Emergency plan for heavy rain
2021 Heavy Rain Emergency Plan (6 general articles)
In real life, study, work, and life, we will encounter some unexpected events or accidents. In order to reduce the hazards To keep it to a minimum, always prepare an excellent emergency plan in advance. What are the characteristics of an excellent emergency plan? Below is the 2021 heavy rain emergency plan I compiled for you (6 general articles). You are welcome to learn from and refer to it. I hope it will be helpful to everyone.
Heavy rain emergency plan 1
1. Purpose
In order to ensure the personal safety of employees, the company’s property safety, and defense plans, countermeasures and measures should be formulated in advance. Various typhoons and heavy rains. When there are typhoons and heavy rains, the company's emergency leadership team's safety work is commanded, decided and dispatched according to the plan, and wind prevention, rain prevention rescue and disaster relief are strengthened. The initiative and predictability of typhoon and rainstorm prevention work can enable more reasonable and scientific command, thereby reducing the economic losses caused by typhoon storms and rainstorms. This plan is applicable to abnormal weather such as typhoons, heavy rains, lightning, strong winds, etc. According to the guiding ideology of the "XX City Special Natural Disaster Rescue Emergency Plan" and the actual situation of the company, this plan is specially formulated.
2. Organizational Structure and Responsibilities
1. Typhoon and Heavy Rain Prevention Leading Group:
Commander-in-Chief: xx.
Deputy Commander: xx.
Team members: xx.
(The above-mentioned leadership group members are composed of all staff of the General Affairs Department and heads of various departments. If there are any adjustments to the work location, the plan to prevent typhoons and rainstorms will begin.
The person in charge of the position will Automatically assigned, no need to change files
2. Responsibilities:
xxx (responsible for task allocation of various departments)
xxx (responsible for information contact)
xxx (responsible for the inspection and protection of mechanical equipment in the manufacturing department workshop)
xxx (responsible for the safety of company buildings)
xxx (responsible for coordinating the work of various departments)
xxx (responsible for employee safety)
Safety team leader (responsible for surrounding environment monitoring)
3. Plan start:
Received the typhoon rain from Zhuhai Meteorological Observatory Early warning signal, this plan is officially launched
3. Procedures
1. Report:
When the personnel and general affairs department receives typhoon information from the meteorological department or superior. and heavy rain, they should report to the general manager for the first time (when the general manager does not report to the deputy general manager), and the general manager convenes a meeting for the safety emergency response leadership group to initiate the safety emergency plan
2. Organization. and implementation:
(1) After the emergency plan is activated, the safety emergency leadership team should go to the front line to supervise the implementation of relevant work.
(2) The competent department should evacuate employee safety. The area is arranged in accordance with the company's requirements and the company's unified arrangements to avoid casualties. Employees who cannot go to the company will find ways to notify them to stay in a safe place.
(3) After the company decides to resign, the company will notify the employees to stay in a safe place. The personnel of the General Affairs Department are responsible for the return transportation arrangements for employees.
(4) If the company is indeed detained for special reasons, the personnel of the General Affairs Department should make arrangements for the employees, and the company should ensure the safety of the employees.
(5) Pay close attention to the progress of typhoons and heavy rains, maintain smooth communication 24 hours a day, and report and convey disaster situations in a timely manner so that all types of personnel can be deployed in an emergency to minimize losses.
< p> (6) When a disaster occurs, the company should arrange 24-hour on-duty personnel to deal with emergencies.(7) After the disaster occurs, it should promptly summarize and report the disaster to relevant departments and business partners. Impact on the company. Organize losses and notify insurance companies in a timely manner
3. Before the arrival of typhoons, heavy rains and other abnormal weather:
(1) Strengthen inspections to eliminate safety hazards.
(2) Close doors and windows, remove or reinforce fallen objects such as window sills and roofs.
4. Staff dormitory No. 1 is supervised by Tan xx;
< p> 5. Dormitory Building No. 2 is supervised by Huang xx;6. The office building (including the canteen) is managed by civilian staff;
7. The workshop is supervised by xx. Heavy Rain Emergency Plan 2
In order to further carry out emergency response work for natural disasters such as high temperature seasons, heavy rainfall, rain and snow, and prevent major losses to the lives and property of the needy elderly and staff in nursing homes, this is specially formulated this emergency plan.
