/kloc-what is the building area of 0/00 square meter? /kloc-how to decorate the 0/00 square meter building area?
/kloc-What is the building area and usable area of 0/00 square meter?
The ratio of usable area to building area is generally called occupancy rate. In general, the occupancy rate of multi-storey houses is 90-95%, the small high-rise buildings are 80-88%, and the high-rise buildings are 75-80%.
1. If it is the building area, it depends on the pool area of the developer.
The pool area is calculated according to the front of the house. The bigger the house, the bigger the swimming pool. The allocation coefficient of high-rise buildings is generally between 0. 18-0.26. The calculation method of shared area of residential buildings is: shared area = sharing coefficient of each unit's construction area (sharing coefficient = total construction area/total construction area of each unit participating in sharing). According to your building area, the pool area is between 5.76 and 8.32, that is, if the building area of your house is 100_, then the actual use area is between 96.24 and 93.68 (excluding the gift area).
2. If it is the interior area, the interior area is 100_, and the interior area is composed of interior usable area+interior wall area+balcony construction area.
/kloc-how to decorate the 0/00 square meter building area?
1, construction disclosure. The owner, designer and supervisor need to be present together to define the process, acceptance criteria and increase or decrease projects at the construction site. About half a day. Pay special attention. If necessary, disassemble and inspect items that need to be kept on site, such as air conditioners, furniture and electrical appliances. The owner needs to tell the foreman what to do with them.
2. It takes about 3-5 days to dismantle.
3. Water and electricity disclosure. If there is a water purifier, garbage disposal, etc. Cross together. If there is floor heating and fresh air, it is necessary to negotiate the order with the construction party. Note: Fresh air construction takes 2 days and floor heating construction takes 3 days. Cabinet measurement, heating renovation and window measurement can be done before disclosure, or before disclosure. About half a day.
4. Hydropower transformation. Pay attention to water and electricity slotting, air conditioning punching, and arrange construction if there is a wall-mounted toilet. During hydropower construction, bricks can be selected, windows can be changed and entrance doors can be measured. About five days.
5, water and electricity acceptance. Prepare to buy switch panels, as well as angle valves and floor drains. About half a day.
The above contents mainly describe the usable area of Bian Xiao 100 square meter. /kloc-how to decorate the 0/00 square meter building area? The construction area of real estate is mainly a point that determines the price of real estate. Because the policies are different now, the prices are very different. At the same time, the actual use area has also decreased, because some of it has been changed by the policy, which you should know.