Emergency plan for dealing with typhoon
Accidents happen from time to time in our study, work or life. In order to prevent things from getting worse, it is often necessary to prepare emergency plans in advance. Do you know what kind of emergency plan can really help us? The following are my emergency plans (6 in total) for dealing with typhoons. Welcome to read the collection.
1 Typhoon Emergency Plan aims to prevent and respond to the hazards caused by typhoons, further improve the company's typhoon (tropical storm) prevention work, establish a programmed, standardized and institutionalized typhoon prevention and response mechanism, ensure efficient and orderly typhoon rescue and disaster relief work, and minimize casualties and property losses. According to the Emergency Plan for Typhoon Prevention in Zhejiang Province and the Emergency Plan for Typhoon Prevention in Ningbo City, this plan is formulated in combination with the actual situation of our company.
1, working principle
1. 1, people-oriented, prevention first. Typhoon prevention work should focus on prevention, safety first, and the life of employees first. Be vigilant in times of peace, prevent problems before they happen, and combine prevention with resistance.
1.2, unified leadership and graded responsibility. Under the unified leadership of the company, the general manager is responsible for the typhoon prevention work, with unified command.
Cooperation and coordination at different levels and departments.
1.3, according to the law, scientific scheduling. In accordance with the People's Republic of China (PRC) Water Law, the People's Republic of China (PRC) Flood Control Law and other laws and regulations, we should standardize the typhoon prevention behavior, implement full participation, combine experts with groups, highlight key points, give consideration to the general, optimize allocation, and subordinate local interests to the overall interests.
1.4, rapid response, departmental linkage. When typhoons and secondary disasters occur, the emergency rescue teams of all departments act together to respond quickly and carry out prevention and emergency treatment in a timely and efficient manner. All departments of the company shall obey the unified command and dispatch of the typhoon and flood control headquarters of the company.
2. Focus of work
2. 1, organize employees to take shelter from the wind in time;
2.2. Organize the safe transfer of materials in key areas;
2.3, warehouse, dormitory, factory and low-lying areas of flood control and drainage;
2.4, do a good job in wind, rain, tide forecast, and timely release typhoon information to employees.
2.5. Typhoon Prevention and Flood Control Headquarters
Set up typhoon prevention and flood control headquarters, responsible for leading and organizing the company's typhoon prevention, emergency rescue and disaster relief work.
2.5. 1 typhoon prevention and flood control headquarters
The general manager is the commander-in-chief of the typhoon prevention and flood control headquarters (in the absence of the general manager, the assistant general manager, deputy general manager or other members of the command group may be entrusted). The members of the typhoon prevention and flood control headquarters are composed of the personnel administration department, the equipment department, the logistics department, the factory director and the person in charge of the procurement department.
2.5.2 Main responsibilities of typhoon prevention and flood control headquarters
The main duties of the typhoon prevention and flood control headquarters are: to implement the laws, regulations, principles and policies related to typhoon prevention (flood control) and the instructions and orders of the superior typhoon prevention and flood control headquarters; Prepare and improve the typhoon prevention plan; Check and urge all departments to prepare for typhoon (flood season); Organize typhoon prevention (flood season) inspection, and urge relevant factories and departments to deal with related problems that affect typhoon prevention (flood season) safety in time; Responsible for issuing flood notices, announcing the entry and lifting of typhoon warnings; Organize post-disaster disposal and do a good job in relevant coordination;
Emergency plan for dealing with typhoon 2 In order to do a good job in flood control and typhoon prevention in the factory, strengthen the emergency work mechanism for flood control and typhoon prevention in the factory, improve the ability to deal with disasters such as typhoon and rainstorm, minimize the losses caused by disasters such as typhoon and rainstorm, and ensure that the flood control safety and property of the factory are not damaged, this flood control and typhoon prevention work plan is specially formulated according to the requirements of the superior management department and the actual situation of our factory:
I. Organizational leadership and responsibilities
(a) the establishment of a leading group for flood control and typhoon prevention:
Team leader:
Deputy team leader:
Team members:
(two) the main responsibilities of the leading group:
The principle of unified command and graded responsibility shall be implemented in flood control and typhoon prevention work.
1, to convey the spirit of flood control and typhoon prevention at higher level and hold a mobilization meeting for flood control and typhoon prevention.