1. Emergency organization structure
1. Extreme weather emergency working group
Team leader: xx
Deputy team leader: xx < /p>
Team members: Responsibilities of each team leader and team members:
(1) Do a good job in daily inspections, implement the safety production responsibility system, and guard against extreme weather (high temperature, heavy rainfall, rain snow).
(2) Once extreme weather (high temperature, heavy rainfall, rain and snow) causes large-scale power outages and other accidents, relevant emergency work should be done in a timely manner and power supply should be restored as soon as possible.
(3) Decide whether to activate the emergency plan based on the impact of extreme weather (high temperature, heavy rainfall, rain and snow).
(4) Report the disaster situation to superiors in a timely manner and take effective measures to actively respond.
(5) Request external support when necessary.
(6) All members should perform their duties and responsibilities under the unified command of the team leader, and work together to prevent extreme weather.
2. Extreme Weather Emergency Rescue Team
Captain: xx
Member: xx
Responsibilities:
(1) Strengthen safety inspections of power distribution rooms, fire protection systems, circuit systems, and water and electricity rooms on a daily basis.
(2) When extreme weather (high temperature, heavy rainfall, rain and snow) simultaneously triggers a disaster, organize personnel to carry out rescue operations.
(3) Report the consequences of extreme weather (high temperature, heavy rainfall, rain and snow) to the natural disaster emergency team in a timely manner.
(4) Summarize the emergency response work experience afterwards.
(5) In the event of extreme weather (high temperature, heavy rainfall, rain and snow), promptly organize the transfer of the elderly in the hospital to a safe area to ensure the safety of the elderly in the hospital.
2. Emergency Procedures
1. Emergency Procedures for Nursing Homes
(1) In the event of extreme weather (high temperature, heavy rainfall, rain and snow), emergency response procedures should be carried out quickly Take appropriate emergency measures.
(2) Timely report to the leader of the natural disaster emergency working group (notify the general leader at night), and report specific disasters (such as lightning strikes and fires, lightning strikes and power outages) caused by natural disasters (high temperature, heavy rainfall, rain and snow) , equipment failure caused by lightning strikes, floods, etc.).
(3) If during normal working hours, if time permits, the office should notify various departments by phone and other forms to actively organize responses and try to avoid unsafe incidents.
(4) If time is urgent, the leader of the natural disaster emergency working group should be reported immediately (notify the general leader at night), explain the detailed situation, issue a notice to all departments, and promptly arrange for the nursing team to properly arrange for the elderly to do Do a good job in avoiding risks. In the event of a strong thunderstorm, all teams should be reminded to cut off the power of electrical equipment to prevent lightning strikes from damaging the equipment.
(5) If extreme weather causes floods, personnel should be organized immediately to fight the floods.
2. Emergency procedures for each team
(1) After receiving notification of natural disasters (high temperature, heavy rainfall, rain and snow), each team should, if permitted, turn off all electricity The power supply to the equipment must be cut off first and then put into use after the weather returns to normal.
(2) After receiving notification of natural disasters (high temperature, heavy rainfall, rain and snow), immediately prepare for fire prevention, flood prevention, and power outage prevention.
(3) In the event of a power outage caused by a sudden natural disaster (high temperature, heavy rainfall, rain or snow), each team should be notified immediately to turn on emergency lighting, activate backup power in a timely manner, and promptly notify the electrician or person on duty Actively cooperate with disposal.
(4) Strengthen inspections of the elderly’s rooms, comfort the residents, and pay attention to fire prevention, flood prevention, and electric shock prevention.
3. Safeguard measures
1. The office strengthens self-examination and self-correction of safety hazards in the hospital, and solves problems immediately when problems are found.
2. Safety officers implement a 24-hour duty system to ensure that they are on call 24 hours a day.
3. The service room is regularly equipped with emergency lights, flashlights and other lighting supplies, which should be inspected regularly and kept in good condition.
4. The medical office strengthens daily management, keeps emergency calls open, and is equipped with sufficient treatment drugs.
