for timely cooperating with Party A to complete the project completion acceptance.

6, the construction site as scheduled, completed on schedule.

Liability for breach of contract of intransitive verbs

1. If the construction period is delayed or stopped halfway due to Party A's reasons, it must be signed and agreed by Party A or its authorized person, and the construction period will be postponed. If Party A fails to pay the project progress payment as agreed in the contract, it shall pay the overdue fine according to the payable amount for each day overdue.

2. If the completion is overdue due to Party B's reasons, the liquidated damages shall be paid according to the payment amount for each day overdue.

3. If the contract cannot be continued due to one party's reasons, it shall notify the other party to handle the contract termination agreement, and the responsible party shall compensate the other party for the resulting economic losses.

Seven. Warranty regulations

1. The warranty period of the project shall be implemented in accordance with relevant state regulations. In case of quality problems during the warranty period, Party B shall be responsible for free maintenance, except consumables (such as handles, door locks, bulbs, lamps, faucets, etc.). ). If the quality problems caused by Party A's improper use or intentional damage are not covered by the warranty, Party B can assist in the maintenance, and the expenses shall be borne by Party A. ..

Eight. safe

1. During the period from project construction to project delivery, Party A's personnel (except site representatives and supervisors) shall not enter the construction site without the permission of Party B's on-site project management personnel, otherwise Party A shall be responsible for personal safety or other safety accidents. If personnel other than Party A enter the construction site without authorization, causing personal safety or other safety accidents, Party B shall be responsible.

2. In the process of construction, Party B shall be responsible for the loss of personnel safety or construction in progress due to its illegal construction and violation of operating procedures.