2, fully responsible for the supervision, command and coordination of city appearance and environmental sanitation flood prevention platform.
3. Improve the emergency plan for flood control and typhoon prevention in strict accordance with the "four-level" response requirements stipulated in the Shanghai Emergency Plan for Flood Control and Typhoon Prevention.
4. Organize and command the safe transfer of personnel.
5, command the rescue team, do a good job in flood prevention and typhoon rescue.
6, decided to flood control, typhoon rescue and other major issues.
During flood control and typhoon prevention, members of the leading group for flood control and typhoon prevention are on duty 24 hours a day to ensure smooth information, complete equipment and emergency personnel, facilities, equipment and materials in place.
(three) the establishment of flood prevention and typhoon emergency rescue team.
The leading group for flood control and typhoon prevention has an emergency rescue team for flood control and typhoon prevention to carry out emergency rescue work.
Second, establish a "four-level" response mechanism for flood control and typhoon prevention.
(1) 1 1 blue early warning mechanism
1. The leaders in charge of the factory are on duty 24 hours a day. The personnel on duty should strengthen their duty, closely monitor the water situation and disaster situation, especially the shed, roof, line and guide board, to ensure the normal work.
2, ensure smooth drainage, completes the information feedback report.
3, shed, roof, line, guide card, take defensive measures when necessary.
1 1 yellow early warning mechanism
1, the main administrative person in charge of the factory arrives at the post and is on duty 24 hours a day, so as to strengthen inspection, master the water situation and organize emergency rescue.
2, the deployment of power, the implementation of personnel and responsibilities, to do a good job of drainage.
3, strengthen the safety of the shed, roof electricity inspection, cut off the power supply when necessary, to ensure the safety of electricity.
4, to ensure smooth communication, grasp the water situation, the implementation of "zero" report.
Typhoon 3 emergency plan I. General rules
The purpose of compiling 1. 1
In order to prevent and respond to all kinds of disasters caused by typhoons, we will further improve our typhoon (tropical storm) defense work, establish a programmed, standardized and institutionalized typhoon prevention and response mechanism, ensure efficient and orderly typhoon prevention and rescue work, and minimize casualties and property losses.
1.2 compilation basis
According to the emergency plan for typhoon prevention in Zhejiang Province, the emergency plan for typhoon prevention in Shaoxing City and other plans, combined with the actual situation of our hospital, this plan is formulated.
1.3 Scope of application
This plan is applicable to the prevention and emergency treatment of typhoon disaster of Tiger Color in Shaoxing.
1.4 working principle
(1) People-oriented, prevention first. The typhoon prevention work adheres to people-oriented, safety first, and puts the life safety of employees in the first place; Be prepared for danger in times of peace, always be vigilant, plan ahead, and combine prevention with resistance.
(2) Unified leadership and graded responsibility. Under the unified leadership of the company, the chief executive shall be responsible for the typhoon prevention work, with unified command and graded responsibility.
(3) Respond according to law and make scientific dispatch. In accordance with the People's Republic of China (PRC) Water Law, the People's Republic of China (PRC) Flood Control Law and other laws and regulations, we should standardize the behavior of preventing Taiwan, implement full participation, combine experts with groups, highlight key points, take the overall situation into account, optimize allocation, and subordinate local interests to the overall interests.
(4) Rapid response and departmental linkage. When typhoons and secondary disasters occur, the emergency rescue teams of all departments act together to respond quickly and carry out prevention and emergency treatment in a timely and efficient manner. All departments should obey the unified command and dispatch of the company's typhoon and flood control headquarters.
1.5 work priorities
(1) Organize employees to take shelter from the wind in time;
(2) Organizing the safe transfer of materials in key areas;
(three) the safety of warehouses, workshops, pump houses, administrative buildings, carports and other facilities and flood control and drainage in low-lying areas;
(4) Forecast and early warning of wind, rain and tide, and timely release typhoon information to employees.
2 Organization and command system and responsibilities
2. 1 Flood Control and Drought Relief Headquarters
The establishment of the wind and flood control headquarters (hereinafter referred to as the District Flood Control Headquarters) is responsible for leading and organizing the typhoon prevention and rescue work in the whole region.