5. The office should organize emergency response drills for extreme weather (high temperature, heavy rainfall, rain and snow). Through the drill, everyone will be familiar with the emergency response procedures for extreme weather (high temperature, heavy rainfall, rain and snow). , to ensure the safety of life and property of all personnel in the nursing home. Heavy Rain Emergency Plan 3
In order to prevent heavy rains, thunderstorms and other severe weather, prevent possible flood disasters, and ensure the personal safety of teachers and students and campus property, this emergency plan is formulated based on the actual situation of our school.
1. Guiding ideology
Prevent accidents, ensure personnel safety, and reduce property losses.
2. Scope of application
Heavy rain, thunder and lightning, strong wind and other severe weather.
3. Preparation work
1. Before the heavy rain comes, carefully check the condition of the school building to see if the roof is leaking and the walls are exposed to rain. Clean the sewer pipes, ditches and other drainage facilities. Problems are repaired promptly.
2. Educate teachers and students on safety knowledge against heavy rain, lightning and floods, so as to prepare for rainy days.
3. Check the surrounding environment of the school to prevent accidents in the school caused by external reasons.
4. Check circuit equipment to prevent accidents caused by water splashing.
5. The division of labor is in place and personnel and responsibilities are implemented.
6. Check the water and river embankment area around our school, formulate flood prevention arrangements, and prepare personnel and equipment;
7. Determine evacuation routes and resettlement locations in emergency situations , organize teachers and students to carry out self-rescue, mutual rescue, and escape drills.
5. Emergency measures
1. Pay attention to the weather forecast. In case of severe weather or entering the flood season, each school must be on duty 24 hours a day, and all personnel should keep communications open 24 hours a day so that they can be on duty in an emergency. All types of personnel can be deployed in a timely manner under certain circumstances.
2. During heavy rain periods, school duty personnel and patrol personnel should frequently patrol throughout the school. If any danger is discovered, they should immediately report to the leader on duty and initiate emergency procedures.
3. In strong lightning weather, school personnel and distance education equipment must be protected from lightning.
4. Once danger occurs in the school building, students should be quickly organized to evacuate and move to safe areas in an orderly manner. Teachers must first ensure the personal safety of students.
5. Timely deliver information and report the situation to relevant departments and parents through campus radio, telephone, school newsletter and other media and communication tools.
6. Pay attention to the road conditions of students going to and from school. If the roads are damaged or there are safety hazards and students cannot go home, the school should properly accommodate the students and contact parents in time.
7. In accordance with the requirements of superior leadership, organize personnel in a timely manner and implement various preparatory measures.
6. Work Requirements
1. We must attach great importance to it ideologically, and in the spirit of being responsible for the cause of the party and the people, we must overcome paralysis, laxity, and carelessness, and conscientiously do a good job in all aspects. Prepare.
2. The work must be well implemented and the division of labor and responsibilities must be clear.
3. The organization must be coordinated and effective to ensure the smooth flow of government orders. Heavy Rain Emergency Plan 4
In order to ensure that when a destructive heavy rain occurs in the mineral processing plant, all emergency work can be carried out efficiently and orderly, and to minimize casualties and property losses, according to the State Council's "Damage Occurrence" "Regulations on Earthquake Heavy Rain Emergency" combined with the actual situation of our factory selection work, this specially prepared plan
1. Composition of emergency agencies
1. Leading group
Factory selection prevention Heavy rain disaster work is organized and implemented under the leadership of the superior heavy rain disaster prevention and reduction leading group. The leading group for rainstorm prevention and disaster reduction in the plant selection is headed by the factory director, with the deputy director and section chiefs as team members, and the dispatching department in the plant selection as the headquarters.
2. Main Responsibilities
( 1) Strengthen leadership, improve organization, strengthen work responsibilities, strengthen familiarity and understanding of destructive heavy rains and heavy rain disaster reduction work, and improve the formulation of various emergency plans and the implementation of various measures
(2) Make full use of various channels to carry out publicity and education on earthquake disaster knowledge, organize and guide the popularization and education of full-length earthquake prevention and earthquake resistance knowledge, extensively carry out self-rescue and mutual rescue training in earthquake disasters, and continuously improve the awareness and basic skills of earthquake prevention and resistance among employees.