2.2 Anti-finger ingredients
The chief commander of finger prevention is the factory director, and the deputy commander is the manager of human resources department, the director of enterprise management department, the general affairs director and the security captain. The member departments of finger prevention are composed of production department, technology department, quality control department, equipment department, marketing department, finance department, enterprise management department, human resources department and purchasing department.
Typhoon 4 emergency plan I. General rules:
1, compilation purpose
In order to do a good job of typhoon prevention, deal with all kinds of disasters caused by typhoon in time, minimize all kinds of losses on my construction site, maintain normal construction and ensure the smooth progress of the project.
2. Scope of application
This plan is applicable to the prevention and emergency treatment of typhoon disasters within the construction scope of this bid section.
3. Working principle
Typhoon disasters are managed according to the construction area, with various functional departments and construction teams as the main disposal, and each functional department is responsible for the construction team. All functional departments actively support, guide and supervise the emergency response work of corresponding construction teams. It is necessary to put the prevention of typhoon disasters in a prominent link and do a good job in various preventive work. Carefully analyze the strong winds and rainfall that may be caused by typhoons. In case of danger, respond quickly, start this emergency plan in time, and organize personnel to do their best to rescue and provide disaster relief.
4. Focus of work
(1) Waterproofing, pit wall collapse prevention and rolling stone prevention shall be carried out at the construction site of each foundation pit excavation;
(2) Prevent landslides, collapses and other disasters that may cause accidents on the construction roads;
(3) the temporary construction site and the construction team site before the disaster personnel and equipment transfer;
(4) Prepare flood control and drainage facilities for material warehouses on the construction site;
(5) Safety protection measures for vertical transportation equipment, scaffolding and construction electricity;
(6) The living guarantee of each construction site and station during the gale and heavy rain;
(7) Forecast, forecast and early warning of typhoons and rainstorms, and timely release typhoon early warning information to the construction team and the construction site.
Second, the leading group for flood control and typhoon prevention:
The project department set up a leading group for flood control and typhoon prevention with unified command, and each department was responsible for each construction team.
Leader of the leading group:
Deputy team leader:
Members:
Three. Prevention and early warning mechanism:
1, typhoon and other disasters monitoring
The safety team of the project department is responsible for the monitoring and information collection of typhoons, rainstorms, storms and mountain disasters, knowing the weather situation in advance, collecting all kinds of information on the base surface and traffic roads of each construction site in time and reporting it to the leading group.
2, the construction site safety inspection
Adhere to the safety inspection of each construction site, take the implementation of wind and flood prevention measures as the focus of inspection work, timely understand relevant information, and arrange personnel to deal with the base surface and roads that may cause harm in advance to avoid accidents when disasters occur.
3, the responsibility of the construction site early warning member to carry out.
Designate a part-time safety officer at each construction site to serve as a disaster early warning officer at the same time, mainly responsible for collecting and reporting all kinds of dynamic information at the construction site and notifying the leading group of instructions. When a disaster occurs, assist each construction team leader to implement disaster prevention measures and command.
4. Disaster early warning mechanism
The security team should establish a monitoring system for weather conditions and construction site conditions, implement information collection measures, adhere to the daily inspection system, and conduct encrypted observation and inspection in rainy season. Once dangerous signs are found, immediately call the police, transfer personnel and related equipment, and report to the leading group of the project department.
Fourth, emergency response:
The leading group of the project department is in full command, with full participation, and coordinates the participation of personnel from relevant departments.
The disaster monitoring department analyzes the development trend of typhoon according to the weather forecast, issues rainfall and wind forecast, puts forward defense targets and reports them to the leading group in time. According to the circular, the leading group made clear the defense objectives and key points, issued personnel transfer orders, declared an emergency flood control and wind prevention period, started this disaster prevention plan, sent special personnel to the affected areas to guide the work, organized and directed the rescue and relief work, reported the relevant situation to the relevant departments at higher levels in a timely manner, and reported it to the higher authorities to coordinate the deployment of medical and living materials assistance when necessary.
Verb (abbreviation for verb) for emergency rescue and disaster relief:
After the typhoon landed or was seriously affected, the disaster prevention leading group held a meeting on emergency rescue and disaster relief in time to deploy emergency rescue and disaster relief work. Organize all staff to rush to the disaster relief site, guide the rescue and devote themselves to the rescue and relief work.