(3) Seriously do a good job in all material support, actively prepare in strict accordance with the requirements of the plan, implement food and drinking water, anti-freeze and rain, emergency equipment and other materials, and strengthen management to always maintain good combat readiness
p>
(4) After the destructive heavy rain occurs, take all necessary means and organize all forces to comprehensively carry out disaster reduction work to minimize the losses caused by the disaster
(5) Schedule all active efforts factors, quickly restore production order, and fully guarantee the stability of production and employees' lives
2. Earthquake emergency response
1. After receiving the heavy rain or impending rain warning (warning) from superiors , the leading group immediately entered a war-ready state, issued relevant news and warnings in accordance with the law, and was fully responsible for various earthquake relief work.
All relevant organizations are ready to carry out rain prevention and disaster reduction tasks at any time
2. Organize relevant personnel to conduct comprehensive inspections of their buildings, block and close dangerous places, and stop various large-scale activities
3. Strengthen the management of flammable and explosive items, toxic and harmful chemicals, strengthen the protection of important equipment and places in large boilers, power transmission rooms and hangars, and ensure the smooth progress of earthquake relief and disaster reduction:
4. Increase the Promote and educate employees, and do a good job in stabilizing the ideological stability of employees
5. Strengthen various types of duty duties, maintain smooth communication, timely grasp the situation at the grassroots level, and make every effort to maintain the order of factory production and life
6 , Implement various material preparations according to the plan
3. Post-earthquake emergency operations
1. Regardless of whether there is a forecast or warning, after destructive heavy rains occur in the area or adjacent areas, , the leading group immediately went to the local command post, and all rescue and disaster relief teams must assemble in the unit and be on standby within one hour after the earthquake
2. The leading group, under the unified organization and command of the superior, quickly organized plant selection rescue and disaster relief< /p>
(1) Quickly issue an emergency alarm (continuous rapid bells and shouts), and organize the evacuation of all personnel still stranded in various buildings:
Employees in each section should be informed by the section leader The deputy section chief’s organization entered the rain shelter
(2) Quickly close and cut off the bookstore (except for the emergency lighting system) to prevent other disasters after the heavy rain
(3) Quickly carry out On-site rescue work is the main content of rescue personnel, and the injured persons are promptly transferred and sent to the attached rescue station for rescue
(4) Strengthen the protection of important facilities and important items.
3. Actively carry out ideological propaganda and education work among employees, eliminate panic, stabilize people's hearts, quickly restore normal order, and make every effort to maintain social security and stability
4. Quickly understand and master The disaster situation of the dressing plant shall be summarized and reported to the company office in a timely manner
4. Others
1. After entering the emergency state of heavy rain, the plant dressing headquarters will issue various orders and instructions through various methods , The leading group for earthquake prevention and disaster reduction will convey various orders and instructions through telephone, dictation, etc.
2. In the emergency operations for earthquake disaster reduction, we must cooperate closely, obey the command, and ensure the smooth flow of government orders and the implementation of various tasks. Heavy Rain Emergency Plan 5
1. Purpose:
Before the natural disaster of typhoon and rain comes, make various emergency preparations in advance, quickly and effectively control the situation and handle it properly, so as to prevent the typhoon and rain. Possible losses are minimized.
2. Start of the plan:
After receiving the typhoon and rain warning signal issued by the Zhuhai Meteorological Observatory, the plan was officially launched.
3. Organizational structure:
(1) Typhoon and rain prevention leading group:
Team leader: Su Ying
Deputy team Chairman: Li Jian, Wu Jinhui
Members: Long Qinglan, Ding Hongbing, Hu Zhiguo, Peng Weicong, Tang Zhiqiang, Lu Shan
(2) Typhoon and Storm Prevention Working Group:
1. Engineering team:
Team leader: Lu Shan
Team members: All employees of the engineering department
2. Equipment team:
Team leader: Ding Hongbing
Team members: All employees of the equipment department
3. Security mobile team:
Team leader: Hu Zhiguo
< p> Team members: All security team members4. Administrative logistics team:
Team leader: Long Qinglan
Team members: Tang Zhiqiang, Peng Weicong, Bai Zhijie, Yin Ge, Cai Li
4. Responsibilities:
(1) Responsibilities of the leading group for typhoon and rain prevention work:
1. Responsible for typhoon and rain prevention work Organize, coordinate, supervise, inspect and other comprehensive work.
2. Commander-in-Chief Su Ying is responsible for overall work; Deputy Commander-in-Chief Li Jian is in charge of the security maneuver team and administrative logistics team; Deputy Commander-in-Chief Wu Jinhui is in charge of the engineering team and equipment team.
(2) Responsibilities of each typhoon and rain prevention working group:
1. Engineering team:
Responsible for supervision, construction and other units within the scope of work under its jurisdiction comprehensive work such as arrangement, inspection and coordination of typhoon and rain prevention work.
Responsible for the implementation of reinforcement, protection, drainage and waterlogging prevention work for buildings and equipment and facilities at the construction site.
Responsible for the organization, inspection, and implementation of personnel evacuation from the construction site.
Responsible for organizing an emergency rescue mobile team composed of construction units to be on standby at any time. As a reserve team for handling emergencies, it is directly dispatched by the leadership team.
2. Equipment Group:
Responsible for the layout, inspection and coordination of typhoon and rain prevention work for supervision and construction units within the scope of their jurisdiction.
Clarify the key work content of typhoon and rain prevention work and report it to the leading group.
Responsible for implementing the reinforcement, protection, drainage and waterlogging prevention work of buildings and equipment facilities at the construction site under the jurisdiction of the Equipment Department.
Responsible for the organization, inspection and implementation of evacuation of personnel from the construction site under the jurisdiction of the Equipment Department.
3. Security Mobile Group:
Responsible for the security and protection work within the jurisdiction, and make emergency adjustments to fixed posts and patrol posts.
Responsible for the preparation of necessary emergency supplies.
Responsible for the acceptance and inspection of typhoon and rain prevention reinforcement and evacuation work within the jurisdiction.
Responsible for coordinating relevant working groups to deal with detected safety hazards.
Responsible for the rescue work of personnel during rescue operations.
4. Administrative logistics team:
Responsible for collecting the latest typhoon and rain warning information in a timely manner and announcing the start and end of the plan.
Summarize the key areas for typhoon and rain prevention reported by each working group and report to the work leading group.
Responsible for the organization, coordination, inspection and supervision of administration and logistics.
Responsible for arranging food and accommodation for evacuees and staff.
Responsible for the vehicle dispatch of the administrative fleet and arranging emergency vehicles for rescue.
Contact the medical rescue agency to coordinate and arrange medical personnel.
Responsible for the coordination of various working groups.
Responsible for the inventory of people, property and property after the typhoon.
Responsible for insurance claims settlement.
5. Evacuation location: Park administrative building, staff dormitory
Job responsibilities:
1. Safety Committee Office: Responsible for organizing various prevention and rescue work.
2. Administrative and Human Resources Department: Responsible for collecting the latest typhoon and rain news in a timely manner, announcing the activation and recovery of the plan, and overall coordination of wind prevention emergencies and subsequent handling.
3. Security Brigade of the General Affairs Department: Responsible for emergency rescue, guidance, site protection, and assisting relevant departments in handling typhoon disaster accidents.
4. General Affairs and Market Service Office: Responsible for rescuing injured persons in typhoon and rain disasters and arranging vehicle use in rescue accidents.
5. Equipment Department: Responsible for the inspection and maintenance of equipment safety in the park and the elimination of equipment hazards.
6. Engineering Department: Responsible for water and electricity treatment in emergencies; protection of scenic spots and facilities and repair of damaged parts; treatment of trees, flowers and grass. 7. Finance Department: Responsible for handling insurance claims.
8. Other departments: Prepare emergency measures to prevent typhoons and rainstorms according to the scope of the department's responsibilities. In principle, the personnel will be arranged by the heads of each department to assist in handling natural disasters.
6. Work procedures
1. After receiving the typhoon and rain notice from superiors or relevant units, the Administrative and Human Resources Department and the Safety Committee Office will immediately report it to the relevant leaders and convey it to all departments.