(1) The team leader grasps and summarizes the disaster situation in time, coordinates the related work of emergency rescue and disaster relief, is responsible for the deployment of disaster prevention materials, completes the disaster prevention evaluation work together with relevant personnel, and reports to the construction headquarters and supervision department.
(2) According to their respective responsibilities, each team member shall organize the supply of materials and equipment needed for post-disaster recovery, and give priority to the supply of living materials for construction workers.
(3) Each construction team shall formulate the repair plan of the damaged construction site in time and organize the forces to repair it as soon as possible.
(4) The leading group should contact the local health department, organize forces to actively rescue the wounded and sick, and at the same time cooperate with government agencies to do a good job in quarantine and epidemic prevention in disaster areas to prevent the spread of the epidemic.
(5) Each construction team should organize forces to repair damaged roads and communication facilities, and do a good job in post-disaster production and self-help.
(6) Logistics personnel manage and distribute materials to ensure the supply of daily necessities.
(7) Contact the insurance department to make claims.
(8) After the typhoon, all construction teams and departments shall report the disaster to the leading group in time. After the disaster, the leading group should summarize the experience and lessons of flood fighting, disaster relief and disaster relief, and submit a written report to the engineering headquarters and supervision department.
(9) When the typhoon and disaster situation are effectively controlled, the leading group can announce the end of the emergency according to the information summary.
Six, emergency support:
1, supported by rescue team
All contractors within the scope of our project department are obliged to participate in typhoon prevention and disaster relief. Each construction team takes the team leader and safety officer as the backbone, and organizes all personnel to participate in disaster relief work when disasters occur.
2. Material safety
The Material Logistics Department should reserve necessary emergency materials for typhoon prevention for emergency use in case of major disasters.
3. Financial guarantee
Office to do a good job in the implementation of emergency rescue and disaster relief funds, when disasters occur, according to the instructions of the leading group, do a good job in the allocation and distribution of funds.
4. Communication and information security
Communication methods are mainly mobile phones and hand-held walkie-talkies. When the public telephone network breaks down, the application system of disaster prevention walkie-talkie will be started in time, and the fixed channel of notification will be used to ensure the smooth information channel.
5, medical and health security
The leading group should contact the local health department, be responsible for health and epidemic prevention and medical rescue in epidemic areas, prevent the epidemic of diseases, and do a good job in immunization and disinfection in public places.
6, typhoon relief work evaluation
After each typhoon, the leading group should summarize, analyze, qualitatively and quantitatively evaluate all aspects and links of typhoon prevention and relief work. Summarize experience, find problems, and further do a good job in preventing Taiwan from disasters.
Emergency plan to deal with typhoon no.5. Doing a good job in typhoon prevention in construction sites is of great significance to social stability and economic development. In order to carry out windproof work in an orderly manner, ensure timely, efficient and orderly emergency treatment on the construction site, minimize accidents, ensure personal and property safety, and maintain social stability, this emergency treatment work plan is formulated according to the Law of People's Republic of China (PRC) on Work Safety, the Provisions of the State Council on the Investigation of Administrative Responsibility for Extraordinary Safety Accidents (the State Council Order No.302) and the actual situation of our construction site.
First, the basic principles of emergency treatment
(1) This plan is the basic procedure and organizational principle for emergency treatment when typhoon affects our site.
(2) This plan is applicable to the emergency treatment of the construction site.
(3) This plan implements the principles of unified command, individual responsibility, close cooperation, prevention first, saving lives, quick response, territorial protection and ensuring safety in the implementation of emergency response.
Second, the organization and command institutions and main responsibilities
Set up on-site wind prevention work command group.
Team leader: Zhang Shuquan
Members: heads of construction teams.
Main responsibilities:
(a) responsible for the formulation and revision of the project wind emergency treatment implementation plan;
(2) Before the typhoon comes, be responsible for notifying the person in charge of the construction site to do a good job of wind prevention, checking the reinforcement of safety facilities on the construction site, and evacuating and transferring the accommodation personnel of temporary work sheds;
(three) arrange personnel on duty, patrol the construction site, in case of casualties, immediately organize rescue and rehabilitation work; Keep close contact with relevant government departments, report the emergency treatment at the scene of the accident at any time or request the necessary rescue forces to reinforce;
(four) after the typhoon, responsible for convening the relevant departments to investigate and analyze the causes of casualties and summarize the emergency handling of accidents.
Third, the implementation of the plan
(a), the typhoon development, is expected to affect our region, the meteorological observatory issued a typhoon news:
1, issue a notice of wind prevention work, and all teams should pay attention to the weather forecast and pay close attention to the typhoon trend.
2, notify the site teams, ask them to pay attention to the preparation of typhoon prevention.
(2) When a typhoon is approaching our city and will affect our region within 48 hours, the Meteorological Observatory issues a typhoon warning:
1, each team shall arrange the construction reasonably and stop the working procedures that must be continuously constructed;
2, do a good job of safety inspection before the typhoon, the inspection content includes whether tic-tac-toe frame is firm, whether the facilities such as grille are firm, including whether the temporary work shed is safe, measures should be taken to strengthen and eliminate potential safety hazards.
3. Strengthen the inspection of the construction site, issue a rectification notice to the problems and hidden dangers found in the inspection, and order the construction team to rectify immediately.
(3) When a typhoon may strike our region within 24 hours, causing serious impact on our region, the Meteorological Observatory will issue an emergency warning for typhoon:
1. The personnel of the construction site wind prevention work command team are in place, and personnel are arranged to be on duty to inspect the construction site.
2. Stop construction at the construction site and evacuate the construction personnel to safety.
3, further check the implementation of various defensive measures, and in a state of war, the implementation of the construction site rescue team in place, and in a state of war.
(4) When the typhoon has landed and weakened to a low pressure, it will no longer have an impact on our city, the Meteorological Observatory will issue a typhoon warning to lift it, and the construction team should check the disaster situation. Strengthen the safety of on-site equipment and facilities in time and summarize the typhoon prevention work.
Typhoon 6 1 emergency plan, general provisions
The purpose of compiling 1. 1
The Emergency Plan for Flood Control and Typhoon Prevention during the Construction Period of the Renovation Project of Daxi River in Yutian Town, Changle City is a defense plan, countermeasure and measure formulated in advance to ensure the safety of the Daxi River project in Yutian Town, protect people's lives to the maximum extent and reduce losses. It is an important basis for the construction unit and the flood control headquarters to make decisions and dispatch flood control and disaster relief. Therefore, the Emergency Plan for Flood Control and Typhoon Prevention of Daxi River Regulation Project in Yutian Town, Changle City (hereinafter referred to as the Emergency Plan) is specially prepared.
1.2 compilation basis
This emergency plan is based on People's Republic of China (PRC) Water Law, People's Republic of China (PRC) Flood Control Law, People's Republic of China (PRC) Flood Control Regulations, Fujian Flood Control Regulations, Fujian Flood Control Emergency Plan, Fuzhou Flood Control Emergency Plan and technical specifications and standards.
1.3 working principle
Adhere to the people-oriented, safety first, always be alert, give priority to prevention, combine prevention with resistance, highlight key points, give consideration to the general, and subordinate local interests to the overall interests; Adhere to the chief executive responsibility system, unified command, unified dispatch, full rescue, and take engineering and non-engineering measures.
Combined, formulate emergency measures to ensure the safety of seawalls and minimize the losses caused by disasters.
1.4 Scope of application
During the construction period, this emergency plan will be launched in time when Daxi in Yutian Town encounters unexpected events such as typhoon, which leads to the following major dangers: excessive flood, serious cracks, landslides, breaches and other dangers that may endanger the safety of Daxi in Yutian Town.
2. Project overview
2. 1 overview
This project is the Daxi River Regulation Project in Yutian Town, Changle City. The total length of Daxi River regulation project in Yutian Town, Changle City is1443m, and the pile number is K0+000-K 1+443. The design moisture-proof standard of Daxi in Yutian Town is once every 20 years.