2. The Administrative and Human Resources Department, Security Brigade, Engineering Department, General Affairs Department, Tourist Department, Operations and Catering Department, Finance Department, Equipment Department, Art Troupe and related departments have established a typhoon and rain prevention working group, and the General Manager’s Office The leader on duty serves as the commander-in-chief. Managers of each department organized and established emergency response teams to lead their departments in implementing emergency measures to combat typhoons and rainstorms.
3. All employees can recognize the signals and meanings of typhoon and rainstorms. After receiving the notice, each department should immediately organize its employees to do preventive work against wind and floods.
4. All departments and offices should organize employees to inspect scenic area facilities, reinforce and tie up boats that are rushing through the rapids, and park tour buses and cruise ships in safe locations.
5. The administrative fleet of the General Affairs Department arranges ambulance or emergency vehicles, and the medical office is responsible for rescuing the injured.
6. If there is an intensification of strong wind signal, typhoon red signal or red rainstorm forecast signal in the typhoon and rain signal, the security brigade should organize a voluntary rescue team of more than 15 people to be on standby at the post and be there at any time. As a mobile force to resist typhoon and rainstorms.
7. If a typhoon or rainstorm comes during the opening of the park, the tourist department will use the radio to inform tourists to pay attention to safety after receiving the notice from the administrative and human resources department. Security guards of the security brigade and personnel in various positions in the park should pay close attention to the safety of tourists, buildings, and facilities in the scenic area, and report any situation immediately.
8. The leader of the general manager’s office will decide whether to close the park early based on the severity of the typhoon and rain. If the park closes early, the general manager on duty should notify the Tourist Department to broadcast to tourists that the park will close early due to the impact of typhoons and rains. Employees of the General Affairs Department, Tourist Department, Equipment Department, Engineering Department, Business and Catering Department, and Art Troupe should guide tourists to leave the park in the scenic area.
9. After the typhoon, the Administrative and Human Resources Department will coordinate. The General Affairs Department and the Finance Department should take photos and collect evidence, count the lost materials, and be responsible for handling insurance claims.
10. The Engineering Department and Equipment Department organized personnel to repair damaged building facilities and flowers and trees blown down by the typhoon and rain, and were responsible for cleaning up the site.
11. Departments and personnel with outstanding performance in preventing typhoon storms will be commended and rewarded in accordance with the "Employee Rewards and Punishment Regulations". Those who seriously neglect their duties and cause heavy losses and serious consequences will be held accountable in accordance with relevant regulations.
Heavy Rain Emergency Plan 6
In order to ensure that when heavy rain and flood disasters occur within the group area, the emergency response work can be carried out in a coordinated, efficient and orderly manner and to ensure the safety of people's lives and property, this plan is specially formulated.
1. Organizational structure
Established the XX Group Heavy Rain and Flood Prevention Emergency Response Leading Group, composed of the following members:
Team leader:
Deputy leader:
Members:
The leading group consists of seven working groups, an office and a supervision group.
Establish a leading group for emergency response to heavy rain and flood prevention office.
Establishing an inspection team for heavy rain and flood prevention and emergency work
2. Division of responsibility areas
Chen Qiming, Secretary of the Group Party Committee, General Manager, and Leader of the Leading Group for Emergency Prevention and Emergency Work The comrade is responsible for the overall work of the group's flood control and prevention of heavy rain and flood disasters; the first working group is responsible for the flood control and prevention of heavy rain and flood disasters of Hutouling Agricultural Trading Company; the second working group is responsible for the flood prevention and prevention of heavy rain and flood disasters of Huangjinshan Agricultural Trading Company; the third work The fourth working group is responsible for flood control and heavy rain flood disaster prevention work in farmers' markets, entertainment venues, Niutoushan residential areas, and Dahuchi residential areas; the fourth working group is responsible for flood control and heavy rain flood disaster prevention work in middle schools, primary schools, and hospitals; the fifth working group is responsible for The sixth working group is responsible for flood control and prevention of heavy rain and flood disasters in industrial and sideline units (including private enterprises); the sixth working group is responsible for flood prevention and heavy rain and flood disaster prevention work for Dongfeng and Hongqi Agricultural Trading Companies; the seventh working group is responsible for flood prevention and prevention of democratic agricultural trading companies and breeding farms. Preventing heavy rain and flood disasters; the heavy rain and flood prevention emergency response inspection team is responsible for supervising the implementation of measures to prevent heavy rain and flood disasters by seven working groups and secondary units. The Office of the Leading Group for Heavy Rain and Flood Prevention Emergency Response is responsible for coordination among various working groups and submission of materials. Each secondary unit establishes a corresponding leadership group to formulate work plans and clarify responsible areas, responsible personnel and work responsibilities.
3. Key points and work requirements for early warning and prevention
1. Strengthen safety management of middle and primary schools, comprehensively investigate and eliminate potential safety hazards that heavy rains and floods may bring to schools, especially Implement key monitoring of student apartments, teaching buildings, canteens, and toilets, as well as primary school teaching outlets, deal with hidden dangers in a timely manner, and report to the group's heavy rain and flood emergency response leadership group. When there are potential safety hazards in teaching buildings, school cafeterias, and student apartments, emergency repairs will be organized after classes are suspended.
2. Strengthen the safety monitoring of residents’ houses and villagers’ houses. Each working group implements the leadership responsibility system according to the area of responsibility, urges relevant units to clarify work responsibilities, formulate work plans, conduct comprehensive inspections of residents' housing and villagers' housing safety hazards village by village, household by house, and area by area, promptly inform residents or villagers of any discovered situations, and take measures to Corresponding measures will be taken to ensure the safety of residents and villagers. Pay close attention to the housing and auxiliary facilities of "five-guarantee households", "difficult households", "migrant households" and vulnerable groups, and help them eliminate safety hazards.
3. Strengthen corporate security monitoring. Comprehensively investigate potential safety hazards in the company's production areas, living areas and auxiliary work areas, and promptly rectify any problems found. If any unit fails to cooperate, it will be forced to suspend operations for rectification. There is a possibility of landslides on the mountain next to the third production line of Golden Phoenix Decorative Materials Company, urging companies to take corresponding measures. The construction projects under construction in Zhongke Industrial were suspended during heavy rains and floods. Yongheng Paper, Jiafeng Spices, Hengfeng Tea Factory, Food Factories, garment factories, building materials factories, rice processing plants and other enterprises all have safety hazards of varying degrees, and they must be investigated one by one to ensure the safety of their employees.
4. To ensure that Shantang Reservoir can safely survive the floods, Doumentang and Guishan Lake will be on duty 24 hours a day. When the water level reaches the warning line, the flood will be released in time. Shantang Reservoir is inspected every day to ensure both water storage and flood discharge.
5. Strengthen safety management in public places. The municipal management office monitors the safety of farmers’ markets around the clock and promptly reports any hidden dangers to the group’s main leaders and the rainstorm and flood prevention emergency working group. Internet cafes are closed when heavy rains are concentrated.
6. Strengthen the management of power supply facilities. The power company is fully responsible for the high-voltage lines and the low-voltage lines that have been taken over within the group area. The power-consuming units are responsible for the safety of electricity in the area. Each unit must do a good job in publicizing lightning safety knowledge.
4. Strict work discipline
Members of each working group must go deep into the area of responsibility to lead and supervise the relevant units in the area of responsibility to implement the work responsibility system. For accidents caused by absence, relevant leaders will be held accountable in accordance with the law.
5. Make duty arrangements and report the situation of heavy rain and flood disasters in the area as required
1. The group’s emergency duty room for heavy rain and flood prevention is located in the group’s guest house, with a contact number.
2. Each secondary unit will arrange personnel on duty from June 8 to June 11. The specific list of personnel on duty shall be reported to the group for filing. Report the disaster situation to the Group's Heavy Rain and Flood Prevention Emergency Duty Room at 10:30 am and 15:30 pm every day. Major disaster hazards should be reported to the Group's Heavy Rain and Flood Prevention Emergency Duty Room at any time and reported to the Group's main leaders.
3. The group’s emergency duty room for heavy rain and flood prevention and the duty rooms of each secondary unit must keep duty records for future reference.
and keep records clean and complete.
;