2.2 Hydrometeorology
Yutian Town, Changle City, located in the southeast coast of China, is the gateway to Fuzhou, the capital of Fujian Province. It is one of the few cities with "two ports" in China and one of the coastal open cities (counties) promulgated by the state. It is also the anchorage of Zheng He, a famous navigator in Ming Dynasty, who made seven voyages to the West, six of which started from Changle. China is a famous hometown of overseas Chinese, and overseas Chinese are distributed all over the world. Overseas Chinese are mainly distributed in Canada, the United States, Europe, South America and Southeast Asia, and are also the ancestral homes of Taiwan Province compatriots. They are mainly distributed in Taiwan Province Province and moved to Taiwan Province Province before the Qing Dynasty. Changle is a famous historical, cultural and economic city, which was called "Zou Lu on the seashore" and "a famous literary country" in ancient times. There are 955 scholars in the past dynasties, and the number one scholar is 1 1. Now it has the reputation of "hometown of overseas Chinese" and "rich private enterprises". It has the transportation advantages of airport, seaport and river port.
3. Risk analysis of emergency situations
This emergency plan only lists the dangers that endanger the safety of Daxi in Yutian Town caused by major emergencies. The main dangers are:
1. Due to the long-term construction of Daxi in Yutian Town, the overall settlement is serious. The dam crest elevation is 7.2- 14.8m, and the Daxi project in Yutian Town started in 20xx, 1. According to the construction organization design scheme, in order to ensure the safety of Daxi project in Yutian town, the construction of mortar embankment should be arranged in a large area before the typhoon flood season.
2. During the construction period, in order to meet the construction requirements, our department plans to construct in sections, and plug the gap five days before the typhoon to prevent typhoon resistance. During the construction period, our department will do a good job in emergency rescue to ensure the safety of Daxi in Yutian Town during the construction period.
3. In order to meet the requirements of the construction period, the slope protection had to continue construction outside the typhoon season, which led to the destruction of the original slope protection surface and affected the safety of Daxi in Yutian Town. After entering the typhoon season, slow down the construction progress, carry out small-area construction, control the demolition of the old slope protection to meet the requirements of the construction surface, control it at about 20m, and restore it three days before the typhoon, and seal the joints with big stones.
4. Seepage, piping and soil flow in the dike: Because the Daxi dike in Yutian Town is constructed by natural compaction method, the dike materials are not dense and the construction quality is poor. When the water level of the stream reaches a high level, seepage in the dike may often lead to piping or soil flow near the toe of the dike.
5. Leakage: There are leakage holes across the dike body near the backwater slope and the toe of the dike.
6. Collapse: Danger caused by sudden local subsidence near the top of Daxi, the water-facing slope, the back water slope and its toe in Yutian Town.
7. Cracks: Cracks are common dangers of earth dikes, and sometimes they may be signs of other dangers, such as landslide cracks. Cracks are divided into surface cracks and internal cracks according to their positions; According to its trend, it can be divided into transverse cracks, longitudinal cracks and turtle cracks; According to its causes, it can be divided into uneven settlement cracks, landslide cracks, shrinkage cracks, freezing cracks and vibration cracks.
8. Landslide: The landslide of embankment is mainly due to the instability of slope, and the sliding force of soil exceeds the anti-sliding force, resulting in landslide danger.
4. Hazard monitoring and reporting
4. 1 Hazard monitoring and patrol
During the typhoon, the dike body shall be inspected at least twice a day. In case of strong typhoon, dangerous situation or other emergencies, the leaders and technicians of the construction project department should command at the scene and organize special personnel to patrol for 24 hours. And make inspection records.
4.2 Processing procedures for monitoring and inspection results
The supervision and inspection personnel are composed of the management personnel of the project department, and the supervision and inspection results are reported to the project manager.
After the dangerous situation occurs, the management personnel should not only arrange special personnel to monitor and patrol around the clock, but also report the dangerous situation to the Daxi Flood Control Management Office of Yutian Town in time and organize personnel to carry out emergency rescue. For emergency measures to deal with major dangers, Yutian Town Daxi Flood Control Management Office must immediately ask Yutian Town Flood Control Office for instructions before implementation.
When Daxi in Yutian Town is in danger, the county flood control and drought relief headquarters or Daxi Management Office in Yutian Town is responsible for emergency decision-making and command, and the leading group for flood control and emergency rescue of the construction project department is responsible for organizing and implementing emergency rescue. The county water conservancy bureau sent relevant leaders to lead technicians to the scene to guide the rescue.
;